element interval 中文意思是什麼

element interval 解釋
組內距
  • element : n 1 要素;成分;(構成)部分;分子。2 【化學】元素;【數學】元,素;【機械工程】單元;單體;【無...
  • interval : n 1 (空間方面的)間隔;空隙。2 (時間方面的)間隔,間歇;工間休息,幕間休息。3 【軍事】(各小隊...
  1. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱壩施工期和運行期溫度場、徐變應力場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工間隙時間、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。
  2. 3. as there are up to 106 managed objects on element level of tmn ( telecommunications management network ) in telecommunications network, and the scheme to collect management information affects the performance of network management, a new algorithm - saa ( self - adaptive algorithm ) used for retrieving multi objects information has been put forward in this thesis. saa can adjust the retrieving objects and interval of retrieval self - adaptively by using the schemes of self - adaptivity, fault tolerance, recognition status of object dynamically etc., and thus can use fewer network resources without alteration of snmp ( simple network management protocol ), iiop ( internet inter - operability protocol ) or cmip ( common management information protocol )

    針對傳統的定時提取網路管理信息方法的不足,提出了一種提取多管理對象信息的新演算法? ?自適應演算法saa ( self - adaptivealgorithm ) ,該演算法能在不改變管理協議,如iiop ( internetinter - operabilityprotocol ) 、 snmp或cmip ( commonmanagementinformationprotocol ,公共管理信息協議)的情況下,採用自適應策略、容錯策略、動態識別被管對象狀態策略、被管對象存儲空間的動態刷新策略,根據本次訪問被管國防科學技術大學研究生院學位論文對象所得出的網路通信量,自適應地調整下次應該訪問的被管對象和讀取被管劉?象數據的時間間隔,從而可以較少地消耗所用的網路帶寬和cpu資源。
  3. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水閘)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  4. By representing the uncertain parameters as interval numbers, the governed equa tio ns of the structural system are obtained by means of the finite element method

    將結構系統中的不確定性參數用區間數來表示,用有限元法建立系統的控制方程。
  5. Analysis of the interval between double - row piles by finite element method

    雙排樁支護排距的有限元分析與研究
  6. A wavelet - based flat shell element using b - spline wavelet on the interval and its application

    樣條小波平板殼單元及應用
  7. In this article, according to heat conduction theory and finite element theory, the temperature field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, thermal insulation change, surrounding temperature change and water storage on temperature field in the arch dam are also considered

    論文根據熱傳導理論及有限元理論,用三維有限元浮動網格法對施工期和運行期溫度場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工間隙時間、絕熱溫升過程及壩體材料分區、水庫分期蓄水和環境溫度變化等因素對壩體溫度場的影響。
  8. Based on the formal measurement table applying the 2 ( superscript nd ) pre - test on 351 students and conducting the examination of the credibility and validity to construct the credibility and validity of the measurement table, the coefficient of inner consistency of individual element in this table was. 673 ~. 892, and the coefficient of re - test after the interval of two weeks was. 697 ~. 930, with the performance of physical education learning to prove the discriminate validity and criterion - related validity, and with the element analysis to examine the construction validity, the sum of variable amount which could be interpreted was 59. 06 %, the outcome showed this table was having good credibility and validity that could provide physical education teachers to realize the learning strategies of university students

    以正式量表對351位學生進行第二次預試,再進行信度與效度的考驗,以建構量表的信效度,本量表各因素的內部一致性系數為. 673 ~ . 892與隔二周的重測信度為. 697 . 930 ,以體育學習表現來驗證辨別效度及效標關聯效度,以因素分析考驗建構效度,所能解釋總變異量為59 . 06 % ,結果顯示本量表具有良好的信效度,確實可以提供國內體育教師了解大學生的體育學習策略。
  9. It applies an interval method to select element in the evolutionary structure optimization method ( eso ), and recovers or deletes element by the “ birth and dead ” function of element. another method viewed as second order smoothing technique for suppressing the checkerboard patterns has been proposed based on the filtering function ’ s principle. then the above methods are applied to solve a temperature - controlling problem in the steady heat conducting field and a multi - objective topology optimization problem considering multiple load cases and coupled effect

    本文基於ansysparametricdesignlanguage ( apdl ) ,提出漸進結構法中應用區間法進行單元的篩選,通過單元「生死」的功能實現單元的恢復與刪除,根據濾波函數法原理提出修改的二階棋盤格處理方法,並就穩態熱傳導溫度控制問題,考慮熱、力耦合的多載荷工況的多目標拓撲優化設計問題進行求解。
  10. Interval arithmetic and static interval finite element method

    區間運算和靜力區間有限元
  11. Combining the interval arithmetic with the traditional finite element method ( fem ), the static governing equations of interval finite element method can be set up to get the interval static response of structure directly

    將區間分析和適當的有限元方法相結合,可建立直接求解靜力響應區間的區間有限元控制方程。
  12. Element to increase minimum time interval between two events

    屬性,以增加兩個事件之間的最小時間間隔。
  13. However, the application of finite element in analysis and computation of uncertain structure is to be limited because there has n ' t a satisfying solving method to fuzzy equations and interval equations

    而由於模糊方程組和區間方程組尚沒有一個令人滿意的求解方法,制約了有限元法在具有模糊參數結構的分析計算中的應用。
  14. Then, based on defining opposite deviation between each element of each s interval numbers decision matrix and corresponding elements of expert ' s interval numbers decision matrix, an analytic method to each s assessment level is given

    通過定義專家給出的決策矩陣中各個元素與綜合評價矩陣中對應元素之間的相對偏差,給出了基於區間數決策矩陣形式偏好信息的專家評判水平的分析方法。
分享友人