flood control channel 中文意思是什麼

flood control channel 解釋
調洪河槽
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  • channel : n 1 水路,水道,渠,溝;海峽;河床,河底。2 (柱等的)槽,凹縫;【機械工程】槽鐵,凹形鐵。3 〈比...
  1. For the low water head water control project at a branching channel, its flood discharge capacity is related not only with the total discharge width but also with the discharge width ratio of the two branches

    摘要位於分汊河段的低水頭樞紐,其泄洪能力不僅與樞紐的總泄流寬度有關,而且與兩汊泄流寬度之比有關。
  2. Hydrology regime and river channel evolution become complex because of double influences of river flow and tide. there is little appropriate method so far. therefore, when the impact us assessed of water project on flood control, the following aspects should be focused on, river evolution and stability of project - sections, design tidal level, flood - tide combination scheme, pre - project and post - project impacts on river channel, water level and flow condition

    長江河口段為潮流河段,徑流潮流的雙重作用使得區域水文情勢、河道演變規律錯綜復雜,開展防洪影響評價研究時,河道演變及工程段穩定性分析,設計潮位的分析計算,洪潮組合方案擬定,工程前後對河道及水位流態影響的模擬等均是目前尚無十分成熟的方法,需要進一步研究的課題。
  3. River channel evolution and flood control evaluation of juankou wharf works at wuhan city

    武漢沌口碼頭工程河段河床演變及防洪評價
  4. In the early periods, the objective of the river management is to constraint the braid river in a main channel by using construction of dikes. by control the flood could prevent from river banks flowing away

    早期河川治理,以築堤御洪為主,其主要目標在於整理網狀亂流,束范于河槽中,防止沿岸土地浸淹崩坍及流失,達到防災減災的目的。
  5. Since boundary of the lower yellow river bed varies with the flow conditions, main channel of the stream continually shrank and flood control becomes rather difficult

    隨著黃河下游水沙條件的不斷變化,河道的邊界條件也隨之發生變化,主槽嚴重萎縮,泄洪能力日臻下降,防洪問題日益突出。
  6. The dredger is one of major facilities in the fields of channel dredge, hydro project, prevent or control flood, ocean development, seaport construction etc. at present, the management maintenance methods of dredger are primary time based maintenance and run - to - breakdown maintenance

    挖泥船是航道疏浚與整治、水利工程、防洪搶險、海洋開發及海港建設的主要工具。目前對挖泥船管理維修的方法主要有定期維修和事後維修。
  7. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修建閘壩、橋梁、碼頭和其他攔河、跨河、臨河建築物,鋪設跨河管道、電纜,必須符合國家規定的防洪標準、通航標準和其他有關的技術要求。
  8. A research on decision support system for basin flood control scheduling is presented by a case study of complicated flood control system of downstream basin of the yellow river including reservoir, river channel, flood diversion area and flood detention area in this paper

    流域防洪系統聯合調度是提高流域防洪工程體系防洪能力的重要非工程措施,本文以黃河下游包含水庫、河道與分滯洪區的復雜防洪系統為實例進行了流域防洪調度決策支持系統的研究。
  9. Study on the effects of wide river section and stabilized main channel on flood control of the yellow river

    略論黃河的寬河定槽防洪治河策略
  10. Abstract : based on the results of hydraulic model test and remote - control ship model, the unsteady flow characteristics in the downstream approach channel and the reaches from three gorges project to gezhouba project and navigation conditions in these reaches during the tgp flood - discharge are analyzed. the measures of raising navigation discharge level and improving navigation conditions are given

    文摘:根據水工模型試驗成果,分析了三峽工程泄洪時壩下游引航道和兩壩間河段(三峽至葛洲壩)的非恆定波流運動特性,結合遙控自航船模試驗對兩壩間的通航水流條件進行了分析評價,並提出了提高通航流量標準、改善通航條件的相應措施。
  11. According to the initial conditions, the river level and flow condition have been simulated by two - dimensional mathematic model on the basis of measured data. in addition, with analysis of river channel evolution, the evaluation of the impact on flood control is ultimately made for the reference of policy - making

    根據邊界條件,結合實測地形及全潮觀測資料,通過二維數學模型,模擬工程前後河段水位、流態,結合河道演變分析成果,綜合作出防洪影響評價,為決策部門提供參考性的依據。
分享友人