working stress 中文意思是什麼

working stress 解釋
【物理學】資用應力,工作應力;【林業】安全應力。

  • working : adj 1 工作的,從事勞動的。2 操作的,作業的。3 工人的。4 (用於)實際工作的,任事的;使用(中)的...
  • stress : n 1 壓力,壓迫,緊迫,緊張。2 【語音】重音;重讀;【詩】揚音;語勢,著重點。3 重要(性),重點,...
  1. Chagan sag is a secondary tectonic unit in chagandelesu depression, northeastern yingen - eji ' naqi basin, and the basement of the basin is a paleozoic fold belt of continental margin or island arc at the connection region of north china plate * tarim plate and kazakstan plate, with the character of erogenic belt. in working area and its adjacent area, the forming tectonic setting of indosinian intrusion was that orogenic belt pressed strongly, intracontinental subduction ; that of early yanshan movement epoch was the stress field transferred from compression to extension meanwhile the incrassate crust of orogenic zone turned to extensional collapse ; and that of early cretaceous volcanics was that the area structure extensional collapse further more during the post period of orogenic phase

    查干凹陷屬于銀根?額濟納旗盆地東北端查干德勒蘇坳陷內的一個次級構造單元,其盆地基底為古生代時期華北板塊、哈薩克斯坦板塊和塔里木板塊交接部位形成的陸緣或島弧褶皺帶,具有古生代造山帶的性質。研究區及鄰區印支期侵入巖形成於造山帶強烈擠壓陸內俯沖的構造環境;燕山早期侵入巖形成於由擠壓轉向拉伸、造山帶的增厚陸殼開始發生伸展垮塌的構造環境;早白堊世火山巖形成於造山期后進一步發生伸展垮塌的區域構造環境。
  2. The frozen coal destruction is the tension stress destroys, and establish the frozen coal cutting model in this foundation, obtains the cutting force, feeding force, tooth spacing according to the smallest energy principle. bring forward a rotary drilling mothod to unload the frozen coal, the broken ability is strong, without frozen depth limits, then obtains this machine working parameters, has combined this method with a grab and determined the plane of vehicle - carried rotary drilling movable coal - unloader

    凍煤破壞是拉應力破壞,在此基礎上建立了凍煤的切削模型,根據最小能量原理得到截割力,進給力和截齒間距的計算公式,分析得到截割力與切削厚度成正比,隨著前角的增大而減小;截齒最優截距與截齒尺寸有關且與切屑厚度成正比;進給力隨著截齒前角增大而增大的規律。
  3. Before repairing, basing on the actual working condition, concerning the weldability, stress and deformation issues, the scheme of the cold welding technology whose essential being gtaw, low temperature preheating, postweld hammer the welded seam was established

    修理前,圍繞兼顧解決焊接性、應力和變形問題,結合實際施工條件制定了以手工鎢極氬弧焊、鎳基焊絲、焊前低溫預熱、焊后錘擊焊縫為要素的冷堆焊工藝。
  4. The existing theoretical analyses have n ' t refelcted this true mechanism of the force transfering in fixed segment of anchor bar. for the sake of studying the working course from elastic to elastoplasticity slide better, this paper put forward shear stress - displacement curve, and solve the internal force distribution along anchor bar by the basic equntion. at the same time, this paper analysize the difference of columniform fixed segment and the segmeng with anchor slab at the foot of anchor bar

    為了更好的研究錨桿在不同荷載作用下,錨桿的工作狀態從彈性到彈塑性發展的整個過程,本文進行了錨桿受力的模型實驗研究,根據實驗結果提出了剪應力與位移的彈塑性本構關系表達式,並根據錨桿受力的基本方程,求解得出了錨桿在不同工作狀態下從彈性到彈塑性滑移的全過程中錨桿的內力分佈。
  5. Many people are breaking down these days due to working stress

    許多人因為工作壓力而垮了。
  6. After having analyzed the common test methods of working stress briefly, the boring - electrical test method is proposed to test the working stress of rc compression member

    對工程中常用工作應力測試方法進行了簡要分析,提出利用鉆孔電測法測試鋼筋混凝土受壓構件的工作應力。
  7. Taxi drivers scored highest on the subscale of stress management, and lowest on the exercise subscale. 3. health promoting lifestyle were positive correlated to working stress symptoms

    身體質量指數、健康知識來源數目、吸菸和嚼檳榔行為和工作壓力的疲勞反應,共可解釋健康促進生活型態的總變異量達33 . 4 % 。
  8. The working stress of the rc compression member in existing structures can be calculated through measuring strain change before and after drilling the hole, determining the compressive strength and elastic modulus of concrete through the drilled sample and combining the calculating results of the finite element method

