水力連 的英文怎麼說

中文拼音 [shuǐlián]
水力連 英文
hydraulic communication
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  1. To harness these natural resources, the university uses a hydraulic ram to pump nullah water to storage sites for irrigation and flushing

    有見及此,大學善用自然資源,不單以山來灌溉花草和沖廁,就往儲缸的泵,也是利用推動的。
  2. 2. based on the results of experimental data of the tailrace surge tank of yi xing pumped - storage station in jiangsu province, this research investigates the methods for the head loss coefficients of throttled surge tank with linking pipe by means of the method which incorporates experimental results with theoretical analysis

    結合江蘇宜興抽蓄能電站尾調壓室模型試驗成果,採用理論計算與模型試驗結果相結合的方法,對有接管的阻抗式調壓室局部頭損失系數的計算方法進行了討論。
  3. The theory of minimum entropy production or minimum rate of energy dissipation shows that a river is stable when it is in a relative equilibrium condition. ( 3 ) the river facies formulas of alluvial river have been developed using the theory of minimum rate of energy dissipation together with flow continuity and motion equations, suspended load transport or bed load transport equation. ( 4 ) the causes of the river patterns are explained using the theory of minimum rate of energy dissipation

    ( 3 )基於最小能耗率原理,以流能耗率作為目標函數,以續方程、流運動方程及懸移質挾沙公式或推移質輸沙率公式作為約束條件,通過對目標函數求條件極值,分別推導出以懸移質造床為主的顯式河相關系式和以推移質造床為主的顯式河相關系式。
  4. Hydraulic couplings. method of test for couplings intended for use in fluid power systems

    水力連接器.第2部分:流體動系統用接器試驗方法
  5. Hydraulic couplings. method of test for coupling port threads and their seals intended for use in fluid power systems

    水力連接器.第1部分:流體動系統用接器埠螺紋及其密封件的試驗方法
  6. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河工模型和入出流邊界控制條件以及續模擬的方法進行了有關時間變態率的系列試驗,通過模型位、比降、流速、出口流量過程線和斷面挾沙試驗資料的分析,闡明了時間變態引起上述各種參數偏離的主要物理原因:模型的槽蓄響應和洪過程時間變化率的響應滯后。
  7. In addition, a method for evaluating the flow characteristics in multi - strand tundish, which can be applied to the similar water modeling study is introduced in this paper

    本文還提出了多流鑄中間包流動特性的評判方法,為類似的學模擬試驗提供了參考。
  8. Abstract : water modeling of the six - strand caster tundish shows that the original design of the tundish can not meet the technical requirements for inclusion floatation and temperature homogenization

    文摘:通過學模擬六流鑄中間包后發現,原設計的中間包在夾雜物的上浮及溫度的均勻性方面還存在不足,不能很好地滿足生產工藝要求。
  9. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚長江公路大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北錨碇距長江幹流僅250m ,與長江聯系密切,錨碇區文、地質情況復雜,表層淤泥質土及松軟粘土層較厚,基巖頂面起伏較大,且存在斷裂構造,土層具明顯的流變特性。北錨碇基坑為長60m 、寬50m 、深48m的矩形超深基坑,其基礎圍護在國內首次採用矩形地下續墻結構,並獲得成功。
  10. Because of the virtue of automatically switching, simple structure and low cost, etc, the hydraulic automatic tilting gates with connecting lever and rolling wheel have been wildly applied in all kinds of water conservancy and brought much economic benefit

    桿滾輪式自動翻板閘門因其能隨位漲落而自動啟閉,結構簡單、造價低廉,等優點,在各類利工程中得到廣泛應用,並產生了很好的經濟效益。
  11. ( 4 ) the running state and hydraulic property of the hydraulic automatic tilting gate with connecting lever and rolling wheel were analyzed. the open - door curve, start - up water level and shutdown water level were ascertained, then the influence of lower reaches of a river to the running of a tilting gate was analyzed

    ( 4 )析闡述了桿滾輪式自動翻板閘門的工作狀態與特性,推求了閘門的開門曲線、啟門位和回關位,並分析了下游位對翻板閘門運行的影響。
  12. The stability analysis and structural optimization design of the hydraulic automatic tilting gates with connecting lever and rolling wheel were carried out in the paper to make them not only be better applied in all kinds of water conservancy but also be wildly applied in ship project, city environmental protection, and other correlative project, further to better the social and living condition

