actual start 中文意思是什麼

actual start 解釋
實際開始
  • actual : adj 現實的,實際的,真實的,現行的,現在的。 in actual existence 現存。 in actual life 在現實生活...
  • start : vi 1 〈美國〉出發,動身,起程。2 (機器)開動;開始,著手,下手,發生。3 突然出現,湧出;鼓出,突...
  1. It adopts computer digital controlled system plc orientation mo dule touch scerrn to control, realizing x z w axis direction s precise orientation by ac servo system. in actual operation, just put the glass on the transmission belt, input drilling position data on the screen, press the start button, the machine will automatically position itself and finish all drilling operations, and automatically stop when the works is completed. this machine s two group drilling heads can work at the same time, one group drilling head is also ok. this machine has high drilling efficiency and accurate position, is an ideal choiceness equiment of scree - wall glass and other large specand volume production glass drilling

    該機採用計算機數控系統plc定位模塊觸摸顯示屏控制,由交流伺服系統實現x z w軸三個方向的精確定位。操作時只需將玻璃放在傳送帶上,在顯示屏上輸入鉆孔位置,按啟動按鈕,自動定位鉆削所有孔位,完成工作后自動停機。本機兩組鉆孔機頭可以同時工作,也可以單組機頭工作。
  2. 448 the systematic hydrostatic test ( dry run, hot test, dynamic test, actual start - up ) is scheduled for next monday

    系統水壓試驗(學習、加熱試驗、動力試驗、實際開車)定於下星期一進行。
  3. The moea is also looking into ways of integrating the specialties and resource edges of incubation centers run by universities, legal entities, the government and private institutions, which, when accomplished, will provide smes with a complete array of incubation services that will help them shift from creativity and innovation to actual start up

    因此經濟部鼓勵民間資源投入育成產業,並研擬整合大學型法人型政府型及民間型育成中心的專長特性與資源優勢,提供中小企業從創意創新到創業的過程中完整的育成服務。
  4. As you track progress by entering actual start and finish dates for tasks, you may find that the project finish date remains the same, even when a number of tasks have been completed later or have taken longer than originally planned

    通過輸入任務的實際開始日期和完成日期來跟蹤任務時,可能會發現雖然有一些任務延期完成或者比原規劃的時間要長,但項目的完成日期保持不變。
  5. For example, type the actual start date in the start field and the remaining work in the remaining work field

    譬如在「開始時間」域中鍵入實際開始日期,在「剩餘工時」域中鍵入剩餘工時。
  6. Enter actual start and finish dates for a task

    輸入任務的實際開始日期和完成日期
  7. To enter actual start and finish dates for a task

    如果要輸入任務的實際開始日期和完成日期:
  8. From 0610 please refer to the entry form for actual start time

    由早上6時10分開始請留意報名表開賽時間
  9. As actual start date

    實際開始日期
  10. Actual start date

    實際開始日期
  11. To enter actual start and finish dates for several on - time tasks at once

    如果要一次為多個按時完成的任務輸入實際開始日期和完成日期:
  12. Displays all tasks that do not have the as soon as possible constraint or that have an actual start date

    顯示沒有「越早越好」限制或者具有實際開始日期的任務。
  13. If you ' re going to track progress at all, you should certainly begin by tracking the actual start and finish dates of each task

    如果要跟蹤進度的全過程,則應從跟蹤每個任務的實際開始日期和完成日期開始。
  14. List of tasks showing actual start and finish dates, the percentage of each task completed, and actual and remaining task durations

    任務列表,顯示實際的開始日期、完成日期、每個任務的已完成百分比、實際任務工時和剩餘任務工時
  15. By comparing actual start and finish dates with baseline start and finish dates, you can predict whether your project will finish on time.

    將實際開始日期和完成日期與比較基準開始日期和完成日期相比較,就可以預測項目是否能按時完成。
  16. At least, actual start date, actual finish date, percentage of completion, remaining duration, more than these 4 are required if necessary

    至少,實際起動日期,實際完成日期,完成百分比,剩餘工期。如必需,更多輸入。
  17. For example, the actual start date for a task is the day on which the task actually started, and its actual cost is the amount spent up to the present

    譬如,任務的實際開始日期就是任務確實開始的日期,其實際成本就是到目前為止的總費用。
  18. You may want to create a leading split to see the original task start date, indicated by the left edge of the gap, and the actual start date, indicated by the left edge of the task bar

    您也許希望創建一個前置拆分查看任務初始的開始日期和實際開始日期。
  19. Displays actual information, including actual start date, actual finish date, percent complete, actual duration, remaining duration, actual cost, and actual work

    顯示實際信息,包括實際開始日期、實際完成日期、完成百分比、實際工期、剩餘工期、實際成本和實際工時。
  20. When you enter the actual duration of a task, microsoft project updates the actual start date, the percentage of the task that is complete, and the duration of the task remaining in the schedule

    輸入任務的實際工期時, microsoftproject將更新實際開始日期、任務的已完成百分比以及日程中任務的剩餘工期。