礦山工程 的英文怎麼說

中文拼音 [kuàngshāngōngchéng]
礦山工程 英文
mine engineering
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : 名詞1 (地面形成的高聳的部分) hill; mountain 2 (形狀像山的東西) anything resembling a mountain...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 礦山 : mine; hacienda; diggings; bal; groove礦山安全 mine safety; 礦山測量 [采礦工程] mining survey; lat...
  1. Lp series chain crusher apply to fertilizer production in the block of broken, but also widely used in chemical industry, building materials, mining and other industries, aircraft used in the process of crushing the synchronous speed high - intensity resistance mo carbide chain plate, i expected out of rational design, materials uniform broken, it is not easy nien wall to facilitate cleaning

    Lp系列鏈式破碎機適用於復合肥生產中塊狀物的破碎,同時也廣泛用於化、建材、等行業,該機在粉碎過中採用同步轉速的高強度耐?硬質合金鏈板,進出料口設計合理,破碎物料均勻,不易粘壁,便於清理。
  2. Abstract : considering the stochastic characteristic of main hydrogeologic parameters in yuanbaoshan open coal pit, a groundwater stochastic management model for optimal drainage borehole design is established. the result of the modeling shows the effect of stochastic characteristics of hydrogeologic parameters on the result of management modeling. it was found that the higher the parameters uncertainty and the management reliability level, the worse the management result

    文摘:從影響元寶露天地下水疏乾的主要水文地質參數隨機性特徵分析入手,建立並求解了元寶露天疏干優化設計的隨機地下水管理模型,揭示了水文地質參數隨機性對管理模型結果的影響,認為參數的隨機性越大,管理結果越壞;置信水平越高,管理結果越壞,且滲透系數和邊界條件對管理結果影響最大。
  3. No matter the construction of the house, municipal utilities and mine project, and even the harnessing design of geological cala mity etc., all will be done by us with same splendidness, we will offer the best products and the most high - quality service, making our customers and the customer ' s customer carefree

    無論是房屋、市政、礦山工程的施,乃至地質災害的治理設計等,每一項我們都做得同樣出色,提供最好的產品和最優質的服務,讓客戶和客戶的客戶無憂!
  4. To evaluate the mine engineering geological conditions and for making - up an engineering activity plan that guides the mine development, an engineering geological environmental analysis of aoshan mining area in nanshan mine, maanshan iron and steel co. was made. through rock property analysis, single factor analysis and comprehensive evaluation, the coordinability of various factors were determined

    為評價礦山工程地質狀況,指導開發的活動規劃,開展了馬鋼南區的地質環境分析,通過巖性分析、單因素分析及綜合評價,得出各因素的可協調性結果。
  5. Preliminary discussion on mine project construction and inspection

    淺談礦山工程建設與監理
  6. Study on all position supervision in mine construction engineering

    礦山工程建設全方位監理的思考
  7. The development of project ' s outlay computation information system for mine

    礦山工程結算信息系統的開發實踐
  8. Reasons for out - of - control of mine construction investment and measures to be taken

    淺析礦山工程造價失控原因與對策
  9. China mine engineering

    中國礦山工程
  10. Sika has become the leading supplier of tunnel and mining products being at the forefront of research and development in this field

    西卡公司現已成為隧道礦山工程業外加劑供應商的領頭羊,處在此類產品研發的最前沿。
  11. Tjk is a large - and - middle - sized state enterprise majoring in construction and implement. it produces many shortcomings for the economic system problem as well as most state enterprises

    中國建材天津礦山工程公司是一家國有了中型建築施企業,同大多數國企一樣存在著由於體制問題引起的多種弊端。
  12. Six soil forming factors are analyzed for how they influence soil forming of engineering disturbed soil in mining areas, and so artificial factors for their effects

    同時,以西平朔露天煤為例,分析了六大成土因素對于礦山工程擾動土這種特殊的人土壤形成的形響,並分析了人為因素在其中所起的作用。
  13. Mining for minerals from shallow place to deep place, survey technology of deep mine s construction project has decisive effect to opening deep minerals during shallow minerals are being mined and mining under 1 km

