最終壓降 的英文怎麼說

中文拼音 [zuìzhōngjiàng]
最終壓降 英文
final-pressure drop
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ名詞1 (最後; 末了) end; ending; finish 2 (指人死) death; end 3 (姓氏) a surname Ⅱ形容詞(...
  • : 壓構詞成分。
  • : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
  • 最終 : final; ultimate最終裁定 absolute decree; 最終裁決 final ruling; 最終產品 [工業] final products; e...
  1. Using the traits of arc adjust itself of the co _ 2 welding, adopting slow - descending feature or even feature of electrical source equipping with system that delivering the welding rod at the invariable speed, then, the arc burning steadily is realized, and the quality of welding is improved

    利用co _ 2氣體保護焊電弧的自身調節特性,採用緩或平硬特性的電源配等速送絲系統,通過改變電源空載電來調節電弧電,再利用電弧電和熔化速度之間的關系調節焊絲熔化速度使之等於送絲速度,實現電弧的穩定燃燒。
  2. This thesis regard internal property reorganization in the group of pangang as the research object, from chengdu seamless steel pipe limited liability company with chengdu iron and steel works inside exterior environment reorganizing in front and back commences, making use of to exceed the makel - bot with of five factors competition models and the method of factors analysis, after analyzing the reorganization of the business enterprise a profession for facing competes the situation. develop the development the business enterprise with the profession industry from the international local profession rival circumstance after analyzing the reorganization should the market position of the establishment with develop the strategy target. make use of the swot the analysis the method, to after the reorganization the development strategy of the business enterprise, from manage the angle proceeded the fixed position analyzes, for after the reorganization business enterprise development provided four kinds of developments strategy that eligibility choose : the brave development strategy, request the resources advantage, funds advantage, human resource advantage, technique advantage that new company make the most of new business enterprise in empress in reorganization, is an essential condition to increases to manage the level, quickly technique reforms, develop the high and additional worth product with new product production line, as soon as quikly change to strong and large business enterprise, realizes soon steel aircraft carrier dream ; dispersion strategy, the technology market quota with deal with produce high additional worth product, completely promote business enterprise brand image, extend high carry product of the exaltation product, is a necessary means to increases business enterprise performance, realizes business enterprise target ; defense strategy, adjusting the business enterprise organizes construction, reducing the intensive type in labor and the low additional worth product line, lower bad the property saves the deal, alleviating the business enterprise burden, attaining the casual wear go to battle, benefitting to the challenge that make frontal attack the rival ; withdraw strategy, compress the production of the high depletion and high cost product, simplify the production craft, controlling the cost of the end product in the lower level, is a valid path to increases business enterprise competition ability

    本論文以攀鋼集團內部的資產重組為研究對象,從成都無縫鋼管有限責任公司與成都鋼鐵廠重組前後的內外部環境入手,運用邁克爾?波特的五力競爭模型及因素分析法,分析了重組后的企業所面臨的行業競爭態勢。從國際國內行業競爭對手情況和本行業發展動態分析了重組后企業應確立的市場地位和發展戰略目標。運用swot分析法,對重組后企業的發展戰略,從管理角度進行了定位分析,為重組后企業發展提供了可選擇的四種發展戰略:即大膽發展戰略,要求新公司充分運用重組后新企業的資源優勢,資金優勢,人力資源優勢,技術優勢,是提高管理水平,加快技術改造,開發高附加值產品和新產品生產線,盡快立於強勢企業之林,早日實現「鋼鐵航母」夢的必要條件;分散性戰略,提高產品的科技含量和生產高附加值的產品,全面提升企業品牌形象,擴大高端產品的市場份額,是提高企業效益,實現企業目標的必要手段;防禦性戰略,調整企業組織結構,削減勞動密集型和低附加值產品生產線,低不良資產存量,減輕企業包袱,做到輕裝上陣,有利於迎擊競爭對手的挑戰;退出性戰略,縮高消耗、高成本產品的生產,低低端產品的比例,精簡生產工藝,將產品的成本控制在較低水平,是提高企業競爭力的有效途徑。
  3. Quick and frequent cutting for a few sets of capacitors shall be carried out, of which the factors of electric power shall be maitained in optimum condition so as to minimize the line loss, increase effective output capacity of distrubuting transformer and optimize the quality of power demand

