改建工程 的英文怎麼說

中文拼音 [gǎijiàngōngchéng]
改建工程 英文
alteration work
  • : Ⅰ動詞1 (改變) change; transform 2 (修改) revise; alter; modify 3 (改正) rectify; correct 4 ...
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 改建 : rebuild; reconstruct; transform改建項目 reconstruction item
  1. At north pieces of railway deck bridge at tongji university way, treasure it designs to be at new urban thingseses at backbone of city distance by yang way yang project treasure, the red line of road is 45 meters wide, ward off the way of urban backbone built once

    寶楊路、鐵山路拓寬改建工程:寶楊路由北段鐵路跨線橋西至同濟路,寶楊路設計為新城區東西向城市主幹路,道路紅線寬45米,一次闢築的城市主幹路。
  2. The dentoid baffle can be used in the practice of hydraulic engineering as a new type of energy dissipation tool

    齒墩設施可作為一種新型的消能運用於擬改建工程上。
  3. Whether there are penalty clauses in the contract to penalize the persons in charge of the conversion works on account of the delay in commencing the works ; if so, of the details ; if not, the reasons for that

    該碼頭延誤施的原因; (二)有否任何合約條款懲罰延遲動改建工程負責人;若有,詳情為何;若否,原因為何;
  4. What we are doing is reconstructing with the existing materials at hand.

    目下作系利用現有材料進行改建工程
  5. Hong kong north west express limited " hknwe " today held a ground breaking ceremony for the reconstruction and modification of the tuen mun ferry pier to facilitate the operation of a new cross - boundary ferry service in the first quarter of 2006

    香港西北航運快線有限公司西北航運今天為屯門渡輪碼頭的改建工程舉行動儀式。碼頭改建工程乃配合預計在二零零六年第一季開展的跨境渡輪服務。
  6. How to ensure the project implement safely and effectively, esp in the complicated condition of geology, the terrain and its features, is the key to restrict the project finishing successfully ; in this paper, the theoretic analyse and pratical study based on the extension of 309 country road ( from wuan to shexian in hebei province ), adopt the method of theoretical analyse, caculater and experiment, improve the controlling blasting skill and construction crafr of roadbed stonework, control the blasting harm effectively, accomplish the construction quickly and safely in normal conditions. the paper puts forward to the relative parameter applying to roadbed extension in beforecrack blasting, and raises the combination of beforecrack demolition and buffer demolition, which is the main way to conctrol the side - slope stable and taking shape. putting to use the achievement produces great social benifet and economic benefitjt has widely practical future

    特別是在復雜的地質,地形及地物條件下,如何保證的安全快速有效實施成為制約順利完成的關鍵。本文的理論分析和實踐研究以國道309河北武安至涉縣段改建工程為依託,採用理論分析計算與現場試驗相結合的方法,研究並優化了路基石方控制爆破技術與施藝,有效控制了爆破危害,實現了保證現有公路正常運營條件下的快速安全施,本文提出了在預裂爆破中適合於路基擴塹的有關參數。同時提出了預裂爆破與緩沖爆破相結合是控制邊坡穩定和成形的主要途徑。
  7. The trial of polystyrene foam plastics board in sanqing arterial canal reconstructed

    聚苯乙烯泡沫塑料板在三清乾渠改建工程中的試驗
  8. Reconstruction of qian you grade - 2 highway in qianjiang section

    黔江段改建工程黔酉二級公路
  9. Reconstruction of qian - peng grade2 highway in qianjiang section

    黔彭二級公路黔江段改建工程
  10. The structure of the arch net floor is not only light but also cheap. it can be used either in new - built projects or rebuilt works. now it has had practical applications in several projects in jilin province and has shown its higher social and economic benefits

    拱網消力池具有優異的水力特性和消能防沖效果,而且拱網結構輕便、投資少,既可用於新,又可用於改建工程,經吉林省幾個的實際應用,已顯示出它所具有的較高的社會效益和經濟效益。
  11. The department took part in the study on the renovation of sanmenxia reservoir, this picture shows sediment sluice from the reservoir

    圖為三門峽水庫樞紐正在泄流排沙,泥沙所參加了三門峽水庫改建工程的科研作。
  12. Marpol waste reception facility at the marine basin and minor modification works of the existing facility at cwtc ( figure 2 to figure 3 )

    臨時運送計劃涉及在上述地點造一條臨時道路及港池內的臨時海洋污染廢物接收設施,以及在化學廢物處理中心現址進行小規模改建工程(圖2至圖3 ) 。
  13. On rebuild construction of shenzhen children library

    淺論深圳少兒圖書館改建工程
  14. Re - construction of yuen long highway eastern end

    元朗公路的改建工程近順達街
  15. Re - construction of yuen long highway western end

    元朗公路的改建工程近富泰
  16. Widening and reconstruction of yuen long highway

    元朗公路擴闊及改建工程
  17. Expansion and modification works at sha tau kok control point

    沙頭角管制站的擴改建工程
  18. Widening and thickening of subgrade for highway improvement works

    改建工程路基拓寬和加高的處理
  19. Re - construction of yuen long highway western end in - situ parapet construction

    元朗公路的改建工程近富泰
  20. By the end of 1931, despite the completion of the aberdeen upper reservoir, the dam reconstruction for the lower reservoir and sediment removal works were still pending

    香港仔上塘於1931年底成后,仍需進行下塘改建工程及挖掘沉沙
分享友人