    該方法通過測試鉆孔前後孔邊應變的變化,利用鉆取的芯樣推定混凝土的抗壓強度和彈性模量,再結合有限元計算分析,得到已建結構中鋼筋混凝土受壓構件的工作應力。
  9. Lots of fatigue influencing factors on high strength bolts is analyzed in this paper systematically, including materials, construction processing, fixing and working stress

    本文從材料、構造加工、製作安裝及工作應力等四個方面系統地分析了高強螺栓的疲勞影響因素及影響程度。
  10. Bearing capacity and displacement are two main problems in the application of geotechnical engineering. based on a series of pull - out tests using three kinds of paper and a sort of window screening as geogrid, twenty - seven in limit and several in working - stress geogrid - reinforced slope model tests designed through orthogonal principle have been conducted to have obtained the relationship between the bearing capacity and four factors ( i. e. reinforcement, angle of reinforced slope, the designed - length of reinforcement and the distance between layers of reinforcement ). the law of slope lateral ( horizontal ) displacement versus to the height of slope vary with external - load was derived from the model test data, and the main factor affecting the lateral and vertical displacement of geogrid - reinforced slope was obtained through analysis

    承載力(強度)和變形是巖土工程應用領域的兩大主要問題,本文以紙和窗紗布模擬加筋土邊坡的土工格柵,在一系列拉拔試驗的基礎上,以正交設計理論分別安排27個極限應力狀態和若干個工作應力狀態加筋土邊坡模型試驗,並以模型試驗獲得的數據為依據,採用誤差、極差及回歸分析方法,探討了加筋土邊坡承載力與筋類、筋長、層間距、坡角4因素的相關關系,獲得了在外荷載作用下加筋土邊坡的側向位移隨坡高的變化規律(並進行了定性解釋)和坡頂的豎向位移特性,並分析其主要控制因素。
  11. Taxi drivers ' working stress symptoms scored highest on the subscale of physiological symptoms and lowest on the fatigue subscale. 2

    二、健康促進生活型態得分以壓力處理最高,運動得分最低。
  12. Safe working stress

    安全工作應力
  13. The working stress state and the stability of typical blocks of baise rcc gravity dam are computed and studied based on the 3d non - linear finite element method ( fem ) and rigid body - spring element method ( rbsm ). the analysis of failure process, failure mode, failure mechanism of the dam are studied with overload method and combined method in which rock strength parameters are decreased while water load is overloaded to a certain degree. in this paper, the following works are done

    本文充分發揮有限單元法和剛體彈簧元法的優點,對百色rcc重力壩典型壩段( 9b 、 4b )地基穩定安全性進行數值分析和計算,從超載法、綜合法等不同角度,對壩基穩定性開展研究,分析壩體和壩基破壞過程、破壞形態和破壞機理,確定壩基可能的滑動路徑和滑移模式,評價工程的穩定安全性。
  14. With these work groundings, the working stress levels for individual component of the folded - wing are evaluated

    在此基礎上,對折疊翼面機構各構件在彈性動力學運動過程中的工作應力水平給予了分析與評估。
  15. In the article, the numerical simulation software ansys is used to analyze the working stress distribution in butt joint and the effect of the geometric parameter on the stress concentration efficiency

    摘要通過數值模擬軟體ansys分析對接接頭的工作應力分佈,找出了對接接頭的幾何參數對應力集中系數的影響。
  16. For the first time, the theory of fuzzy reliability is applied to study the strength design of cycloid ball reducer. the randomness of working stress and the fuzziness of allowable stress are discussed

    根據模糊可靠性理論,對該傳動的強度模糊可靠性設計原理和方法進行了探討,推導出該傳動機構接觸強度的模糊可靠度計算公式。
  17. The major instrument employed by this study is college working stress scale

    摘要本研究主要測量工具為《大學教師工作壓力量表》 。
  18. Results of the study indicate that there are five major types of college working stress - working pledge, teaching pledge, relationship, working load and working interest

    結果顯示,大學教師的工作壓力主要類型為包括工作保障壓力、教學保障壓力、人際關系壓力、工作負荷壓力和工作無樂趣壓力。
  19. The results showed that the fatigue fracture of the connecting head happened first, which was related both to the working stress and to the processing of this part

    結果表明,連桿蓋首先發生疲勞斷裂,隨后導致連桿螺栓的斷裂,而這種斷裂既與應力有關,又與零件的加工工藝有關。
  20. The resuits show that metallurgical deject is the main reason leading to early formation of fatigue crack under normal working stress

    認為,該曲軸材料的冶金缺陷是導致疲勞裂紋在正常工作應力下過早形成的原因。
分享友人