馬鞍山路 的英文怎麼說

中文拼音 [ānshān]
馬鞍山路 英文
ma on shan road
  • : Ⅰ名詞1 [動物學] (哺乳動物) horse 2 (象棋棋子) horse one of the pieces in chinese chess3 (姓...
  • : 名詞(放在牲口背上馱運東西或供人騎坐的器具) saddle; sella
  • : 名詞1 (地面形成的高聳的部分) hill; mountain 2 (形狀像山的東西) anything resembling a mountain...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 馬鞍 : bridge piece; saddle; [美國] mc clellan saddle
  1. With the quick development of expressway in the soft soil area, the settlement and deformation of sub - grade of expressway has become a very outstanding question. this paper establishes the corresponding formulas of sub - grade 3 - d ( three - dimension ) settlement on inartificial foundation, bagged sand - drains foundation and semi - rigidity piles foundation, and the calculation results from the formulas is compared with the observation results of settlement. it proves that the methods adopted by the paper are feasible

    本文擬根據?蕪湖高速公軟土基的沉降變形及其處理方法,對軟土基的三維沉降計算和用袋裝砂井處理與粉噴樁半剛性樁處理時的沉降計算方法作一定的探討,同時與幾個段的實際觀測資料分析比較,認為本文的沉降計算方法總體上是可行的。
  2. Work on the last section of the primary road link to ma on shan town centre is scheduled for completion in 2000

    市中心主要連接最後一段工程,定於二零零零年完成。
  3. Work on the primary road link to ma on shan town centre is scheduled for completion in 2002. five public housing estateshome ownership scheme projects are under construction

    市中心主要連接工程定於二零零二年完成。五個公共屋?居屋屋苑的工程項目正在施工。
  4. Level 2, ma on shan plaza, no. 608 sai sha

    新界西沙608號廣場二樓
  5. Extension of mtr tko line from po lam to hkust and further up to sai kung to link up with the mos rail

    把地鐵將軍澳線由寶琳延至科大,繼而再延至西貢,接駁
  6. The civil engineering and development department ( cedd ) had completed the construction of road t7 in ma on shan to provide a bypass for traffic along the new town

    土木工程拓展署已完成t7號道建造工程,為需途經新市鎮的駕駛人士提供一條新的繞道。
  7. The tolo highway between island house interchange and ma liu shui interchange is being widened to dual four - lane carriageway standard, with the works due to be completed in mid - 2003. in ma on shan, to cope with future growth in traffic demand, the sai sha road section between kam ying road and the junction with trunk road t7 at sha on street is being widened to dual two - lane standard ; work started in august 2002 for completion in 2005

    為配合日後交通量的增長,介乎錦英與日後的t7號主幹道交界處的一段西沙,已在二零零二年八月展開擴闊工程,改為雙程雙線行車道,預期工程可在二零零五年竣工。
  8. Get off at the roundabout of hang on estate and take a 45 minutes walk to reach the entrance, which inside ma on shan barbecue site

    乘車至恆安或耀安,沿迴旋處旁之良友上斜,步行約四十五分鐘便到達燒烤場旁及樹木研習徑入口。
  9. Speed limit on ma on shan road, ma on shan by - pass road t7 sai sha road

    馬鞍山路繞道t7及西沙車速限制
  10. A new pedestrian subway connects the station concourse with the residential areas on both sides of ma on shan road

    新行人隧道把馬鞍山路兩旁的屋苑和車站大堂連接起來。
  11. Hang hong street between hang kam street ma on shan road roundabout

    介乎恆錦街與馬鞍山路迴旋處的一段恆康街
  12. Speed limit on ma on shan road,

    馬鞍山路繞道
  13. 15th floor, ma on shan police station, no. 200, ma on shan road, ma on shan, shatin, n. t

    新界沙田馬鞍山路200號警署15樓
  14. Section of ma on shan by - pass road t7 eastbound from its junction with ma on shan road eastbound to its junction with sai sha road eastbound ; and

    東行由其與馬鞍山路交界處起,至其與西沙東行交界處止的段及
  15. Shortly before 7. 30 am, a motorcycle travelling along ma on shan road towards kowloon reportedly stopped outside kam tai court due to a failure of the engine. a private car from behind, failing to stop in time, rammed into the motorcycle before ramming into a bus travelling in the same direction

    今晨約七時三十分,一輛電單車沿馬鞍山路往九龍方向行駛,駛至錦泰苑對開時,由於引擎故障而停下,尾隨的一輛私家車收掣不及,先撞向電單車,然後再撞向沿相同方向行駛的一輛巴士。
  16. Kunshan, maanshan road - development project analysis kunshan, maanshan road - phase 1 overview

    馬鞍山路地塊一期開發-預可行性分析
  17. No. 2 - 1, ma an hill road, jinan, shandong jinan

    東省濟南馬鞍山路2 - 1號濟南
  18. Real estate investment opportunity in suburban shanghai kunshan

    關于馬鞍山路地塊開發的說明
  19. No. 36 datong road qufu. shandong

    東省濟南馬鞍山路2 - 1號
  20. No. 66 jingyi road jinan

    東省濟南馬鞍山路2 - 1號
分享友人