    對多組電容器進行快速而頻繁的投切,使受電功率因數始保持在佳狀態,從而大限度地低線路損耗和增加配電變器的有效輸出容量,優化用電質量。
  4. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,選擇了技術先進的砂墊層預抬高分級充水預法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預法的適用性研究,其中包括砂墊層厚度、地基沉與固結度、地基穩定性、水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉速率與不均勻沉程度、各分級充水加載階段地基超靜孔與深層水平位移、油罐底板力分佈及地基土強度增長等方面的實測與數據分析。
  5. The self - weight of soil is an important factor affecting consolidation, and once it is taken into consideration, the consolidation becomes quicker and final settlement becomes larger. rheological property of soft soil contributes to delaying consolidation. the influences such as nonlinear variations of compressibility and permeability, rheological and layered properties of soil, self - weight and time - dependent loading are interacted each other and very complicated, and only they are all taken into consideration, can the consolidation behavior of soft soils be actually revealed

    研究表明:大、小應變固結理論的差異隨土縮性或荷載的增大而越趨明顯;土體自重是影響固結的一個重要因素,考慮自重要比不考慮自重固結快、大;土的流變性增大將遲滯軟土地基的固結;土的縮性和滲透性的非線性變化、土的流變性、成層性、自重及變荷載等因素對固結的影響相互交織,錯綜復雜,在固結分析中對之綜合加以考慮,才能真實反映軟土的固結性狀。
  6. 4. aimed at the reduction of bit rate and the improvement of speech quality, a serial of speech coding schemes are studied in a gradual refinement way, and an integrated coding scheme at 1. 5 - 2. 4kbps is presented finally

    圍繞編碼位率的低和語音質量的提高,以逐步求精層層遞進的方式研究了一系列縮編碼方案,並提出一個位率在1 . 5 2 . 4kbps的綜合編碼方案。
  7. Effects on final ground settlement with distribution forms of the contact pressure

    基底力的分佈形式對地基量的影響
  8. In the last part of the thesis the key points are given with the detailed analysis and summarizing for dynamic control technology in subgrade construction, namely the calculations for the settlement in subgrade construction, including the calculation methods for the dynamic control in pre - compacting period, the burying of settlement plates, and the final settlement of the subgrade

    本文後重點對路基施工動態控制技術即路基施工過程中沉量計算進行了詳細分析、總結,包括預期動態控制、沉板埋設、地基計算方法等。
  9. Then, combined with the mechanism of vacuum preloading and based on the layer method, settlement calculation of vacuum preloading was analyzed. the study shows that the vacuum degree under membrane equivalent load method does not accord with the mechanism of vacuum preloading. based on the layer method, vacuum degree difference method and effective stress method are presented. the results show that the final settlement calculated by the vacuum degree difference method is more close to the observation results

    然後,結合真空預的機理,基於分層總和法的思想,對真空預計算方法進行研究:指出用現有的膜下真空度等效荷載法進行沉計算不符合真空預機理;提出了符合真空預機理的真空度差值法與有效應力法,前者所推算的量較接近實測推算結果,後者與實際結果存在一定差距。
  10. In the same time, this paper applied the plane strain fem based on biot theory to analyzed calculated result and observation information hi scene. finally, this paper put forward a settlement forecast model based on the modified gaomujunjie method, using by inversion analysis theory to compare and analyze the settlement process of vhlcp. result indicated that the model inosculated with the fact data and the consolidation degree have finished 86 %, back - work settlement was 87mm

    後,根據實測沉資料,採用一維反演分析法,推導量計算公式,結合改進后的高木俊介固結度計算方法,建立真空堆載聯合預的沉預測模型,並根據計算結果,對比實際沉過程,對比表明:所建沉預測模型與實測數據吻合,由此所得現場試驗的地基平均固結度達86 ,剩餘沉為87mm ,滿足高速公路質量要求。
  11. In the virtual instrument we programmed, real time monitoring the voltage sags, automatic generating report, querying the malfunction report is realized too

