設計外載 的英文怎麼說

中文拼音 [shèwàizǎi]
設計外載 英文
design external loads
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ名詞1 (外面) outside; external side 2 (外國) foreign country 3 (以外) besides; beyond; in ...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  1. Based on the modern design theory of tunnels construction that the adjoining rock be regarded as primary load - bearing structure, this thesis have made researches on the stability of tunnels mother rock and the safety of support pattern under the high external waterpressure and high geostress

    這就使本隧洞工程的建面臨著極大的挑戰。本文是在將圍巖作為主要承結構,支護與圍巖共同作用的現代隧洞理論的基礎上,來研究高水壓力及高地應力下隧洞圍巖穩定性及支護結構安全的。
  2. Newcastle disease virus ( ndv ) strain 695, a thermostable nature avirulent strain, were replicated in embryonated chicken eggsand its rna was extracted from allantoic fluid. referred to the reported sequence of f gene, a pair of primers were designed and synthesized. f gene of ndv b95 strain was amplified by rt - pcr, the pcr products were checked by agrose gel electrophoresis and purified by agrose gel fracion method

    利用從國引進的新城疫熱穩定性天然弱毒b _ ( 95 )株接種spf雞胚繁殖病毒,經處理后提取病毒的基因組rna ,參考國內發表的ndv融合蛋白基因序列,一對特異性引物,經反轉錄聚合酶鏈式反應( rt - pcr )擴增出約1700bp大小的特異性片段,將此片段回收純化后,利用t - a克隆技術將其克隆到pgem - t - easy克隆體中,再轉化大腸桿菌jm109感受態細胞,轉化后經分子量比較、 pcr鑒定和酶切分析篩選陽性克隆。
  3. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承力問題進行了實用化的探討,提出了考慮地基變形的地基承力上程算方法;對基於彈塑性理論分析的地基承力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承力界限荷p _ ( 1 / 4 ) ,並與國內土力學專著及地基基礎規范中的條形基礎(平面問題)的界限荷p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前規范引用土力學承力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基規范中的難點? ?樁端巖基承力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法算、土力學算及深斤荷試驗四方面進行了深入討論;本文作者根據多年現場荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,了側壁支撐反力加系統,該加系統具有實用、簡便、穩定及安個等優點。
  4. Thus the use of steel fiber reinforcement concrete in corbel can avoid complicated calculating in design, and the diminish difficulty of construction, at the same time when corbel ' s dimension can not be increased the reinforcement concrete corbel ' s ultimate load capacity and anti - seismic performance can be improved by the addition steel fiber into concrete. this method has become a kind of applied method and is highly concerned by the domestic and international academe and engineer group

    因此,在配筋密集的牛腿中使用鋼纖維混凝土可以避免時繁雜的配筋算、減小施工難度,同時在牛腿截面尺寸不能增大的情況下,可以通過加入鋼纖維來提高鋼筋混凝土牛腿的承力和抗震性能,用鋼纖維加入鋼筋混凝土牛腿已成為一種實用方法受到了國內學術界和工程界的極大關注。
  5. On the basis of investigation on the related researching achievements home and abroad, this thesis puts emphasis on studying the counterforce on the pile head and the sedimentation characteristics of the piled raft foundation under the vertical loads, considering the superstructure ’ s effect. and then, this thesis probes into the principles, methods and processes of balance design method for variable - rigidity

    在分析國內相關研究成果的基礎上,本文主要研究豎向荷作用下考慮上部結構影響的樁筏基礎樁頂反力及沉降特性,並在此基礎上探討了變剛度調平的原理、方法和步驟。
  6. Klingelnberg cyclo - palloid spiral bevel gear has construction cramped, excellent transmission quality, low noise and loaded vehavior, it ’ s the main form of gear drives in the bevel gear ’ s technology field. it ’ s cyclo - palloid system, two - part cutter head and high power gears ( hpg ), has certain technology particular than gleason spiral bevel gear. systemic analysing the manufacture principle and meshing principle of klingelnberg cyclo - palloid spiral bevel gear, for accomplishing design theory and analysis method, for enhancement manufacture precision and loaded behavior, for promotion and applied in engineering field, have important theory value and actuality meaning. main work of the paper is tooth form emulation and tooth contact analyse of klingelnberg cyclo - palloid spiral bevel gear

    克林貝格( klingelnberg )延伸擺線齒錐齒輪結構緊湊、傳動性能優良、噪聲小、承能力高,是錐齒輪技術發展的主要齒制,其連續切削法,雙層刀盤技術和硬齒面刮削法( hpg )相對于格利森制齒輪有一定的技術特點。系統的分析這種齒輪的加工原理和嚙合機理,對完善其理論和分析方法,提高加工精度和承能力,在工程中推廣應用具有重要的理論價值和實際意義。
  7. Based on the close analysis of the influence factors of the vertical bearing capacity, circular aperture extension theory is employed to establish the computing formulas for the pile vertical stress and the foundation vertical bearing capacity, respectively. moreover, with analyzing the features of the calculation parameters such as materials of gunite mortar, jet pressure, diameter of the jet pipe, pile length, pile layout, a design theory for chemical churning pile composite foundation is proposed. then, the variation of the pipe deformation with loads, the deformation coordination of pile and soil are studied

