排水量計算 的英文怎麼說

中文拼音 [bèishuǐliángsuàn]
排水量計算 英文
discharge calculation
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • 排水量 : displacement; withdrawal; tonnage; water discharge; water displacement
  • 排水 : drain off water; drain away water; dewatering
  • 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
  1. This paper analyzes the groundwater discharging course using fluidics theory and combining quay structure construction ; sets up the method of fast drainage by the dint of pipeline and blind ditch of fragment stone ; and gives the computational mathematical model for quay drainage and calculation formula for drainage process according to the principle of conservation of mass and underground percolation, which have been applied for quay ' s stability design and calculation

    應用流體力學理論結合碼頭結構建設,分析了地下泄過程,藉助管道和碎塊石盲溝建立了港口碼頭快速與擋墻基床的方法;運用質守恆定律和地下滲流原理,建立了港口碼頭數學模型和過程公式,並用在了碼頭的穩定設中。
  2. Brings forward the basic network cell model of symmetrical blast vault and asymmetric blast vault. then studies and analyses airflow in vault of main voltage switchyard hall of xiluodu hydropower station which is far cry and large numbers of airflow conflux, brings forward concept of “ virtual embranchment ” and corresponding basic network cell model, regresses calculate expressions of flux uniformity coefficient and impedance of “ virtual embranchment ” of vault of main voltage switchyard hall of xiluodu hydropower station

    而後又採用cfd數值模擬的方法對溪洛渡電站主變洞風拱頂這種多股氣流匯流的長距離通道內的氣流流動進行了分析,提出了「虛擬分支」的概念和相應的網路基元模型,並回歸得到了溪洛渡電站主變洞風拱頂各個風「虛擬分支」風均勻系數以及阻抗的公式。
  3. But now it ' s urgent to adopt new methods for calculating the head loss of regional drainage due to some factors such as long length, large flow quantity and probable strong topographic change

    由於存在管線長、流大以及區域地形變化幅度可能較大等因素,建設區域系統需要採用新的方法較為準確地頭損失。
  4. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高頭、大泄流情況時存在的一些力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高頭( 252m ) 、大泄流( 1400m ~ 3 s )條件下旋流式豎井中的流運動特徵進行了比較全面的測,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋方法,其結果與實測值吻合良好;三、利用試驗與結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井流總摻氣方法,為導流洞氣方案的設提供了參考依據;六、在高頭、大流條件下,豎井空腔段下部流速很高,盡管流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  5. With the numerical solution, an internal condensation critical curve can be calculated out by condensation theory and depositing theory, on the curve, the enter water ability equal to the out water ability, which can be used as the basis to determine the occurrence of internal condensation. but the result doesn ’ t coincide with the real completely. in this dissertation, we plan to get the critical curve by practical experiment results, because that the enter water ability only relates to the condensation density and the out water ability only relate to the volume ratio of the pneumatics system

    然而由凝結理論和沉積理論得到的結果往往與實際有一定偏差,本課題希望通過實驗的方法獲得內部結露臨界線,即系統進能力和能力相等的曲線,由於系統的進能力和充放氣過程中凝結滴密度有關,能力和系統容積比有關,可以通過大實驗總結出以凝結滴密度和容積比表示的內部結露臨界曲線,作為判別內部結露是否發生的依據。
  6. In order to calculate quantitatively the process of rainfall - runoff, the css model of zhang cha catchment is developed based on epa ’ s swmm ( storm water management model ) in this paper. and then calculate cso spill water quality 、 spill volume and spill time at different intercepting ratio using the developed swmm, and analyze the effect on them by intercepting ratio

    為了實現上述降雨?徑流過程的定,本文引入美國環保局的城市暴雨管理模型( swmm )建立了佛山市張槎區的合流制系統模型,使用該模型了不同截流倍數時溢流污質、以及溢流時間,並分析了截流倍數對它們的影響。
  7. This paper evaluates the underground water resources and its safe levels of miming, and then studies the availability of molepipe drainage, a kind of practical underground water regulation technique. starting with the elevation of underground water resources and a safe level of mining through variable system theory, this paper analyzes the conditions of underground water resources based on the well - studied determination method of determining the two hydrographical coefficients : rainfall infiltration replenishment rate and irrigation replenishment rate. then considering irrigation, rainfall, drainage and other related factors, a mathematical model is set up for the calculation of underground water storage, exploitation on water regulation

    論文從灌區的地下資源及其可開采評價分析方面入手,在對兩個主要的文地質參數即降雨入滲補給系數、灌溉入滲補給系數確定方法研究的基礎上,對灌區的地下資源狀況進行分析,依據灌區的灌溉、降雨、條件及各種現狀因素,建立了地下資源的數學模型,西安理工大學工程碩士專業學位論文得到青銅峽灌區地下的最大補給和可開采;另外對在開發利用地下資源過程中的地下位的調控進行了初步的探討,在銀北灌區開展對暗管調控地下位的試驗研究。
  8. With the tridimensional finite element method the tridimensional seepage was computed, by the analysis and the computation of tridimensional seepage, the discharge method of the cushion could be asserted, at the same time, the discharge of pump drainage and the up - lift of cushion bottom could be got

