渠道水流 的英文怎麼說

中文拼音 [dàoshuǐliú]
渠道水流 英文
channel flow
  • : Ⅰ名詞1 (人工開鑿的水道) canal; ditch; channel 2 [書面語] (車輪外圈)outer wheel3 [書面語](盾...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • 渠道 : 1. (引水灌溉的水道) irrigation ditch; canal; channel 2. (途徑) medium of communication; channel
  • 水流 : 1. (江河) rivers; streams; waters2. (流動的水) current; water flow; fluent; flow; [水文] stream current
  1. Water runs along the channel to the fields.

    順著進地里。
  2. In recent years, plentiful and substantial fruits achieved by the lb method in simulations of hydraulics, multiphase flows, flows in porous media and heat transfer as well as magnetohydrodynamics, have revealed a broad perspective of application of this method, it will become a powerful competitor to the conventional approaches. in order to absorb the recent achievement in theory and application of the lb method, explore new ways in hydraulic computation to promote the development of practice, some work is car ried out in this thesis, as following : advances in the theory research and application, deductive process of the d2q9 model and some other commonly used models of the lb method are summarized. based on the hydrodynamic and general boundary conditions, a new joint boundary condition is presented, it integrates advantage of the two conditions above and obtains very good results in dealing with all kinds of boundaries of flow fields

    為了消化和吸收近年來lb方法在理論和應用方面的新成果,探索在力計算方面的新途徑以促進lb方法實用化的發展,本文進行了下列研究工作:綜述了lb方法在理論研究和實際應用方面的新進展,以及d2q9模型的推導過程和其他一些常用的模型;在動力邊界條件和通用邊界條件的基礎上提出了一種新的聯合邊界條件方法,它綜合了上述兩種邊界條件的優點,在場的各種邊界處理中取得了非常好的效果,經過模塊化的處理以後這種邊界條件具有更好的實用性;針對均勻網格的lb方法計算效率較低的不足,提出了雙重網格的latticeboltzmann方法,通過二維poiseulle動、后臺階動和方槽動三個算例的模擬,證明這種方法能夠明顯地提高場模擬的計算效率;此外,根據復雜區域場的特徵提出了latticeboltzmann方法的分塊-耦合演算法,利用lb方法的計算特性實現塊與塊之間的數據交換,充分利用計算資源提高計算效率,通過對「 t 」型、 「十」型和「 x 」型分岔管場的模擬,展示了這種演算法的特徵和優點,以及它所具有的應用前景。
  3. Since 1976 it has been made great achievements which has conducted water more than 100 billion m3 and has been an important project of heilongjiang province. but recently the channel has been seriously freezing - melting eroded and sand of cliff edge has been deposited along the channel, which resulted to highten the channel bottom, increase width of the channel and reduce horse road. what all above have affected to apply safely channel so it is necessary to repair comprehensive

    自1976年建成以來,已累計引100多億立方米,取得了巨大的經濟效益,成為黑龍江省西部關繫到國計民生的重點工程,但近年來破壞嚴重,凍融侵蝕強烈,邊壁剝蝕下來的泥沙經搬運沿程發生淤積,導致底抬高,寬增加,馬縮小,已經嚴重影響到的安全運用,必須進行綜合治理。
  4. The system can be widely applied to the measuring of the length of ice in the channel, river, reservoir, the lake, and so on. the system can provide the credible data for the water conservancy system, is promising in the prospect of market

    本冰厚測報儀系統可廣泛應用於、河庫和湖泊冰層厚度、位變化的自動檢測中,為國家的利系統提供可靠的數據,具有很高的社會推廣價值。
  5. Length of navigable inland waterways : refers to the length of the natural rivers, lakes, reservoirs, canals, and ditches open to navigation during a given period, which enables the transport by ships and rafts

