露天礦山 的英文怎麼說

中文拼音 [lòutiānkuàngshān]
露天礦山 英文
surface mine
  • : 露動詞[口語] (顯露; 表現) reveal; show
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : 名詞1 (地面形成的高聳的部分) hill; mountain 2 (形狀像山的東西) anything resembling a mountain...
  • 露天 : in the open; open-air; outdoors
  • 礦山 : mine; hacienda; diggings; bal; groove礦山安全 mine safety; 礦山測量 [采礦工程] mining survey; lat...
  1. Abstract : considering the stochastic characteristic of main hydrogeologic parameters in yuanbaoshan open coal pit, a groundwater stochastic management model for optimal drainage borehole design is established. the result of the modeling shows the effect of stochastic characteristics of hydrogeologic parameters on the result of management modeling. it was found that the higher the parameters uncertainty and the management reliability level, the worse the management result

    文摘:從影響元寶地下水疏乾的主要水文地質參數隨機性特徵分析入手,建立並求解了元寶疏干工程優化設計的隨機地下水管理模型,揭示了水文地質參數隨機性對管理模型結果的影響,認為參數的隨機性越大,管理結果越壞;置信水平越高,管理結果越壞,且滲透系數和邊界條件對管理結果影響最大。
  2. Safety regulations for metal and nonmetal opencast mines

    金屬非金屬露天礦山安全規程
  3. Vulcan software system and its application in yuanbaoshan open cast

    軟體系統及其在元寶的應用
  4. Finally, jinduicheng mo. company open - pit is quoted as an instance for building mine transportation vechile scheduling system model, and according to the model, adopt genetic algorithm to study the optimization of mine transportation vechile scheduling system. a rational project is given to this problem, the paper also analysized the optimial design of mine transortation vechile scheduling, the model offering in this paper, convergence of optimal algorithm and data bank management, and transportation project of minerals and disposals is optimized, which realize the decision of transportation project and data visibilization, and wich improves the science and information process of transportation department management

    最後,論文以金堆城鉬業公司為例建立運輸車輛優化調度模型,結合所建立的車輛優化調度模型,採用遺傳演算法對運輸車輛系統進行優化研究,為其提供合理的體系方案。並對車輛優化調度系統設計進行了詳細分析,提出的車輛優化調度系統,集優化演算法與數據庫管理分析於一體,進行巖運輸方案的優化,實現調度方案決策的可視化、運行數據的可視化,促進運輸部門管理的科學化、信息化進程。
  5. Geology disaster of the open - air governs the plan research

    露天礦山地質災害治理方案
  6. Applied research of digital mine in surface mine

    數字的應用研究
  7. One of the existing problems of the mine at present is : when the south open stope is over in 2005, where does the open north stope start for the sake of optimizing economic benefit and social benefit and environmental benefit of the mine facing to this problem, based on the large number real data of mine, in view of fuzzy attribute and complexity attribute existing in mine production, this paper applies fuzzy multi - attributes decision method to a lot of feasible technology, economy rational for schemes to appraise to proposes

    當前生產存在的問題之一是:南采場將於2005年開采結束,何處啟動北采場,才能使得經濟效益、社會效益、環境效益保持最優化?針對銅綠銅鐵何處啟動最優這一問題,本文在收集大量銅生產實際資料基礎上,針對生產中存在的模糊性和復雜性,提出運用模糊多屬性決策方法對多個技術可行、經濟合理方案進行評價。
  8. In the special fields locking valves, underground mining, water hydraulic systems or beyond that with mining machines, hydraulics, selector valves as well as with aggregates, open cast pit, strip mining, surface mining and / or with hydro and hydraulically is saartech hydraulik gmbh well - known

    Saartech hydraulik gmbh是一家現代化的、可靠的專門產品供應商,這家供應商從事成套設備、機組,機械,液壓系統,液壓,液壓動力源,液壓缸,醫藥技術,地下,地下開采,整流器、整流管、閥、閥門,截止閥、關閉閥,,水壓學、水壓技術、水壓系統,方向閥,換向閥,液壓的的製造、銷售。
  9. The automatic metering system for 33 - 07 trucks can accurately make automatic metering and recording of mine - used truck hauling data such as run number, load, time etc. under various complicate and deteriorative operational environment conditions so as to realize the automation and computerization of the metering of mine - used truck hauling and meet the requirements of the truck hauling management in open - pit mine operation. as a result, it is of high popularization value

    07汽車自動計量系統能夠在用載重汽車各種復雜、惡劣的作業環境條件下對汽車運輸作業的車次、載重量、時間等數據進行準確自動計量和記錄,實現了用載重汽車運輸作業計量的自動化和計算機化,滿足了露天礦山生產汽車運輸管理工作的需要,具有較高的推廣應用價值。
  10. Abstract : in this paper, the characteristics of production system have been analyzed and the production economic functions have been set up in mine. the matrix of two - dimension alternately action is analyzed for mining process and factor in open - pit mine. it is made algorithm for matrix of two - dimension alternately action. under the conditions of binding, mine system is optimum running by optimal program, optimal coordination and optimal control

    文摘:分析了生產系統的特點,建立了生產經濟函數,對生產工藝、生產因素進行了二元交互作用矩陣分析,提出了求解二元交互作用矩陣的演算法,通過最優計劃、最優協調、最優控制使生產系統在一定約束條件下最佳運轉。
  11. Mine plans - open cast mining - part 2 : reconstruction

    平面圖.露天礦山.第2部分:重建
  12. Mine plans - opencast mining - part 1 : general requirements

    平面圖.露天礦山.第1部分:一般要求
  13. Besides the above - mentioned, we also produce and deal with open - pit mine exploitation equipments, milling equipments, mining equipments consumables

    除了以上五大類產品,我司還生產和經營露天礦山開采設備;選設備;易耗件等
  14. New advance in the equipment and mining technology for large metallurgical open - pit mines

    大型冶金露天礦山設備及采技術的新進展
  15. Erection of electrical installation in open - cast mines, quarries and similar works

    露天礦山採石場和類似工作區區域的電氣設備的安裝
  16. The influence factors for blasting technical controlled by tiny differences in the open air quarry

    露天礦山微差控制爆破技術的影響因素
  17. Most of large and middle scale open - pit mines in china have reached deep mining

    摘要我國的大多數大中型露天礦山已經或即將進入深部開采。
  18. Influence of two points forward intersection method in surface mine acceptance measurement accuracy

    兩點前方交會法對露天礦山驗收測量精度的影響
  19. Real time optimization research and application of mining scheduling system based on genetic algorithms and adaptive network fuzzy inference system

    露天礦山開采調度系統的實時優化與實踐
  20. Zijin operates six gold mines, including the largest open pit in china, and, in 2004 it produced 13 tonnes of gold, according to a company brochure

    紫金經營著六處生產,包括中國最大的露天礦山,根據公司自己的介紹, 2004年產金13噸。
分享友人