    本文對桿滾輪式自動翻板閘門進行穩定性分析和結構優化設計,使得它們不僅能更好地應用於各類電工程中,而且能廣泛應用於航運工程、城市環境保護和其他相關工程中,將會對社會的發展和生活環境的改善有著重要的意義。
  13. According to two - dimension flow continuity, momentum equations, suspended sand diffusion equations and two - phase flow bed sand motion equations, hydraulic - dynamics sediment accumulation mathematical model between two impounding dams was set up by adopting the methods of weighting and concentrating masses

    根據二維續、運動方程、懸沙擴散方程和兩相流底沙運動方程,採用加權集中質量剖分方法,建立了蓄兩壩間、泥沙淤積數學模型。
  14. Listed by iapmo, approved by the foundation for cross connection control & hydraulic research at usc

    通過iapmo和位於美國南加州大學內的美國交叉接控制和研究基金會的認證。
  15. As compiled from documented foundation for cross - connection control and hydraulic research at the university of southern california lab tests

    從位於美國南加州大學內的美國交叉接控制和研究基金會測試實驗室文件中編制。
  16. Meets requirements of asse 1056, iapmo, approved by the foundation for cross connection control & hydraulic research at usc

    滿足美國衛生工程師協會( asse ) , iapmo和位於美國南加州大學內的美國交叉接控制和研究基金會的標準。
  17. The labyrinth - type emitter can be directly applied to irrigation experiment, the flow rate of 8 emitter prototypes are mensurated under 12 pressure values on the test - bad. moreover, experimental data are analyzed with multivariable linear regression in matlab, formulas of pressure versus flow and regression plots for 8 different emitters are induced from the regression analyses

    製作出的一體化滴頭原型直接接到性能試驗臺上進行流量試驗,測定了12個壓點下8種滴頭原型的出量;應用matlab軟體中的多元線性回歸演算法對所得試驗數據進行了回歸分析,得出了8種滴頭的壓流量公式和回歸曲線圖。
  18. ( 2 ) some studies are made for the subject of various effects on wave propagation and ground motion of multi - dry, multi - saturated, and alternate dry and saturated soil layers. a comprehensive computer program is compiled, accounting for soil dilatancy, linear and non - linear constitutive relation, rigidity degradation and suiting to any combinations of soil layers, dry and / or saturated with different thicknesses, properties, continuity conditions at interfaces, and inputs at base and top boundaries. from the numerical results obtained for a quite large number of typical cases, some knowledge of general trends of response for, especially, the cases of alternate dry and saturated soil layers are gained both quantitatively and qualitatively

    ( 2 )對不含土層分層排列、飽土層分層排列、不含土層與飽土層分層交錯排列情況下對波傳播和地面運動的影響做了一些研究,考慮到土壤的剪脹性、線性和非線性本構關系,剛度退化等因素,編制了可適用上述各種情況和任意多土層(包括含或不含學性質不同、厚度不同、邊界續條件不同等) ,在不同基底輸入或上邊界輸入作用下的通用分析程序,通過對相當數量的典型情況進行的分析計算,得到了一些趨勢性的認識,特別是對飽與不含土層分層交錯情況,取得了一些新認識。
  19. Although the malinan water supply project was scheduled to be completed in a month s time, the people s concerted effort shortened the work time by about half. two water towers were built - one at the river s source to collect uncontaminated spring water flowing from between the rocks, and the other on level ground conveniently accessible to the people. the water towers were connected by pipes and the water was driven by electric pumps

    科塔巴托省馬里南村的供系統,預計一個月完成,結果由於人民的全合作,不到二個星期已近尾聲了,他們在河流的源處做一個塔儲蓄從巖壁流出來沒被污染的泉,然後再到平地方便大眾提的地方再做一個塔,利用發電機以及大管來和源處的接,就這樣供系統形成了。
  20. Impermeable wall interdicts or weakens waterpower contact of seepage intercomplementarity between groundwater inside dike and river outside dike. especially, mass continuous concrete wall may have made effect on groundwater power field, chemistry field and water resource

    同時由於防滲墻阻斷或減弱了堤內地下與堤外江滲流互補的聯系,特別是建設大規模續防滲墻可能對地下場、化學場以及地下資源等產生影響。
分享友人