load and discharge 中文意思是什麼

load and discharge 解釋
裝卸
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • and : n. 1. 附加條件。2. 〈常 pl. 〉附加細節。
  • discharge : vt 1 發射(炮等),打(槍),射(箭)。2 起,卸(貨)。3 排泄,排出,放出(水等)。4 釋放;解除,...
  1. A river quality management model is proposed for the optimal waste load allocation in a tidal river basin, taking into account the impacts of stochastic pollutant discharge and dynamic hydrological conditions on water quality during a tidal cycle

    摘要考慮污染源強隨機變化和感潮河流潮周期內動態水文條件對水質的影響,建立了優化污染負荷分配的流域水質管理模型。
  2. According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river

    根據小浪底下游各站沙峰均滯後於洪峰的35場洪水,對沙峰滯後於洪峰的特性進行了剖析,建立了小浪底、花園口、夾河灘、高村、孫口、艾山、利津各河段沙峰滯后時間與上站洪峰流量、沙峰含沙量、洪水傳播速度、懸移質泥沙群體沉速之間的回歸方程,可以用來查補延長沙峰滯后時間,為下游各站沙峰傳播時間的準確預報提供依據。
  3. The researches including discharge capacity, pressare properties, cavitation characteristics at some key positions, hoisting load of the gate, configuration of energy dissipator at the exit dentated - sill, and downstream scouring were performed by hydraulic model tests

    藉助系列水工模型試驗對水布埡放空洞的泄流能力、壓力特性及關鍵部位的空化特性、閘門啟閉力、出口鼻坎消能工體型及下游沖刷等進行了較深入的研究、分析。
  4. Article 48 the carrier shall properly and carefully load, handle, stow, carry, keep, care for and discharge the goods carried

    第四十八條承運人應當妥善地、謹慎地裝載、搬移、積載、運輸、保管、照料和卸載所運貨物。
  5. Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine

    非包封線圈三相干式變壓器,具有安全可靠節能防火防爆維護簡單等優點。其設計先進結構合理外形美觀。主要性能指標均優于國內標準,如局放水平空載損耗負載損耗噪聲以及能適應高溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及防火要求高負荷較大的地區,適用於高層建築機場車站碼頭地鐵醫院電廠冶金行業購物中心居民密集區以及石油化工核電站核潛艇等場所。
  6. Windings d. c. resistance measurement, measurement of impedance voltage and on - load loss, measurement of no - load loss and on cload current, power frequency withstand voltage test, inductive voltage with standing test, measurement of partial discharge level, inspection of appearance and dimension inspection of name plate

    直流電阻測試匝數比測量及電壓矢量關系的校定阻抗電壓及負載損耗的測量空載損耗及空載電流的測量工頻耐壓測試感應耐壓測試絕緣電阻測試局部放電測試外觀和尺寸的檢驗銘牌的檢驗等。
  7. Cables for signs and luminous - discharge - tube installations operating from a no - load rated output voltage exceeding 1 kv but not exceeding 10 kv

    空載運行電壓1k以上但不超過10k的發光管裝置和發光管設備用電纜
  8. Discharge the capacitor to a load after it has charged fully enough, and this produces an exponential decay pulse ( edp ) on the load

    通過開關式穩壓電源產生高壓直流,並控制該電壓對電容器進行充放電就能輸出指數衰減陡脈沖波形。
  9. Signs and luminous - discharge - tube installations operating from a no - load rated output voltage exceeding 1 kv but not exceeding 10 kv - part 1 : general requirements

    無載額定輸出電壓大於1kv小於等於10kv的信號和輝光放電管設備.第1部分:一般要求
  10. For separated push rod, switch on, under no - load condition, the oil cylinder makes reciprocating movement for several times, to discharge air in the cylinder and oil pipeline, then adds load

    分體推桿,接上電源讓油缸在無負載情況下,往復動作數次使油缸和油管中空氣排出、再帶上負載。
  11. Signs and luminous - discharge - tube installations operating from a no - load rated output voltage exceeding 1 kv but not exceeding 10 kv - general requirements

    用無荷載額定值的輸出電壓大於1kv小於10kv的電源工作的標志燈和發光放電管裝置.一般要求
  12. Signs and luminous - discharge - tube installations operating from a no - load rated output voltage exceeding 1 kv but not exceeding 10 kv - requirements for earth - leakage and open - circuit protective devices

    無荷載額定輸出電壓大於1kv小於10kv的標志和發光放電管裝置.接地漏電和開路防護裝置要求
  13. Signs and luminous - discharge - tube installations operating from a no - load rated output voltage exceeding 1 kv but not exceeding 10 kv - part 2 : requirements for earth - leakage and open - circuit protective devices

    無荷載額定輸出電壓大於1kv小於10kv的標牌和發光放電管裝置.第2部分:接地漏電和開路防護裝置要求
  14. Tangyin substation is an important substation which has two transformer of 120mva, eight 220kv lines and three 110kv lines. tangqian line is a 110kv line specially for traction transformer substation. because traction load is high - power nonlinear and asymmetry. it will produce much harmonic and negatvie sequence current, which have done harm to compensation capacitors of tangyin substation. in recent years, the tang6c capacitor often interrupted and in 2001 july the tang7c capacitor ' s discharge pt exploded