    通過三維有限元法墊塘三維滲流場,通過三維滲流分析,確定了墊塘方案,並得到墊塘底板的揚壓力值及抽系統的
  9. Making use of many layers composite technique and heat press technique to make artificial skull, through a series of performance testes ( including elongate performance, compress performance, curve performance, concussion performance, lay cut performance, concussion cut performance ), making use of drainage method to calculate its average density, which is 1. 25kg / m3, and combustion method to calculate its content of macromolecule, which is 57. 7 %

    利用多層復合技術和模壓技術制備來的人工顱骨復合材料,通過對其一系列性能測試(包括拉伸性能、壓縮性能、彎曲性能、沖擊韌性、層間剪切強度和沖擊剪切強度等) ,證明了該復合材料具有良好的物理機械性能。採用復合材料的平均密度為1 . 25kg m ~ 3 ,採用灼燒法復合材料的含膠為57 . 7 ,證明該復合材料比強度較高。
  10. For tianjin olympic center stadium project, parameters determination of a natural lake used as cooling pond and the layout plan of the lake were introduced, including the flow scheme of recirculating cooling water system, calculation of heat released from cooling pond, engineering arrangement for the lake, and the lake water treatment, etc

    摘要結合天津奧林匹克中心體育場工程,介紹了利用天然湖作為冷卻池的參數確定及湖平面設,具體包括冷卻循環系統流程、冷卻池、冷卻湖的工程布置、湖質處理等。
  11. Main contents for studying of the paper is : ( 1 ) analysing the outcome, characteristic and the problem of the hot water supplydesign second flow method in the europe and the usa. ( 2 ) it is determined that value frequenly of different fixture use in the period of using water high peak. ( 3 ) the relation between the n and the hot watersupply design second flow is got by applying program to computer under the different probablity

    本課題研究的主要內容為: ( 1 )分析對比歐美主要國家熱秒流方法的結果、特點及存在的問題; ( 2 )根據我國居民生活用熱特點,由用標準推出各類型用戶用高峰期的衛生器具使用概率; ( 3 )編制機程序,不同使用概率情況下,給與熱秒流的關系表; ( 4 )建立熱秒流q _ g和給n與使用概率p之間的相關關系; ( 5 )繪制《建築給規范》中有關熱秒流方法的用圖表。
  12. Thus it is very difficult to calculate the spill volume and water quality because they involve many processes such as rainfall, yield runoff of rainfall 、 flow concentration of surface runoff, ground pollutant build up 、 washout, the flow concentration of combined drainage system and cso

    其中,合流制系統的溢流質的確定涉及到降雨,地面產流、匯流,地表污染物的累積、沖刷,污在管渠中的匯流以及溢流等多種因素,採用一般方法很難定
  13. The construction of small residential communities in our country are developing very quickly in recent years, but the design for water supply of small community are less available in the water supply and drainage design manual, design specifications and textbooks. when the designs are done, there is not a consistent formula, and the design results exist some problems. so this cannot be satisfied with the practical demands, which sometimes influence the safety water supply of residential communities

    近幾年,我國大中城市的住宅小區建設發展快速,但目前我國現有的給手冊、設規范以及教科書對生活小區的給闡述的較少,生活小區的給無章可循,公式不一致,設結果往往有些出入,不能很好地滿足實際需要,影響小區安全供
  14. The same problem occurs at the computer output, where it is often necessary to convert numerical output data form the computer into mechanical displacements or analog - type electrical signal

    機輸出一樣的問題發生,轉換用數表示的產數據在哪兒經常是必需的形成機進機器的或模擬類型電信號。
  15. The determination of water supply design second flow is one of the most important subject in building water supply and drainage and is the moist frequent question in designing

    秒流是建築給中最重要的課題之一,是設中使用最頻繁的工作,如何將設秒流更符合實際情況是一個值得探討的問題。
  16. Discussion in calculating engineering quantity of drainage cast ironpipe and trap

    鑄鐵管及存彎工程的一些問題的探討
  17. Through researching the general laws of run _ off formation, deducing the design formula of drainage discharge and analyzing e ach parameter of the formula, the reasonable calculation method for parameters i n the drainage design formula, is presented

    通過研究地表徑流的形成規律,對公式的推導和公式中各參數意義的分析,提出滑坡公式中各參數的合理方法
  18. Although both of them are used to drain stormwater out of city, they have different design standards, storm sampling methods, frequency distribution, and calculation methods of runoff

    2種系統遵循不同行業規范,採用的暴雨選樣方法、設標準、頻率分佈模型、設方法等各不相同。
  19. This paper states on the problems in water preventing and draining of highway tunnel of loess in gansu province and near area. firstly, it discusses the method to analyze and calculate the affect of groundwater characteristic, estiniate of tunnel water quantity and the varying of water contained in loess to the stability of surrounding rock mass according to the principle of groundwater leaking, hydraulic penetrating principle, groundwater dynamic law, groundwater flowing modulus low and so on

    本文針對甘肅省內外部分黃土公路隧道防方面存在的問題,首先根據黃土層地下運規律,按力學滲流原理並應用地下動力學法和地下徑流模數法等方法,探討了黃土層地下情特性、隧道滲透涌對圍巖穩定性影響的分析方法。
  20. At the same time, study on the relation between them needs calculating quantitatively combined sewer system overflow ( cso ) spill volume 、 time and water quality and study the self - purification of contamination in receiving water

    研究截流倍數與體環境質之間的關系,則需要定合流制系統的溢流質以及溢流時間,並在此基礎上研究溢流污體中的凈化過程。
分享友人