沉箱施工 的英文怎麼說

中文拼音 [chénxiāngshīgōng]
沉箱施工 英文
caisson work
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : 名詞1. (箱子) chest; box; case; trunk 2. (像箱子的東西) anything in the shape of a box
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. The design and implementation of caisson ' s integral launching through translatory moving by gasbag and craning by floating crane barge, together with the economic benefit are discussed

    摘要敘述了氣囊平移、浮吊整體吊運下水藝的方案設計和實及給帶來的經濟效益。
  2. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同況(井充填、錨體澆築、主纜架設、梁吊裝、橋面鋪裝以及通車運營)下的過程作了模擬,全面揭示了各況下錨碇井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同況下井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  3. The special - purpose semi - circular caisson installation barge, anding no. 1, built and used for the second phase of the deep waterway regulation project in the changjiang estuary has been technically renovated into a special - purpose caisson launching barge, which, after the renovation, has become a horizontally submerging semi - submersible barge capable of shore touching and bottom resting

    摘要介紹了對原用於長江口深水航道治理二期的專用半圓安裝船「安定一號」的技術改造,使之成為一艘下水專用船舶。
  4. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋程中擯棄了過去一直沿用的氣壓,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁鋼井圍堰鉆孔樁基礎,鋼圍堰在橋梁基礎中的應用越來越多。
  5. Combining theory with practice, in this thesis, i analyses the content of the construction of steel round the barrage. such as, the structure of steel round the barrage, the arrangement of mooring, the calculation of mooring chain, the manufacture and assembling of steel round the barrage, the moving up connection and sinking of it, confining the bottom of underwater concrete

    本文結合實際程,詳細分析了鋼圍堰的構造、錨錠系統的布設、錨纜的計算、鋼圍堰的製作及組拼、鋼圍堰的接高與下、水下混凝土封底等圍堰的重要內容;並對常用的鋼套技術進行了討論。
  6. Combining rizhao port bulk grain wharf and container wharf, this paper discusses the caisson placing construction technique

    結合日照港散糧碼頭和集裝碼頭實際情況,簡要介紹安裝技術。
  7. This paper expounds the main monitoring and controlling points during all construction procedures of caisson structures for no. 8 berth of dalianwan port area, to serve as a reference for similar projects

    摘要對大連灣港區8 (下標# )泊位結構的各道序的監控要點進行闡述,為同類項目的提供參考。
  8. Yacht marina, transport marina, travel marina, pontoon, passenger transport marina, fishing marina, piling dock, heavy load dock, caisson dock, engineering consulting, design, construction

    一、遊艇碼頭、交通碼頭、旅遊碼頭、客運碼頭、漁人碼頭、高樁碼頭、重力碼頭、結構碼頭、浮動碼頭、浮橋、程咨詢、設計、
  9. When the deviation between the placing position and construction reference line of caisson for gravity wharf is big enough, the verticality of upper structure, i. e. crest wall will be affected, and furthermore the visual quality of the wharf will be influenced

    摘要重力式碼頭安裝的位置與準線的偏差過大,會影響上部結構胸墻的豎直度,進而影響到碼頭觀感質量。
  10. Topics include : site investigation ( with emphasis on in situ testing ), shallow ( footings and raftings ) and deep ( piles and caissons ) foundations, excavation support systems, groundwater control, slope stability, soil improvement ( compaction, soil reinforcement, etc. ), and construction monitoring

    主題包含有址調查(強調現地試驗) 、淺基礎(基腳式基礎與筏式基礎)和深基礎(樁基礎與) 、開挖之支撐系統、地下水控制、邊坡穩定、土壤改良(夯實與土壤加勁等)和監測等。
  11. In view of the technical problems of softening of foundation soil and reduction of bearing capacity of the breakwater under the action of repeated wave loads during the execution of the second phase of the deepwater waterway regulation project in the changjiang estuary, tianjin port construction corporation has successfully developed safer, higher quality and highly efficient technology and special - purpose marine craft and machinery for laying deepwater sand blankets and offshore installation of prefabricated drains, which were more suitable for the working conditions in the changjiang estuary, and has also explored the construction technology for prefabrication of caissons with rubber anti - sliding plates, to ensure the efficient implementation of the engineering measures against softening of foundation soil

    摘要針對長江口深水航道治理二期過程中遇到的堤身在波浪重復荷載作用下地基土出現軟化、承載力降低的技術難題,第一航務程局成功開發了適合長江口況的安全、優質、高效的深水砂被鋪設和海上塑料排水板打設藝及專用船機設備,探索了一整套帶橡膠阻滑板的預制藝,確保了抗軟化程措的有效實
  12. To overcome such a situation, adequate technical measures were taken and the prefabrication of the caissons was completed with good quality and sufficient quantity

    針對這種情況採取了相應的技術措,保質保量地完成了該的預制任務。
  13. Associated with engineering practice, two important questions. one being laying - over depth of box foundation and the other being the measures for treating different settlement between main and buildings, are discussed in the view of designing. and the methods for dealing with practical engineering problems are presented also

    結合程實踐,從設計的角度對高層建築基的埋置深度和主樓與裙房間降差異的解決措進行了討論,提出了一些處理實際程問題的措
分享友人