排水型式 的英文怎麼說

中文拼音 [bèishuǐxíngshì]
排水型式 英文
drainage pattern
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • 排水 : drain off water; drain away water; dewatering
  1. This paper analyzes the groundwater discharging course using fluidics theory and combining quay structure construction ; sets up the method of fast drainage by the dint of pipeline and blind ditch of fragment stone ; and gives the computational mathematical model for quay drainage and calculation formula for drainage process according to the principle of conservation of mass and underground percolation, which have been applied for quay ' s stability design and calculation

    應用流體力學理論結合碼頭結構建設,分析了地下泄過程,藉助管道和碎塊石盲溝建立了港口碼頭快速與擋墻基床的方法;運用質量守恆定律和地下滲流原理,建立了港口碼頭計算數學模過程計算公,並用在了碼頭的穩定設計計算中。
  2. With the establishment of the regional headquarter for asia pacific in shanghai in 2003, geberit underlined its commitment to china. esteemed as a pioneer in sanitary and piping systems, geberit is mastering all kind of in - building water flows. the broad product family ranges consist of flushing tanks and mechanisms, electronic sensors, traps, shower toilets, water drainage and water supply systems

    吉博力公司於1996進入中國,於1996年和1997年在浙江岱山和上海建立了兩個生產基地,主要生產節箱隱蔽箱配件及各種管道系統,並銷售所有吉博力集團的其它產品,如電子感應嘴,電子感應小便沖系統,高密度聚乙烯管道系統hdpe ,以及虹吸屋面雨放系統等。
  3. Pt american type self - priming pumps are suitable for water supply and sewage transportation in factories, mines, construction sites, irrigation in the fields, gardens and fishing grounds

    Pt自吸泵,適用於廠礦、工地給、住宅供、以及農田、花園、苗圃漁場等。
  4. Standard specification for 12 to 60 in. 300 to 1500 mm annular corrugated profile - wall polyethylene pipe and fittings for gravity - flow storm sewer and subsurface drainage applications

    自流管和地下裝置用12至60英寸300 to 1500 mm環形波紋狀異壁聚乙烯管和配件的標準規范
  5. The water intake and outlet of power plant in tidal river bend is researched by model test with adopting w shaped rippled groove which meets the request of model roughness

    摘要進行了潮汐彎道段電廠取試驗,採用w形波紋凹槽方加糙,使模糙率達到了模試驗的要求。
  6. The litter - resistance slowly closing butterfly check valve is developed a newest product based on our butterfly check valve, hydra - matic transmission to be add in the valve with unique design, new stuction and optimum performance, can be used pipeline of water supply and dring with such media : fresh water, sea water, sewage, raw water, ect. the valve should be installed at outlet of the water pump, in stapping the pump, the process of slowly closing after valve plate shuts rapidly. can be guard effectively against the destruction water hummer, so to ensure the safe operation of the pipline

    微阻緩閉蝶止回閥是在我廠生產的蝶雙瓣止回閥的基礎上利用能量轉換原理增設油壓緩閉裝置的新止回閥,設計獨特,結構新穎,性能優宜,適用於凈,源,污,海等介質的供、管路中,安裝於泵出口端,停泵時由於油壓阻尼作用法盤先速閉后緩閉,以消除破壞性錘,保證灌路安全運行。
  7. The optimum conditions for air electrode preparation were shown as follow : 20 % ptfe and 20 % mno2 in active layer, thickness of active layer 0. 15 - 0. 25mm and the ratio of active carbon to ethine black 4 : 1 ; 60 % ptfe in the gas diffusion and waterproof layer, employing na2so4 as pore - making agents, thickness 0. 35 - 0. 45mm, colding forming and layer sequence catlytic layer / gas diffusion and waterproof layer / current collector layout ; employing 40 meshed nickel screen as current collector and thermal treatment temperature over 200

    確定了制備空氣電極的優化工藝條件,催化層中ptfe含量約20 , mno _ 2的最佳含量約為20 ,催化層中活性炭和乙炔黑的比例為4 : 1 (質量比) ,厚度在0 . 15 - 0 . 25mm之間。防透氣層中ptfe的含量約為60 ,以無硫酸鈉作為造孔劑,厚度一般為0 . 35 - 0 . 45mm 。電極各層採用催化層/防透氣層/集流體的布方,冷壓成,熱處理對空氣電極的性能影響較大,熱處理溫度不低於200 。
  8. Compared with the reality, it shows that this model and its parameters are defined reasonablly. to analyse the arrangement of drainage system with different spacings and depths, with unsteady flow formula and benefit index, this paper gives a two - dimensional non - linear programing model for arrangement of drainage system in the barley field, which can be solved by the method of projected gradient. by this model, we make out the optimum solution of spacings and depth of pvc pipe in littoral area of changjiang river that is s = 21. 5 8m, h = l. lm

    論文通過對不同埋深、間距的塑料暗管布局的分析,結合非穩定流公和效益指標,提出了麥田暗管布局的二維非線性規劃模,並利用梯度投影法求解,得出長江下游濱海地區塑料暗管埋設的最優方案為埋深h = 1 . 1m ,間距s = 21 . 58m 。
  9. Saturated sand are testes in the laboratory under the undrained cyclic loading condition with static - dynamic dual purpose triaxial compression test apparatus, which is designed under the cooperation of hohai university and marui co. ltd japan. the results indicate that the stress path approaches from a initial stress point to the failure lines as cyclic loading goes on, and eventually converges on a certain limiting stress path in the vicinity of the failure lines. the stress - strain curve, however, does not converge on a closed hystersis loop ; the shear strain rapidly increases in looser sand or gradually and continually increases in denser sand