    深部礦山工程測量技術在實現淺部床正常開採的情況下進行深部開拓和千米以下床開采過中起著決定性的作用。
  14. The essential problem with the restoration of mining engineering disturbed soil is to reconstruct soil profile, form proper soil physical and chemical properties in a very short period of time, and improve soil environment quality

    礦山工程擾動土人再造的實質問題是土壤剖面的重新構造,並在較短的時間內形成適宜的土壤理化性狀,改善再造土壤的環境質量。
  15. We discussed the main characteristic parameters of seismic kinesiology and dynamics of mine engineering fracture zone, including relative amplitude, phase time of wave crest, similarity factor, principal frequency band energy, 3 - d space time gradient and coherent coefficient et al., and puts forward the processing method of 3 - d seismic characteristic parameters about denoise - smoothing, generalization, correlation analysis, characteristic transformation ; and presents the method of pattern recognition of mine engineering fracture zone

    摘要本文從時間域、頻率域、三維空間域介紹了礦山工程裂隙破碎帶主要的地震運動學、動力學屬性參數,包括相對振幅、波峰相位時間、相似系數、主頻帶能量、二維空間時間梯度和相干系數等,提出了礦山工程裂隙破碎帶三維地震屬性的去噪平滑、歸一化、相關分析、特徵變換的處理方法以及裂隙破碎帶的模式識別原理與方法,並用實例說明了該方法的應用效果。
  16. Yantai dazheng science and technology development center, that formerly was named shandong yantai gold design and research institute is situated at the golden beach and beautiful port city, yantai. it is an integrative enterprise that engages in science and technology work such as different kinds of research and design of gold engineering and construction, comprehensive utilizing and exploitation of geothermic water, design of central heating and air conditioning, intelligent system integration, machine manufacture, project contract and installation

    煙臺大正地熱空調設備有限公司(原東省煙臺黃金設計研究院)位於黃金海岸、風景秀麗的港城? ? ? ?煙臺市,是一個集各類和建築科研與設計、地熱水的綜合利用與開發、暖通與空調系統設計、智能系統集成、設備製造、承包、安裝施於一體的科技型企業。
  17. Several issues to be considered such as adaptability, safety, interface and ancillary works in process of design logistic system for mine engineering project were discussed by combined experience in mine logistics system design with mine safety operation management and technology development state

    摘要結合多年物流系統設計的經驗,從有利於安全生產管理並結合目前技術發展的現狀討論了礦山工程設計中物流系統的適應性、安全保障、系統的介面以及物流系統中的輔助作業等問題。
  18. In an effort to modernize production, a chinese industrial complex hires a german engineer to supervise the assembly of new machinery from europe. called away by his company, the engineer returns to find that a total incompetent has replaced his first chinese interpreter

    由一枚象棋子引起的所謂黑炮事件,使礦山工程師趙書信被卷進一股漩渦之中… …令人痛心的黑炮事件使國家損失了上百萬元,可是黑炮最後還是黑炮。
  19. Main problems are the anti - slide test report and inspection record of high strength bolts that connecting structure steels have not been provided according to the requirement of design ; since there is no measurement certificate attached to the test report issued by the jincheng mine project quality inspection station of shanxi coal mine industry administration bureau, it will not be allowed to use these test reports as the one of unit project quality control documents

    主要是未按設計要求提供出鋼架連接處高強度螺栓抗滑移系數試驗報告和檢測紀錄;由西省煤炭業管理局晉城質量檢測站出具的試驗報告無計量認證章,在今後的中不能再作為單位質量控制資料中的試驗報告。
  20. Concept, methods, characteristics and influential factors of artificial rebuilding of mining engineering disturbed soil with the connotation that artificial rebuilding of soil is to restore and reconstruct land destroyed in mining by artificial means

    摘要提出了礦山工程擾動土人再造的概念、方法及特點,認為土壤人再造即主要通過人為措施再造土壤,是破壞土地的土壤恢復與重建。
分享友人