    湯陰變電站是豫北一座樞紐變電站,有2臺120mva的主變, 8條220kv線路和3條110kv線路,其中的湯牽線是專為牽引變電站供電的110kv線路。由於電力機車屬于大功率的非線性負荷,且三相不對稱,在其運行過程中必然會產生較大的高次諧波和負序電流。
  15. In summer, when hydraulic load ranges from 7ml / l - d to 60ml / l - d, the change of the water quality of water discharge is very small, and the removal ratio is over 70 %

    夏季cod進水濃度為1500mg l左右,水力負荷在7 60ml l ? d范圍內逐漸增加時,出水水質變化不大,去除率基本穩定在70以上。
  16. The results indicated that with the change of water and sand condition and the altitude of tongguan and the development of the industry and agriculture in recent decades, the water environment of wei river had changed largely, which were shown as follow : annual runoff and seasonal flood decreased sharply ; water stream of large discharge decreased and the range of runoff decreased greatly ; sediment load per year decreased generally, sediment concentration of water increased, and the sand silting up was serious ; water channel swung and shrank, and water regime deteriorated ; frequencies of big floods decreased obviously, and hyper concentrated flood increased obviously ; water levels of the same runoff rose universally, and the frequencies of the floods increased and aggravated ; water pollution was very serious

    結果表明,近期隨著水沙條件、潼關高程等的變化及工農業的發展,渭河的水環境發生了巨大變化,表現在年水量及汛期水量銳減;大流量級水流出現次數減少,水量減少幅度大;年輸沙量總體減少,河水含沙量增大,泥沙淤積嚴重;河道向擺動型發展,河道萎縮,河勢惡化;大洪水發生的次數顯著減少,高含沙小洪水明顯增多;同流量洪水位普遍抬高,洪災發生次數增加,洪災加重;水質污染極為嚴重。
  17. With the rise on the highway and railway of traffic discharge ^ the raising of vehicle vociety and the growth of wheel load, a higher demand was presented on intensity, rigidity and durability of the existing bridges, and so forth

    隨著公路和鐵路交通流量的增加、車速的提高、車輛輪載的增大,於是對沿線的橋梁在強度、剛度、耐久性等諸多方面提出了更高的要求。
  18. The fitness of four negative electrode materials such as al, fe, zn, cd, and of six membranes materials : microfiber glass mat separator, polyethylene, polypropylene, polyvinyl chloride, vinylon, soapnated cellulose acetate, and of four current collects : carbon fiber ; nickel foam ; nickel foam sthongthened by iron wire net, punched silver grid in the super - iron alkaline batteries was comparatively studied. the influence of two storaged method ( with and without electrolyte ) and two impurities ( zno, fe ( oh ) 3 ) to the experiment cell ' s self - discharge nature was also comparatively studied. at last, the nature of discharge. structure and electrochemistry of experimental cell with k2feo4 as cathode active material prepared by three different methods : high temperature reaction, hypochlorite oxidizing and electrolysis, was comparative ly studied. we can conclude : i ) the open - circuit potential and the flat of work potential and the percent of capacity of k2feo4 till 1. 0v during the discharge at constant load of experimental cells decreased by the order of al / k2feo4, zn / k2feo4, cd / k2feo4, fe / k2feo4. as for the nature of charge - discharge cycle, cd / k2feo4 fe / k2feo4 zn / k2feo4. in water solute electrolyte, although al / k2feo4 can n ' t be used as storage battery, it have great potential as primary cell or storage cell from the aspect of its discharge capacity. discharge power

    採用組裝實驗電池、 x -射線衍射( xrd )和循環伏安( cv )的方法,從實驗電池的放電特性、充放電循環特性、自放電特性,不同高鐵酸鹽的結構特性和電化學特性幾個方面,對4種金屬負極材料( al 、 fe 、 zn 、 cd ) 、 6種隔膜材料(復合玻璃纖維、幅射接枝聚乙烯、改性聚丙烯、聚氯乙烯、維尼綸無紡布、皂化再生纖維素) 、 4種集流體材料(泡沫鎳、以鐵網為加強層的泡沫鎳、切拉銀網、炭纖維編織網)在堿性高鐵電池中的適用性進行了比較研究;對2種雜質組分( zno 、 fe ( oh ) _ 3 )和2類不同貯存方式(干、濕)對實驗電池自放電特性的影響進行了比較研究;對3種方法(高溫固相反應、次氯酸鹽氧化、直流電解)所制k _ 2feo _ 4的實驗電池的放電特性、結構特性和電化學性能進行了比較研究。
  19. The testing principle and the performing method of testing items such as speed, range, load, discharge voltage and current for electro - hybrid bicycle are described based on deciding the items

    分析和確定了電動助力車主要性能的檢測項目,並對車速、續行里程、載荷、蓄電池的放電電壓和放電電流等被測項目的檢測原理及實現方法進行了探討。
  20. The change of the revolution of compressor by using the frequency conversion technology while the outside burthen alters, enables that refrigerant discharge changes along with the alteration of head load, and therefore refrigerating capacity will change respectively so that refrigeration system can match the variety in heat load

    在外界負荷變化的時候通過變頻技術改變壓縮機的轉速,使製冷劑流量隨著負荷的變化而變化,從而改變系統的製冷量,達到製冷系統與負荷變化的匹配。
分享友人