背斜軸 的英文怎麼說

中文拼音 [bēixiézhóu]
背斜軸 英文
anticlinal axis (saddle axis)
  • : 背動詞1. (用脊背馱) carry on the back 2. (擔負) bear; shoulder
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : 軸Ⅰ名詞1. (圓柱形的零件) axle; shaft 2. (對稱部分的直線) axis 3. (圓柱形的纏繞器物) roller; spool Ⅱ量詞(用於纏在軸上的線以及裝裱帶軸子的字畫)
  1. Brachy - anticline fold

    褶皺
  2. The author suggests that the three lithosphere - scale faults, lancangjiang fault, jinshanjiang - ailaoshan fault and axis fault in the middle of the basin, are the main geological structures that control the formation of basin, magmatism and metallogenic congregate district. the anticline structure with an axis of triassic strata and the related fault system within the basin, and gonglang arch - shaped folding structure in the south of the basin are the geological structure controlling the formation of ore fields. junctions of two or more faults with different orientation, interlayer cataclastic structural zone and oxidation - reduction ( redox ) boundary were the favorable position for the formation of ore bodies

    認為瀾滄江斷裂、金沙江-哀牢山斷裂及盆地中斷裂這三條巖石圈斷裂是主要的控盆-控巖(巖漿巖)構造及礦集區尺度的控礦構造;盆地中以三疊系為構造及相關的斷裂系統、盆地西南緣公郎弧形構造等是礦田尺度的控礦構造;多組斷裂的交叉、層間破碎帶及地層柱中的氧化還原界面是形成礦體的有利部位。
  3. Axial geanticlinal uplift

    向地隆起
  4. Through the study we know the valley of syncline and the peak of anticline are all good storing places of ore - forming element. to form large industrial ore deposit, the condition of magma channels and the metallogenic fluid must be up to the mustard synchronously

    研究結果表明,礦體的形成過程中,向構造的凹部和構造的部虛托部位都是成礦的有利位置,但僅此還不夠,還應該有較好的通道條件和豐富的含礦流體來源。
  5. The limited hydrothermal karst and mixed zone beneath the anticline axis controls the porosity distribution of ordovician system and it is anticipated that surroundings of the axis of fold formed by compressional reverse orverthrusting during indo - chinese epoch and the coordinated area of morphology of anticline in the screen of buried hill and that of top surface morphology is the best position for development of the reservoir

    局限的熱液巖溶和裸露的背斜軸部之下的混合帶對千米橋潛山奧陶系孔隙分佈具有重要控製作用,預期在印支期擠壓逆沖作用形成的背斜軸部,特別是潛山內幕形態與潛山頂面形態相互協調的區域,應是儲層發育最好的部位。
  6. Research also leads to some directions for future in vestigation. in the dissertation the development actuality of correlative tracking technology around the zenith are summarized by the numbers. three solutions are presented, that is, tilt azimuth axis design, three - axis design, program steering

    本文以測星精密光電望遠鏡和地基激光反衛星跟蹤望遠鏡項目為課題景,在系統的總結國內外過天項目標跟蹤技術發展現狀的基礎上,歸納出三種解決方案:方位方法、增設次俯仰方法、程序引導方法。
  7. ( 2 ) based on deterioration model of owerage bond stress of beam reinforcement accounting for effect of axial compression ration and number of displacement loops, and stress - strain relationship of the concrete in the joint core accounting for effects of both softening and confinement, the modified compression field theory was employed to simulate behavior of the joint core under loading reversals. analysis by means of the program jap on the tested specimens in this paper and those obtained from other researchers produced consistent results

    根據本文建立的考慮壓比和位移循環次數影響的梁筋平均粘結應力退化模型和考慮軟化效應、約束效應的核心區混凝土應力應變關系,通過在試驗中得出的節點核心區混凝土、箍筋、節點正面、面柱筋在反復荷載下的受力特點,利用壓場理論模擬節點核心區在反復受力過程中的受力狀態。
  8. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的力分佈規律、開挖方式及原始邊坡形態對土釘的力的影響、上下階邊坡在土釘力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾及墻有摩擦時的坡面豎向應力分佈、面板土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板土體中卸荷拱的存在對面板受力有利等結論。
分享友人