    內河航里程:也稱「內河通航里程」 ,是反映內河運網規模、平和發展情況的主要指標;是指在一定時期內,能通航運輸船舶及排筏的天然河、湖泊庫、運河及通航的長度。
  6. In this paper, we study the most serious damming section of the east - one main canal, which is from the entrance of the hao wan flume ( chainage12 + 123. 6 ) to the exit of shang tian yuan tunnel ( chainage24 + 091. 1 ). the main content is analyzing the flow characteristic of the canal, setting up mathematical model of the discharge condition of the east - one main canal, according to the survey section and actual roughness factors, building, bend and so on, we divided the canal into more than loocaculation segments. each segment is calculated by microsoft excel electrical table through computer as permanent transition flow of non - prismatic channel

    本論文研究的段為陸渾灌區東一乾最為嚴重的段,從郝灣渡槽進口(樁號12 + 123 . 6 )至上天院隧洞出口(樁號24 + 091 . 1 ) ,其主要內容是,分析渠道水流特徵,建立東一乾狀況的數學模型,根據測量斷面及實際糙率、建築物、彎等因素的不同,將劃分成120多個計算段,每段按非稜柱體恆定漸變,運用microsoftexcel電子表格進行編程計算。
  7. A dead - end channel extending from the main stream of a river

    潭,死河從主河出來的死
  8. Using a " vortex intake " device, the underground drainage system has the dual benefit of relieving storm flow in downstream urban areas in districts such as western and kennedy town, and avoiding the difficulty of constructing or enlarging drains and culverts in urban areas and the resultant disruption to traffic that may ensue. the " vortex intake " project is a significant piece of hku s research achievements, and exemplifies the collaboration between academia, industry and government

    漩渦進口的力工程,不單可以紓緩西區及堅尼地城一帶于暴雨時,因大量急湍的往下沖而造成浸及危險的問題,還避免了在市區興建或擴建排及暗的工程;在鬧市中進行此類工程十分困難及費時,並且一定會阻礙交通,帶來不便。
  9. This system has some functions as following : first, statistic analysis and valuation of the spatial distribution of beijing traffic noise ; second, real - time simulation of the affection that is traffic noise in residential area ; third, previewing statues and standards of environmental noise ; fourth, management of spatial data and property data ; fifth, alternant querying of spatial data and property data ; sixth, inputting graphs and tables. we can build accurate and identical channels of information ' s coming, accelerate the circulation rate of environmental information, and increase the efficiency of environmental information resources by studying and implementing metropolitan environmental noise management information system. meanwhile, it can reduce the burden of these environmental workers

    城市路交通噪聲信息管理系統的研究與實施可以建立準確、一致的信息來源,加快環境信息的通速度,提高環境信息資源的利用率,減輕環境工作者的工作負擔,提高環境管理工作中的效率,為環境管理和環境規劃與評價提供依據;該系統的建立與開發同時也為開發類似系統的環境工作者提供參考和借摘要一鑒,為今後實施集、氣、噪聲、固體廢棄物為一體的環境管理信息系統平臺提供了一個子框架。
  10. The channel of such a current

    湍急的這樣一股
  11. Study on optimization model for unequal outlet flow in irrigation channel system

    灌溉口非等量配優化模型研究
  12. ( 1 ) to follow the rule of exchange on equal value, and attach importance to the role of value law ; ( 2 ) to strengthen the basic status of agriculture and keep the form of system of ownership stable in the countryside. ( 3 ) to deal with the relation of accumulation and consumption correctly, strengthen economic construction and raise the level of citizen life. ( 4 ) to renew and perfect rational rules, and carry out the rule of being paid for his work done

    劉少奇勇於面對現實,運用馬克思主義基本原理,深入分析我國的國情和建設現狀,提出了許多富有獨到見解的理論觀點:嚴格遵循等價交換原則,重視價值規律作用;加強農業的基礎地位,保持農村的所有制形式相對穩定;正確處理積累與消費的關系,加強經濟建設、提高人民生活平;恢復和健全合理規章制度,貫徹按勞分配原則;施行經濟核算,改革企業經營管理;改革通體制,疏通;改革工業管理體制,試辦托拉斯。
  13. Based on the analysis of commercial banks " current concept about fund management, this paper brings forward that fund management is the main - string in its operation, and that the concept of fund management, including security and profitability, is extended from current " forrying fund " to the management of the fund cost and fund risk the paper comprehensively discusses the principle of fund management, the management of fund costs, the tactics of management about fund liquidity, the measures of management about fund risks and how to solve the problems on interest risk in the period of frequent interest fluctuation. the paper puts forward ideas on how to improve the fund management. the security, liquidity and profitability of the fund, which are both contradictory and integrated with one another, are internal factors of fund management. fund liquidity is traditional core question. commercial banks face with a number of risks of witch credit risk is the greatest one because our country has adjusted interest rates 8 times since 1996, which covered a period of frequent interest fluctuation

