改善河道計劃 的英文怎麼說

中文拼音 [gǎishàndàohuà]
改善河道計劃 英文
river action plan
  • : Ⅰ動詞1 (改變) change; transform 2 (修改) revise; alter; modify 3 (改正) rectify; correct 4 ...
  • : Ⅰ形容詞1 (善良; 慈善) good 2 (良好) satisfactory; good 3 (友好; 和好) kind ; friendly 4 (...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • 改善 : improve; ameliorate; perfect; better; mend; modify; improvement; perfection; melioration
  • 河道 : river course; streamway; covalency; runway; cut; river channel河道變遷 channel change; migration ...
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. With the stage i and stage ii works completed, the river section downstream of lo wu has been improved to the required flood protection standard of " one in 50 years "

    深圳治理工程的第i及ii期已完成,羅湖下游一段的已獲得,達到能抵禦五十年一遇暴雨的防洪標準。
  2. River action plan

    改善河道計劃
  3. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 119cd ( part ) drainage improvement in northern new territories, package c ( phase 1 ) - - drainage improvement works at lung yeuk tau, kwan tei, tan shan river and leng tsai, fanling, new territories - - ancillary road works

    路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務項目第119cd號(部分)新界北部雨水排放系統c部分(第一期)新界粉嶺龍躍頭、軍地、丹山及嶺仔雨水排放系統工程附屬路工程
  4. Roads works, use and compensation ordinance chapter 370 notice under section 8 - pwp item no. 119cd part drainage improvement in northern new territories, package c phase 1 - drainage improvement works at lung yeuk tau, kwan tei, tan shan river and leng tsai, fanling, new territories - ancillary road works

    路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務項目第119cd號(部分)新界北部雨水排放系統c部分(第一期)新界粉嶺龍躍頭、軍地、丹山及嶺仔雨水排放系統工程附屬路工程
  5. Roads works, use and compensation ordinance chapter 370 notice under section 8 - pwp item no. 109cd drainage improvement works in tai po road works ancillary to the proposed river improvement works in upper lam tsuen river, she shan river and upper tai po river

    路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務項目第109cd號- -大埔雨水排放系統建議的林村上游、社山及大埔上遊工程附屬路工程
  6. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 109cd drainage improvement works in tai po road works ancillary to the proposed river improvement works in upper lam tsuen river, she shan river and upper tai po river

    路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務項目第109cd號- -大埔雨水排放系統建議的林村上游、社山及大埔上遊工程附屬路工程
  7. These rivers have not shown such positive gains over the past two decades as those achieved by the rivers indus and beas. the pollution load of the rivers has certainly been significantly reduced as a result of the livestock waste control scheme and implementation of wpco controls after december 1990. however, large numbers of farms remain in the catchments of the river ganges, yuen long creek, the kam tin river and tin shui wai nullah

    天水圍明渠及錦銹花園明渠的水質近年來並沒有像梧桐和雙魚一樣顯著地,雖然政府於1990年12月推行了禽畜廢物管制及實施水污染管制條例,的污染量有所減少,但平原元朗錦田及天水圍明渠集水區一帶尚有許多禽畜農場,加上區內不少鄉村尚未設有公共污水管,因此污染問題並不容易解決。
  8. Tsing yi north coastal road, castle peak road and fan kam road ), drainage improvement works in yuen long and shenzhen river, site formation, slope works, landfill, reinforced fill works, reclamation, and work on rock tunnels and caverns

    這些工務包括了工程(例如青衣北岸路、青山公路和粉錦公路) 、元朗及深圳的排水渠工程、其他各類的地盤平整及斜坡工程、填土及加筋填土工程、填海工程、開鑿巖石隧及巖洞等。