cooling roller 中文意思是什麼

cooling roller 解釋
冷卻輥
  • cooling : n. ,adj. 冷卻(的)。
  • roller : n 1 使滾轉的人;滾轉物;滾筒;【印刷】墨輥,印色輥;(地圖等的)軸,卷軸;輥子,轉子,滾軸,滾子...
  1. Final cooling section is at the end of the roller kiln, cooling tiles by axile fans suck a great of environment air and blow air onto the tiles directly, cooling tiles fast

    終冷段設在窯尾,它通過軸流風機,從伸入窯內的圓鋼管打入大量的冷空氣,達到快冷卻製品目的。
  2. Cooling roller bed

    冷卻輥道
  3. Each printing couple is equipped with cooling roller to ensure quality of high speed printing

    每個印刷組配備冷卻輥裝置,保證了高速印刷質量。
  4. Tow cycle cooling system, fitting intelligent controlling temperature set to control the grain roller temperature, causing the sheet smoothing and the thickness homogenizing. cutting machine uses the computer and hydraulic controlling to realize the cutting sheet that we want length and quantity, the automatic amounting meter set can control the weight of production

    智能溫控儀控制壓花輥溫度,使板片平整而厚薄均勻切片機採用微電腦液壓控制,實現切片定長定量,精確控制計量,自動計米器的採用使得產品重量亦可以設定。
  5. Features : hardened and precision - ground bedways, the spindle is supported with precision taper roller bearings, gears in the headstock are made of high - quality steel, hardened and ground, speed - changing levers driven by fan - shaped gears, operating easily, safe interlock and a overload safety devices in apron, electromagnetic braking, cooling and lighting devices are supplied

    特點:床身導軌表面經淬火和精密磨削,主軸支撐採用精密圓錐滾子軸承,主軸箱內齒輪採用優質鋼並經表面淬火和磨削,變速機構採用扇型齒輪傳動,操作靈活方便,溜板箱設有安全互鎖裝置和過載保險機構,配有電磁剎車、冷卻及照明裝置。
  6. Based on several actual cases, the temperature control measures for roller compacted concrete ( rcc ) gravity dam and arch dam such as structural jointing for construction ; lowering of concrete placing temperature ; water pipe cooling ; surface insulation ; inclined - layer placing etc., the measures to improve the material properties i. e. the application of micro - expanding concrete ; enhancement of material crack - resistance property and the requirement for the simulative analysis on both the temperature field and stress field as well as some problems concerned are summarized herein on the basis of the analysis on the material properties ; construction characteristics and the changing characteristics of the thermal stress of roller compacted concrete

    摘要從碾壓混凝土的材料特性、施工特點、溫度場溫度應力的變化特點入手,結合幾個工程總結了碾壓混凝土重力壩、拱壩的分縫方式,降低澆築溫度、水管冷卻、表面保溫、施斜層碾壓等溫控措施,採用微膨脹混凝土、提高材料抗裂性能等改善材料性能措施及碾壓混凝土溫度場、應力場模擬分析的要求和應注意的問題。
  7. There are five parameters need to be measured. there are five channels for input : the displacement of casting - roller, the rotate speed of casting - roller, the pressure of casting and rolling, the casting temperature and the water - speed of cooling water. they are measured by raster, photoelectric coder, strain pressure sensor, thermocouple and turboflowmeter

    系統需要進行監測的參數有五個,即有五路輸入信號:鑄輥位移、鑄輥轉速、鑄軋壓力、澆鑄溫度、冷卻水流速,分別採用光柵、光電編碼器、應變式壓力傳感器、熱電偶和渦輪流量計作為檢測元件。
  8. The 3 - d simulative calculation program concerning temperature field and creep stress field applying pipe cooling is conducted by adopting more advanced simulation technique. thereby an effective method is suggested for computing the temperature field and stress field of mass concrete. that method can simulate precisely for rcc ( roller compacted concrete ) dam which constructed layered

    採用了較為先進的模擬技術,編制了可以考慮水管冷卻的混凝土結構溫度場及徐變應力場三維模擬計算程序,實現了完整模擬碾壓混凝土壩分層施工的實際過程的溫度及應力的模擬計算。
  9. For examples, the process parameters automatically inspect and control system for speed of equipment, tension before and behind the main machine, temperature of drying / cooling, roller, length and width of tire cord fabrics are backward in technique

    另外,被加工膠片厚度的控制精度,還隨被加工膠料的溫度、速度、材料的種類等因素的變化而變化。問題的難度比較大。