    商業銀行面對許多風險,但最大風險是信用風險。由於我國自1996年以來已連續調整了8次利率,近幾年是利率波動頻繁時期,研究利率的敏感性問題顯得特別重要。要改善資金管理,提高商業銀行的經營平,就要建立資金管理是商業銀行經營主線的理念,對資金要統一規劃和管理;要改革銀行的體制,建立現代企業制度和法人治理結構,在體制上為資金管理提供有利的運行平臺;增加改善資金動性管理所需的貨幣政策工具,擴大資金調控手段;打破貨幣市場的僵化局面,為資金管理創造有利的宏觀環境;續續優化負債結構和負債載體設計;增強資金信用風險規避和化解的措施;通過銀行資源整合,努力尋找資金的安全投放,最終完成經營模式由傳統型向現代型的轉變。
  14. And the relation between these velocity was analyzed at last. this is the conclusion : ( 1 ) the distribution of the velocity and concentration are get in the open channel flow and as the sewage flow is gravity flow, the equations is fit for this too. ( 2 ) generally speaking, the self - cleaning velocity should be the starting velocity, and it could fit for the self - cleaning target in limited sense theoretically, but when facing some higher requirement, it is not large enough

    最後結合污動的最小設計速與顆粒起動速、臨界不淤速的關系進行了分析,結論如下: ( 1 )文中所得出的速度分佈與濃度分佈是在明兩相動情況下推得的,由於污動多為重力,是明中的一種,所以文中的分析在認識污動特性方面具有一定的參考價值。
  15. The original flow rate formula of parobolic throat flume used for u - shaped channel is implicit function and is not convenient for calculation in irrigation districts. an simplified formula is developed in this paper, with a di fference between results calculated with the original formula and the new formul a being less than 0. 5 %

    用於u形的拋物線形喉口式量槽原量公式為隱函數形式,針對其使用不便的現狀,通過理論分析推導出了顯函數形式的量量公式,計算結果與原量公式比較相對誤差值0 . 5 % 。
  16. The yellow river water environment information management system is a computer network system covering the whole basin, the construction of which includes a computer network construction and software development. the software involves database, gis, and man - machine interface. the investment in the system is huge and the period of construction is long, thus, a good design is very important. the design schemes are summarized in this paper. according to the present computer technology, some new methods used in network design and software development are introduced, and it is suggested that expandability and opening of the system should be considered in system construction

    黃石?電站輸地處地質結構比較復雜的地方,由於建成投運的時間較早,且原設計的標準較低,糙率較大.在電站機組已更新改造的情況下,若不進行輸挖潛改造,已難于滿足電站機組的設計量要求.經反復比較,決定採取減小糙率的方案,對輸進行三面光護面加固防滲,增加過,效果很好
  17. Now, most of the design of the sewage is according to gravity flow and we looks on the flow as water flow

    目前的污設計大多按重力考慮,認為其動狀態為均勻,與清在明中的動類似。
  18. For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration

    如東一乾上段太平橋以上設計量45m ~ 3 s , 1989年9月30日實測通量23 . 8m ~ 3 s時,東一乾郝灣渡槽出口漸變段末端位已達到設計位4 . 3m ,其下游至上天院隧洞位也普遍偏高,即東一乾上段目前僅能通過量24m ~ 3 s左右,只有設計值的50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內的經濟發展,而且使經常處于小量、高位運行,延長了次通時間,大大增加了工程的安全管理難度。
  19. A facility method for calculating depths of uniformity flow in u type channels

    均勻深的簡捷計算方法
  20. It then runs along channels to different parts of the garden

    沿著往菜園的各個部分。
分享友人