高架橋系統 的英文怎麼說

中文拼音 [gāojiàqiáotǒng]
高架橋系統 英文
viaduct system
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 高架橋 : elevated bridge
  • 高架 : elevated; overhead
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. A footbridge at the south side of the station crosses chap wai kon street and connects to an elevated walkway system leading to prima villa and yu tsui court

    車站南面興建的一條行人天,橫越插桅桿街,連接欣廷軒及愉翠苑的行人
  2. Chemistry provides the bridge between the molecules of inanimate matter and the highly complex molecular architectures and systems which make up living organisms

    化學便在非生命物質的分子和組成活體組織的度復雜的分子結構起一座梁。
  3. A new footbridge will be built at the southern side of the station, linking it with the elevated walkway system leading to prima villa and yu tsui court

    車站南面將興建一條行人天,橫越插桅桿街,連接欣廷軒及愉翠苑的行人
  4. Wan zhou yangtze river bridge is the establishing large span steel truss bridge now, and the property of it is the lower stiffness of the main girder. when the speed is high, the analyses and the vibration control of vehicles and bridge are very important, especially the dynamic lateral response of the system

    萬州長江大是目前在建的大跨度鋼桁,其特點是主梁結構剛度較小,在速行車速度下,對起車耦合振動分析及其控制尤其是車橫向動力響應研究則尤為重要。
  5. By the experimental formulation, the one - dimension model is put up. the result is compared with the two - dimension modulus, satisfied results has got

    利用傳的經驗公式,建立了的一次梁模型,計算結果與二次梁模型進行對比,在速度較低情況下,吻合效果良好。
  6. For the track - viaduct - ground system, we use double - beam model to calculate its dynamic response under moving load, and analyze the transmission of the vibration in the system

    對于軌道一一地基,本文採用二次梁計算模型來計算它在移動荷載作用下的動力響應,分析了振動在中的產生與傳播過程。
  7. The effect of viaduct system on near environment is generated through the column of viaduct, so the characteristics of loads are that the action points do not change but the values change with time

    高架橋系統對周圍環境的影響是通過的柱子而產生的,其特徵是荷載位置不變,但大小隨時間變化。
  8. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為空作業,給模板工程及預應力張拉帶來一定困難;支撐連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的設影響大;懸吊結構未完體設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人