top liner 中文意思是什麼

top liner 解釋
〈英口〉主要的人[物];主要演員。

  • top : n (opp bottom foot)1 頂,頂部,頂端。2 頭,頭頂;尖端;樹梢,樹頂;(事物的)上層部分。3 最高位...
  • liner : n. 1. (固定航線的)定期班;班機。2. 畫線者。3. 畫線的工具。4. (棒球中的)直球,平球。n. 1. 制襯里[襯墊等]的人;裝襯里[襯墊等]的人。2. 襯里;【機械工程】襯墊,套圈,襯套。
  1. 1. under the same kind of wall rock and the same condition, displacement of pipe liner is symmetry, for tunnel structure and suffered load are symmetry. as level terra stress is bigger, the maximum of displacement and the first main stress occur in tie - in of pipe liner structure, and its direction is radial and points in hole ; the direction of the third main stress is annular and its maximum occurs in top and bottom hole inner

    1 、同一類圍巖在同一種工況下,由於結構和荷載的對稱性,管片襯砌結構的位移也表現出對稱性,因水平向地應力較大,位移最大值、第一主應力的最大值發生在管片襯砌結構的接頭處,方向為徑向指向洞內;第三主應力的方向為環向,較大值發生在洞頂和洞底內側。
  2. Spoon batter into muffin tins lined with paper baking cups, filling each just to top of paper liner

    把麵糊勺入烤模(烤模抑或抹油或是放一張麥芬紙)要勺滿了, (別溢出來就好) 。
  3. Step 6 : after complete the grouting and curing work between all the installation work in the liner ( including process piping, pipe support, etc. ) & liner and rock bed, complete the installation work of top elliptic head of liner using 35 / 50 ton hyd - crane and 25 ton truck crane

    第六步:待襯管內所有的安裝工作(包括工藝配管、管道支架等)及襯管與巖床間的灌漿、養護工作完成後,用35 / 50噸液壓起重機和25噸汽車起重機完成襯管頂部封頭的安裝工作。
分享友人