隧道管 的英文怎麼說

中文拼音 [suìdàoguǎn]
隧道管 英文
tunnel box
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. Comparison of tunnel thread - drawing therapy and fistulectomy therapy for low - complex anal fistula

    式拖線法與瘺切除法治療低位復雜性肛瘺的療效比較
  2. Dry dock at shek o for casting for tunnel unit

    鑄造的石澳乾船塢
  3. Dry dock at shek o for casting of tunnel unit

    鑄造的石澳乾船塢
  4. Strip - shape underground structures such as the tunnels and tubes for various uses can be treated as a beam on elastic foundation under earthquake condition , although there exists soil - structure interaction , the foundation soil vibration is dominant in other words , analysis of earthquake response of the soil is essential to this end , simplified models , ( i. e equivalent mass system models based on some equivalence criteria ) are proposed , instead of a general 3 - d continuum model in this study , equivalence criteria are proposed and the simplified models are compared the single - mass - string model is proved to be valid and therefore applied to the analysis of earthquake response of the pearl river immersed tunnel

    條裝地下結構如、各種埋設等一般可看作彈性地基梁進行靜力及動力分析在地震條件下,結構與土相互作用,但土的振動成為主要因素為分析土的地震響應需把基土這一三維連續體作簡化處理,簡化成為等效多質點模型本文著重探討這種簡化模型的建立方法,推導等效方程,通過幾種簡化體系的分析比較,論證單質點串體系的合理性,並將其應用到廣州黃沙芳村珠江水下工程的地震響應分析,為抗震設計提供依據
  5. ( 3 ) pbs nanotubes, cac2o4 nanowires and caco3 nanometer whiskers were first synthesized in the bicontinuous microemulsion containing non - ionic surfactant op / n - pentanol / cyclohexane / aqueous solution. in those processes, the nanosized aqueous channels in the bicontinuous microemulsion were used as sofe templates

    ( 3 )採用op正戊醇環己烷水溶液所形成的雙連續微乳液中的「」作軟模板,合成出了pbs納米、 cac _ 2o _ 4納米線、 caco _ 3納米須等不同形貌的納米粒子。
  6. Positing of a precast tunnel unit

    放置預先鑄成的其中一段
  7. With the development of the technology to build tunnels with sunken tubes in china, more and more subaquatic tumiels are built with sunken tubes and construction of the tubes in dry - docks is one of the important factors for building subaquatic tunnels with sunken tubes

    摘要隨著我國沉法修建技術的發展,越來越多的水下採用沉法施工,而干塢是沉修建的重要因素之一。
  8. Both tsing kwai highway and west kowloon highway are essentially on viaducts, until the route finally enters hong kong s first dual 3 - lane immersed tube tunnel, the western harbour crossing, which measures 2 km from the portal on the west kowloon reclamation near yau ma tei to the exit and the end of the new airport access, at sai ying pun on hong kong island

    青葵公路和西九公路均主要為高架路,直至進入本港首條雙程三線沉西區海底。這條過海由位於西九填海區近油麻地的入口至設于港島西營盤新機場通終點的出口計,全長兩公里。
  9. After the briefly present the origin and features of internet protocol version 6 ( ipv6 ), the paper detailedly introduced the conception, characters, security technologies of vpn, and main tunnel protocols used to implement and deploy vpns. after analyzing and comparing these technologies of realizing vpns, we choosed ipsec. then, the paper analyzed in the ipsec structure, function, work mode, and its components such as authentication header ( ah ), encapsulating security payload ( esp ), internet key exchange ( ike ), encryption and authentication algorithms, security association, security policy, and how they cooperate with each other in order to secure ip packages

    在簡要介紹ipv6協議的由來和優點之後,詳細闡述了虛擬專用網的概念、特點、安全技術及實現的關鍵協議,通過對實現技術的分析比較,選用了安全性強大的ipsec技術,接著深入研究了ipv6安全協議ipsec的體系結構、操作模式,詳細論述了ipsec協議簇的各個組成部分,如認證報頭ah協議、封裝安全載荷esp協議、密鑰理ike協議、加密認證演算法、安全聯盟和安全策略等,以及這些組件之間如何協作,來共同實現對網路層ip數據包的安全保護。
  10. Remove breakdown vehicles obstacles from the tunnel tube

    移去隧道管內的壞車障礙物
  11. Remove breakdown vehicle obstacle from the tunnel tube, expressway and bridges

    移去隧道管快速公路及橋梁的壞車障礙物
  12. Application of high performace concrete in lining segment of shield driven tunnel

    高性能混凝土在盾構隧道管片中的應用
  13. Study on factors influential in metro shield tunnel segment joint bending stiffness

    地鐵盾構隧道管片接頭剛度影響因素研究
  14. The maintenance and management work is abundant and meticulous. it is very important to study the maintenance and management of the tunnel to maintain management system and perfect the administrative skill of tunnel and guarantee the railway unblockedly

    其維修養護理工作是龐大的、也是細致的,因此,研究其維修養護理問題,以完善秦嶺養護維修理體制和隧道管理技術,保證線路暢通是非常重要的。
  15. Through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel

    通過南水北調穿黃盾構模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、片與片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。
  16. Abstract : through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel

    文摘:通過南水北調穿黃盾構模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、片與片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。
  17. The road level of the cwb, as well as its eastbound slip road to the hong kong convention and exhibition centre extension, will need to be raised to - 7. 1 mpd to avoid clashing with the existing mtr cross harbour tunnel tsuen wan line with its roof at - 14. 6mpd

    -中環灣仔繞的路面高度,以及通往香港會議展覽中心的東行支路必須提高至主水平基準面以下7 . 1米,以避開現有地鐵過海荃灣線,該隧道管頂部位於主水平基準面以下14 . 6米
  18. For example, to prevent an accident, when your vehicles breaks down or are signalled to stop by a police officer or tunnel officer, by an emergency traffic sign, by a flashing red light signal or to pay a toll

    如非緊急如避免發生意外,或中途壞車,或遇上警務人員或隧道管理人員示意停車,或遇見緊急事故交通標志或閃動的紅燈信號,或繳付通行費,切勿停車
  19. The existing mtr cross - harbour tunnel tsuen wan line including the joints of the tunnel tube

    現有的地鐵過海荃灣線,包括隧道管的接駁位
  20. 5. the influence of the joint form was analyzed, and the damping effects of the elastic joint were studied. in the other hand, the structural maximum responses for the three earthquake input model were computed

    5分析了沉隧道管段連接方式對動力特性的影響,研究了段彈性連接減震效果;同時計算了南京長江沉三種地震動模型的響應最大一值。
分享友人