    在此基礎上深入探討了旋噴樁的樁土受力特性及其復合地基的加固機理,從影響旋噴樁復合地基豎向承力的因素入手,基於圓孔擴張理論給出了樁體豎向應力及旋噴樁復合地基的豎向承算公式;通過對噴射漿液、噴射壓力選取、噴射直徑估算、樁長及樁位等各種算參數的深入分析和研究,提出了一套相應的旋噴樁復合地基算方法;通過算分析,深入探討了旋噴樁復合地基變形隨荷變化規律、樁和樁間土變形協調關系、樁土應力比及復合地基壓縮模量的確定,並提出相應的方法和修正參數;此,結合工程應用,對旋噴樁復合地基的施工技術及其現場質量檢測方法進行了較全面的探討。
  8. The measurement amplifier is designed to be installed in a control cubicle and can be put on a carrying rail in a top hat rail housing made of extruded sections

    這個測量放大器是安裝在控制機箱內,也可以安裝在由擠壓型材製成的頂帽式導軌殼的承軌上。
  9. The primers were in the sequence of vector pegfp - 1 outside the lox sites, and the whole sequence of the vector were transfected into the fibroblast cells

    引物的位置是在loxp和lox511之體序列,整個體序列都隨轉染而進入細胞。
  10. Product introduction : " beifang neoplan " luxury coach series is designed and manufactured after introducing the whole set of technologies, key equipments and fixtures of the neoplan company of germany. with 12meters long prestressed envelope body, with monocoque and space frame, rear - mounted water - cooled engine, air spring suspension, elevating coach body, separate suspension fore axle, 2f power - assisted steering system, 11m3 luggage compartment, external swinging automatic door, warm and cool air conditioner, large complete rubber - laminated windshield, abs system

    產品簡介: 「北方-尼奧普蘭」系列豪華客車是我廠引進德國尼奧普蘭公司全部技術關鍵備,夾具製造的具有世界先進水平的系列豪華客車,具有12米長預應力蒙皮車身,無大樑全承式車架,後置水冷發動機,空氣彈簧懸掛可升降式車身,獨立懸掛前橋, 2f助力轉向系統, 11立方米行李倉,擺式自動車門,冷暖氣空調,大型全幅夾膠前風擋玻璃, abs系統。
  11. In this paper, a field strain of infectious bronchitis virus was isolated from proventriculus tissue, morphological observation by electron - microscope and the biological characterizations of the virus were studied, pairs of specific primers are designed and synthesized in correspondence with them, according to the published sequences of infectious bronchitis virus three structural protein ( spike protein s membrane protein m nucleocapsid protein n ) genes, the cdna of si gene, s2 gene, m gene. n gene of ib v isolate lx4 were amplified by rt - pcr and full sequences were first reported

    在此基礎上,根據國內已發表的ibv基因序列,分別特異性引物,應用不同引物進行反轉錄合成cdna ,分片段對ibv的主要結構基因進行pcr擴增,並分別將各個目的片段克隆到puc19體上,在大腸桿菌dh5中實現目的基因的分子克隆,經藍白斑篩選、限制性內切酶分析、 pcr鑒定,篩選出重組陽性質粒,並對各個目的基因片段進行序列測定,從而獲得ibv主要結構基因全序列。
  12. This paper summarizes the general characteristic and design principle of the continuous cold - formed steel purlins of the z - section and introduces domestic and overseas development of the continuous cold - formed steel purlin of the z - section, analyzes a variety of the factors effecting the continuous cold - formed steel purlin of the z - section

    本文簡單介紹了冷彎z型鋼檁條的一些特點和冷彎z型連續鋼檁條的原則以及國內、關于冷彎z型連續鋼檁條研究動態,分析了影響冷彎z型連續鋼檁條承力的各種因素。
  13. 2 ) the structure elements should be laid out symmetrically and uniformly when designing steeve - arch structure, what ' s more, the reasonable selection of section geometric size near the arch foots of first beams is paid attention to and the arrangement difficulties of steel bar due to the big eccentric pressures 2, the analyses of anti - seismic features on transverse direction of the aqueduct l ) the method of adjusting the elements " mass can be harnessed in order to even the layout of seismic loads

    2 )吊桿式拱架支承結構時,各部分構件應當均勻對稱布置。另,還應注意頭道梁拱腳附近截面的尺寸擬定,克服地震內力造成的大偏心受壓狀態給結構配筋增加的困難。 2 、橫槽向抗震性能分析1 )可利用調整構件質量的方法,使得結構的某些構件的地震荷分佈均勻一些。
  14. It makes use of resource of the chip, realizes the development of every module, achieves distilling of telegraphese, builds up new frame, calculates the position and provides external interface. in the section of calculating the position, the author combines the two measures of carrier phase position and code position. finally, in the platform of matlab, the author completes the function simulation of main modules

