排水量計算表 的英文怎麼說
中文拼音 [bèishuǐliángjìsuànbiǎo]
排水量計算表
英文
displacement sheet- 排 : 排構詞成分。
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 算 : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
- 表 : Ⅰ名詞1 (外面;外表) outside; surface; external 2 (中表親戚) the relationship between the child...
- 排水量 : displacement; withdrawal; tonnage; water discharge; water displacement
- 排水 : drain off water; drain away water; dewatering
- 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
-
With the numerical solution, an internal condensation critical curve can be calculated out by condensation theory and depositing theory, on the curve, the enter water ability equal to the out water ability, which can be used as the basis to determine the occurrence of internal condensation. but the result doesn ’ t coincide with the real completely. in this dissertation, we plan to get the critical curve by practical experiment results, because that the enter water ability only relates to the condensation density and the out water ability only relate to the volume ratio of the pneumatics system
然而由凝結理論和沉積理論得到的計算結果往往與實際有一定偏差,本課題希望通過實驗的方法獲得內部結露臨界線,即系統進水能力和排水能力相等的曲線,由於系統的進水能力和充放氣過程中凝結水滴密度有關,排水能力和系統容積比有關,可以通過大量實驗總結出以凝結水滴密度和容積比表示的內部結露臨界曲線,作為判別內部結露是否發生的依據。Main contents for studying of the paper is : ( 1 ) analysing the outcome, characteristic and the problem of the hot water supplydesign second flow method in the europe and the usa. ( 2 ) it is determined that value frequenly of different fixture use in the period of using water high peak. ( 3 ) the relation between the n and the hot watersupply design second flow is got by applying program to computer under the different probablity
本課題研究的主要內容為: ( 1 )分析對比歐美主要國家熱水設計秒流量計算方法的結果、特點及存在的問題; ( 2 )根據我國居民生活用熱水特點,由用水量標準推算出各類型水用戶用水高峰期的衛生器具使用概率; ( 3 )編制計算機程序,計算不同使用概率情況下,給水當量與熱水設計秒流量的關系表; ( 4 )建立熱水設計秒流量q _ g和給水當量n與使用概率p之間的相關關系; ( 5 )繪制《建築給水排水設計規范》中有關熱水設計秒流量計算方法的計算用圖表。Thus it is very difficult to calculate the spill volume and water quality because they involve many processes such as rainfall, yield runoff of rainfall 、 flow concentration of surface runoff, ground pollutant build up 、 washout, the flow concentration of combined drainage system and cso
其中,合流制排水系統的溢流水量、水質的確定涉及到降雨,地面產流、匯流,地表污染物的累積、沖刷,污水在管渠中的匯流以及溢流等多種因素,採用一般方法很難定量計算。The same problem occurs at the computer output, where it is often necessary to convert numerical output data form the computer into mechanical displacements or analog - type electrical signal
在計算機輸出一樣的問題發生,轉換用數表示的產量數據在哪兒經常是必需的形成計算機進機器的排水量或模擬類型電信號。According to the characteristic of computer center of college, the article conducts a series of research on the questions of management in course arrangement, open computer reckon - by time and charge statistics in computer center. it aims to improve the quality and levels of management of computer center. for example, according to teacher ' s demand of computer teaching general timetable of computer operation is formed and the timetable of each day will be shown at the entrance of computer center, so the teacher can direct the students to operate the computer effectively and orderly
本文根據大專院校計算中心的特點,對計算中心的課程安排和開放的計時計費統計等一系列管理問題進行了研究。目的在於提高計算中心的管理質量與水平,如:根據任課教師的教學上機要求形成計算中心的總體上機課程表,並將每天的上機課程表顯示在計算中心的入口處,指導學生高效有序地上機;教務處可通過校園網查看計算中心的上機課程表;對于開放上機,能準確地計時計費。Through researching the general laws of run _ off formation, deducing the design formula of drainage discharge and analyzing e ach parameter of the formula, the reasonable calculation method for parameters i n the drainage design formula, is presented
通過研究地表徑流的形成規律,對排水流量設計公式的推導和計算公式中各參數意義的分析,提出滑坡排水設計計算公式中各參數的合理計算方法The difference between disturbed soft clay and field soft clay is compared, and the example suggests that the disturbance degree resulted from the construction of prefabricated band drains is about 30 %. the disturbance slower the consolidation of the soft clay ground, and the extra settlement resulted from disturbance is also notable. to verify the theory developed herein, the analytical solutions are compared with the field measured ones, which shows that they are in a good agreement
實例分析表明,施打排水板的實際擾動度約為30左右,擾動減緩了地基的固結速率,引起地基的附加沉降量也是相當明顯的,考慮土結構性的地基沉降計算方法得到的計算結果和地基實際固結沉降量較為吻合,說明了計算理論的可靠性和合理性。In estimating performance, remember to include typical and a - typical circumstances, direct and indirect influences as well as internal and external factors to capture reflect the actual pattern of consumption emissions discharges arisings that are to be estimated
估計表現水平時,必須考慮具代表性及非具代表性情況直接及間接影響內部及外來因素,以說明反映估算項目用量廢氣量排污量污染物排放量的實際模式。The recognition and measurement of social, economic, and environmental benefit are studied and concrete expressions of these three objects are given ; according to different features of water users and water sources, the concepts and calculation methods of water use fair coefficient of water users and water supply sequence coefficient of water sources are presented ; the concept and calculation method of accordant coefficient of water environment and economic system are also put forward and it is considered as a condition of constraint ; the method to calculate discharge amounts of key contaminants in a planning standard year is brought forward ; on the basis of analyzing characteristics of the model for optimal allocation of regional water quality and water quantity, the method based on matlab optimal toolbox to solve the model is discussed
模型中考慮了社會目標、經濟目標、環境目標的識別和度量方法,給出了三類目標的具體函數表達式;根據用戶特性和水源特性的不同,引入了用戶用水公平系數、水源供給次序系數的概念和度量方法;由於區域水環境與經濟的協調發展是區域可持續發展的核心內容,因此本文提出了水環境經濟協調發展度的概念,並給出了相應的計算公式;對規劃水平年區域重要污染物排放量進行了計算,並以約束條件的形式予以考慮;分析了區域水質-水量聯合優化配置模型的大系統、多目標、非線性等特點,探討了基於matlab優化工具箱的模型求解技術和方法。分享友人