    利用河海大學與日本圓井株會社共同研製的新的多功能靜動三軸儀進行了飽和砂土循環扭剪不試驗,研究表明,對于松砂,剪應變幅度快速地由微小增加到百分之幾甚至百分之十幾,對于緊砂,剪應變幅度逐漸地由微小增加到百分之幾甚至百分之十幾;經試驗初步研究表明用初始有效平均正應力歸一化的有效應力路徑很好的一致性。
  10. This paper presents a detailed introduction to the structure, design and application effect of innovative soft mattress applied in yangtze estuary deepwater channel regulation project

    摘要對長江口深航道治理工程中採用新軟體護底的結構、設計方法以及應用效果作一介紹。
  11. Secondly, it brings forward that it is a practical technical and structure mode to use the multiple preventing layer as the water preventing and draining system in highway tunnel of loess

    然後在總結現有公路隧道防技術特點的基礎上,提出了黃土公路隧道防系統宜採用復合防層為主的適用技術與結構,得出了一些有益的結論。
  12. It is commonly recognized that subsurface drainage system can improve pavement performance and extend service life. as an essential part of subsurface drainage system, the layer setting and characteristics of asphalt treated permeable material directly affect the performance of subsurface drainage system, which is lucubrated in this paper. based on the typical semi - rigid pavement without permeable layer, using multilayer elastic system program, rational pavement structure with permeable layer at different locations is first analyzed

    本文以高等級公路瀝青路面的典結構形作為未設層的路面結構原,通過不同的設置層位分析對層的回彈模量和厚度的要求,探討設置層的路面結構的一些結構參數適宜的取值范圍,並在此基礎上運用灰色系統關聯分析方法,對不同設置層位的路面結構的技術指標進行比較分析,得出較優的層位設置方案。
  13. The sediment model tests for the desilting bottom intakes of two hydropower stations are introduced herein, in which a new combined type of " grid desilting gallery + desilting bottom intake " ( grid desilting bottom intake ) is put forward

    文中介紹了2個電站進沙底孔的泥沙模試驗情況,提出了一種新的「格柵沙廊道沙底孔」的組合(簡稱格柵沙底孔) ,取得了理想的沙效果,較好地解決了工程實際問題。
  14. The comparative analysis is made firstly, which shows that the truss arch aqueduct can be built on the weak foundation and is also satisfied with the demand for large span length and the great discharge ability, so the type of aqueduct is a better for the project. then the finite element program ( super sap93 ) is applied to the structural analysis of the space structure

    首先通過對常用渡槽結構的對比分析,闡明該渡槽是一種可在軟弱地基上修建的、能滿足大跨度、大流量要求、適用於南北調中線工程的建築物,然後運用有限元分析程序supersap93對桁架拱空間結構進行了受力分析。
  15. Cfa algorithm : a conwip flowshop sequencing algorithm

    環境下流生產系統序啟發演算法
  16. Accordingly this thesis conducts research on the design and management of swimming pools from the running management of its disinfection, reasons and precautionary measures of its water quality mutation in summers and autumns and its water - saving and energy saving. through the participation of the field running management, the literature search, the actual running experience and the theoretical analysis, this thesis forwards drainage & water supply optimization rules for swimming pools. based on field investigation and research on the filtration speed improvement in pressure filters, it is pointed out that there is a wide filtration speed improvement range in pressure filters

    鑒此,該課題從消毒殺菌的運行與管理、夏秋季游泳池質突變的原因及防治措施以及運行過程中節節能措施等三個方面對游泳池的運行管理模進行了研究;通過參與現場管理與文獻資料的研究,結合實踐經驗,進行理論分析,提出了游泳池給的優化設計原則;經現場測試,對壓力過濾器提速進行了研究,指出相對于目前規范值有較大提速潛力;討論分析設計了大多功能游泳場館處理間自動化控制管理系統。
  17. Based on swmm ( storm water management model ), a typical urban region is selected to calculate the status under the design storms with different frequencies in the region, such as drainage effect and water - logging, overland flow on road etc., and simultaneously, the storm floods under different conditions, including reforming the protruding green belts into plain or concave ones, placing flood storage areas etc., are simulated with the evaluation on their effects

    摘要以swmm為基礎,選取北京市典小區,計算不同頻率設計暴雨下小區效果以及積、道路坡面流等情況,同時進行不同情景下的暴雨洪模擬並評價其影響,包括改凸綠地為平和凹、設置蓄洪區等。
  18. Abstract : based on laboratory test results, a model for predicting the residual deformation of soft clay under impact loading is proposed in this paper, which fits well with other test results. this model, considering several factors which affect the residual deformation such as confining pressure, impact energy and the number of impacting, can be used for the deformation prediction in the treatment of saturated soft clay by the drainage consolidation method of combining static and dynamic loading

    文摘:在試驗基礎上建議了一個預測沖擊荷載作用下飽和軟粘土殘余變形的計算模,該模考慮了周圍壓力、沖擊能大小、沖擊次數和沖擊遍數等幾個因素.對計算模的驗證表明,預測值與實測值吻合較好.該模可用於動靜結合固結法處理軟基時的變形計算
  19. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推力計算結果和本滑坡屬牽引滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定狀態,因此建議此滑坡治理採用上部削坡減載與錨拉抗滑樁、擋墻進行支擋結合的處理方法,同時結合截等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和底界層及分佈特點和分析,將本工程危巖體失穩崩塌的方歸納為墜落、傾倒和滑塌三種類並分別提出相應的穩定性計算方法; ( 6 )分別對本工程中的危巖體進行了穩定性計算,並且發現其都處于不穩定狀態,因此根據實際情況分別提出相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核計算,滿足要求。
  20. Research on reasonable section configuration of waterproofing and drainage in loess and soft surrounding rock road tunnel

    黃土軟巖公路隧道防合理結構研究
分享友人