隧道貫通 的英文怎麼說

中文拼音 [suìdàoguàntōng]
隧道貫通 英文
tunnel holing-through
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞1 (穿; 貫通) pass through; pierce; thread 2 (連貫) be linked together; follow in a connt...
  • : 通量詞(用於動作)
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  • 貫通 : 1 (全部透徹地了解) have a thorough knowledge of; be well versed in 2 (連接; 溝通) link up; th...
  1. The straight transverse axis shall be parallel with the present crooked jianshe avenue ( qingnian road - hanxi section ), connect to nanniwan avenue in the west and form the along - river traffic system parallel to yangtze river and hanjiang river ; the road shall pass through the core of wangjiadun cbd, connect with entry and exit of subway station, underground parking lot and basements of high - rise buildings, to form the comprehensive underground space ; the road section close to hanxi shall be connected to the tunnel of nanniwan avenue via through cut, therefore integrating the western residential zone in space

    橫軸對建設大(青年路-漢西段)裁彎取直,西與南泥灣大相接,形成與長江、漢水平行的順江交系統;該穿王家墩商務核心區,與地鐵出入站、地下停車庫以及高層建築地下層相銜接,形成綜合地下空間;靠近漢西路段以路塹形式與南泥灣大相接,在空間上使西部居住區形成整體。
  2. Quantum-mechanical tunneling across the very small gaps occurs during the initial stages of separation.

    最初分離階段,電子借量子力學的穿機理,過微小的間隙而轉移。
  3. Study of helmert variance component estimation in tunnel run - through control traverse difference

    方差分量估計在隧道貫通中控制導線平差的研究
  4. The 1. 9 - kilometre aberdeen tunnel, opened in 1982, links the northern and southern parts of hong kong island

    香港仔隧道貫通港島南北,在一九八二年車,全長1
  5. A 7 km long dual 2 - lane carriageway, which is forming part of route 9, linking sha tin directly with tsuen wan via the shing mun tunnel

    一條長七公里經城門隧道貫通沙田與荃灣的雙程雙線行車,並為九號干線組成部分。
  6. By analyzing the limits of the breakthrough error in tunnel boring survey, the requirement data of the measurement error in different construction stages are obtained, and the precision, methods and schemes of the surveying are determined to ensure the tunnel breakthrough successfully

    摘要誤差的限值分析得到不同施工階段的測量限差要求,確定測量精度、方法,制定測量方案,確保盾構隧道貫通
  7. Breakthrough clearance survey of metro tunnels transferred from existing air - raid tunnels

    利用既有修建地鐵的性限界測量及分析
  8. As soon as the tunnel boring machine advances 1m forward, 6 pieces of pre - cast concrete segment are fabricated and forming a ring with internal diameter of 5. 6m to support soil outside, while simultaneous back - filling and 32 - hole chemical grouting injector equipment installed with tunnel boring machine consolidating soil instantaneously to enhance the soil strength. the tunnel boring machine is also equipped with guided top gyroscope and true circularity retaining device for construction accuracy

    其中值得一提者,板橋土城線所採用之潛盾機系新型之土壓平衡式機種,具同步背填灌漿之功能,對地表沉陷之控製成效優良,目前已過民房及商業區下方之下行其初期沉陷均控制在5mm之內,二次沉陷及最終沉陷平均總量最大亦僅18mm ,遠優于初始設計的警戒值30mm 。
  9. Light at the end of the nam wan tunnel could finally be seen after excavation for the tunnel breakthrough today february 25, when a tunnel breakthrough ceremony jointly officiated by the permanent secretary for works, mr lo yiu - ching ; and the director of highways, mr mak chai - kwong was held to commemorate the milestone achieved by the route 8 project

    環境運輸及工務局常任秘書長工務盧耀楨路政署署長麥光今日二月二十五日主持典禮,標志八號干線工程項目一個重要的里程碑,進一步邁向完成該項一百五十億元的主要工程。
  10. They are digging a tunnel through the hill

    他們正在挖一條這座山的
分享友人