    概述了接收機的原理;詳細描述了基於ti公司的tms320c6713dsp晶元的系統程序中各模塊的實現,利用該晶元的資源,實現各模塊的調度,完成對導航電文的提取,重新組幀,定位解算以及對介面;在解算部分,把波相位定位與碼測距定位相結合,利用波相位對偽距的平滑來提高定位精度;在matlab平臺下進行了各模塊的功能模擬測試,以模擬結果的圖表來分析說明了波相位平滑偽距的兩種演算法能使定位精度有一定的提高。
  15. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱頂面有保護層剝落、箍筋露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原的強度要求; ( 2 )從承力方面看,在風荷、地震作用下,肋拱基本滿足要求,個別排架橫梁不滿足要求,肋拱連系梁普遍不滿足要求;入水平橫槽向地震作用的工況為控制工況。
  16. An important step in structure design is the calculation of the ultimate flexural strength of external prestressed concrete beams, which needs to calculate the ultimate stress increment of external tendons first

    結構的一個重要環節就是極限承算,而算體預應力混凝土梁的極限承力就必須求得梁在破壞時的體筋應力增量。
  17. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準防、兩階段方法、彈性反應譜算理論,運用橋梁結構非線性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行算;通過收集大量的實橋資料,經分析算,歸納總結出算上下部結構相對位移的簡便算方法;並綜合國內的經驗值,提出梁的支承長度se的原則;同時運用動力學突加荷的原理,推導分析了預應力鋼絞線式(鋼棒連接式)落梁防止裝置力的算方法和伸長量s _ f的取值;最後本文通過實橋算,說明了落梁防止系統的方法。
  18. This paper introduces the development and present situation of vibration absorb technology in the world ; generally analysis the rubber - bearing ( rb ) and lrb " s operative mechanism, function and the calculation of parameter ; advance the concept of standardization to lrb ; on the basis of generally analyzing the connected factor such as the site category, the diameter of lead bar, the height of bearing, the designing carrying capacity, the span of bridge, the inherent period and the displacement of rb, determine the parameter, the absorbing vibration target, the method and the process of standardization to lrb ; then according to the two - step rule of resisting and defending earthquake, and combining with the response spectrum theory in the seismic vibration of bridge, make a lot of calculation and analysis of vibration absorb design to the real bridge collected and combined by finite element program ; at last, gives the result of standardization through diagram and explains to its usage

    本論文介紹了國內減震技術的發展和現狀;綜合分析了普通板式橡膠支座和鉛銷橡膠支座的工作機理、性能及參數的算;提出了鉛銷橡膠支座標準化的概念;在綜合分析場地土、鉛銷直徑、支座高度、力、橋梁跨徑、固有周期以及支座變位等影響因素的基礎上,確定了鉛銷橡膠支座標準化的參數、減震目標、方法和過程;並根據抗震防兩階段原則,結合橋梁地震振動理論的反應譜法,運用有限元程序對收集和組合的實橋進行了大量減震算和分析;最後以圖表的形式給出了鉛銷橡膠支座標準化的結果,並說明了其使用方法。
  19. Multi - span plastic greenhouse structure design theory has been studied systemic which include design loads, design methods and system optimization designs aimed at the situations above - mentioned, meanwhile, theory analysis and designs have been completed for series east - china multi - span plastic greenhouses in accordance with the local climate characteristic. some elementary conclusions are summed up : ( 1 ) in the aspect of multi - span plastic greenhouse structural design loads researches, based on the contrast analysis of loads provided in foreign and chinese standards, analysis and discussion are mentioned about the definition loads, the estimation and load cases for multi - span plastic greenhouse structural design in details, some conclusions are summed up first : i, wind load : under the present conditions, it is unnecessary to

    得到一些初步的結論: ( 1 )在連棟塑料溫室結構研究方面,從分析比較國關于溫室建築及我國工業與民用建築規范的角度出發,針對連棟塑料溫室結構中的荷定義方法、算取值、荷組合等進行了較深入的探討和分析,首次得到以下結論: 、風荷:在現有條件下,考慮風壓高度變化系數、陣風作用因子和風荷體型系數,按中國建築結構荷規范( cbj9 ? 87 )算風荷是可以的,不必進行重現期博士學位論文摘要修正。
  20. This dual - loop strategy is analysed completly and simulated. the implementation strategy is using digital and analogous hybrid control. the voltage loop is realized by dsp, and the inner - loop is realized by analogous circuit the design of cpld which simplified signal - phase cascade inverter circuit is also introduced in this paper

    根據控制方案了採用數模混合方案的控制電路,電壓環採用dsp控制,實現輸出電壓有效值算、 pi調解、輸出限幅等操作,電流內環採用模擬電路實現,並基於復雜可編程邏輯器件cpld波移相電路和死區產生電路,簡化控制電路。
分享友人