    該系統實現了電故障的實時檢測、故障報告的自動生成以及故障報文查詢等功能。
  12. The reliability of secant modulus method is validated in which final consolidation settlement is computed. the experience formula of coefficient of permeability ( k, 0 ) and pore ratio ( e ) is presented and the experience expression of coefficient of permeability ( k10 ) and strain ( ) is offered too. lt is important to modity the acquiring method of coefficient of consolidation, because the method embodies that strain and pressure of consolidation effect on coefficient of consolidation

    本文首先驗證了用割線模量法計算軟土地基固結沉的可靠性;其次得到了滲透參數k _ ( 10 )和孔隙比e的經驗關系,並且更進一步給出了滲透系數k _ ( 10 )和應變之間的經驗公式,更重要的是對求取固結系數的方法給予了改進,該方法反映了固結系數隨應變和應固結力的變化規律。
  13. A pressure draw - down equation is first established for partial penetration gas well in darcy - flow dominated domain in bottom water reservoir, and then a binomial deliverability equation is obtained by combining with non - darcy binomial radial flow equation

    文章首先導出底水氣藏打開不完善井在達西區域的公式,再結合非達西區域的二項式產能公式得到底水氣藏向打開不完善井流動的二項式產能公式。
  14. By lowering blood fat, blood thickness and softening vessels, improving rheological flow forms, the function of impaired organ will be improved and the blood pressure will be also maintained at a permanent normal level, to achieve ultimate permanent hypertension treatment

    通過低血脂、血粘和軟化血管,改善血流流變形態,使受損的器官功能得到改善,血也就會永久性的維持在正常水平,實現徹底根治高血的目的。
  15. Based on actual data, emphasizing particularly on the course of consolidation and deformation of preloading method combing vacuum with stack - load, the paper illustrates the mechanism of deformation of pre loading method combing vacuum with stack - load from consolidation and final effect, and calculates final settlement by delamination summation - method and hyperbola method, presenting relative parameters used for designing and execution control

    摘要以實際監測資料為依據,對真空聯合堆載預法的固結過程和變形過程進行了分析,從固結和效果這兩個基本問題上闡述了真空聯合堆載預法的變形機理,採用分層總和法和雙曲線法推算量,並給出了相關的設計和施工控制參數。
  16. Specific performance : the implementation of batch processing of raw materials procurement and lead to cost reductions, the price decreases to increase competitiveness, thus enabling visitors increased turnover increased, eventually making increased profits

    具體表現為:實施批量原料采購和加工導致成本縮,價格隨之低以增加競爭力,從而使客人增多,營業額增加,使得利潤增加。
  17. The aim is to reduce the reignition rate and over - voltage damage from the perspective of the mechanical characteristics of the vacuum breaker switching shunt capacitor banks

    的目標是從真空斷路器機械特性方面入手,低操作並聯電容器組時的重燃率、並減小操作過電危害。
  18. The influence of various factors, including lowest pressure of the vacuum chamber, water content and size of the sample in three states of solid, lidquid or syrup, on cooling rate and on final sample temperature in self - freezing by vacuum pumping, was studied

    摘要以液態、漿態和固態三種不同類型的物料為對象,通過大量實驗研究了真空室力、物料含水量和尺寸對抽真空自凍結的溫速率和對凍結溫度的影響規律。
  19. Thirdly best maintenance system is determined eventually : the constant temperature is 205 c, the constant pressure is 2 mpa, time of heating up is 3 h ; the time of constant temperature is 9 h and time of cooling down is 3 h

    確定了佳養護制度:恆溫溫度為205 ,恆溫力2mpa ;升溫時間為3h ;恆溫時間為9h :溫時間為3h 。
  20. The action that weak cold air penetrated into the tropical cyclone made the low pressure become vortex potential instability, and finally turned into kinetic energy. the results were that the center pressure of low became lower, the wind velocity around the cyclone was stronger and the precipitation became more

    冷空氣在中低層的滲透主要使大氣斜作用加強,使不穩定能量的積聚並釋放;還造成臺風渦旋位勢不穩定,使熱帶氣旋中心氣低,周圍風力加大,因而產生更大的水。
分享友人