施工后檢驗 的英文怎麼說
中文拼音 [shīgōnghòujiǎnyàn]
施工后檢驗
英文
inspection after construction- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 檢 : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
- 驗 : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
- 施工 : be in the process of construction; be under construction; build; construction
- 檢驗 : checkout; test; examine; inspect; verify; survey; check;checking;testing;[英國]jerque(指檢查船舶...
-
The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection
本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。The method of close water test has been used for a long time, so richer experience has been achieved. however, it not only takes pains and time, but also consumes raw materials during the close water test because of miscellaneous working procedures such as bricklaying in the two ends of pipe, water - repellent layer plastering, maintaining and water offletting, brick - block backouting after the test, especially in the region short of water and some drainage pipe with prop - pipe construction. in order to satisfy the fast development of municipal construction, new detection methods should be developed
閉水試驗方法因其應用時間較長,目前已積累了較豐富的經驗,但在閉水試驗時,管道兩端砌築磚堵、抹防水層、養護、灌水浸泡,以及試驗后的放水、磚堵拆除等繁雜工序,不僅費工、費時,而且消耗原材料,尤其是在缺水的地區以及頂管施工的無壓管道,這些矛盾更加突出;因此,為滿足迅速發展的市政建設需要,有必要探索新的檢測方法,閉氣試驗就是其中一種,但是閉氣試驗目前還不完善,有待于進一步深入研究。Taking the measure of uncorking on the steel tube and filling water before sand filling, the installation process of sand compaction piles is optimized, the installation parameters and testing rate under the near shore condition are confirmed, and the control and testing methods for the piles ' quality are summarized
採取樁管壁開孔、先灌水后灌砂的方法,優化了水上擠密砂樁的施工工藝;給出了在近岸無掩護、水流急的施工條件下的施工參數和檢驗比率,總結了沉樁定位、高程式控制制、灌砂率等參數的控制措施和檢驗方法。Inspection after construction
施工后檢驗Upon completion of the construction project, the developer shall conduct acceptance inspection according to the construction drawings and specifications, and in accordance with the rules of construction inspection and quality inspection standard prescribed by the state
第二百七十九條建設工程竣工后,發包人應當根據施工圖紙及說明書、國家頒發的施工驗收規范和質量檢驗標準及時進行驗收。According to these, the paper put forward some countermeasures : select low carbon steel or low metal alloy steel with lower intensity, like 20r steel ; while welding, adopt strict craft measures with lower welding heat to input ; after jointing, proceed the whole hot dissolving on time ; control each welding joint with hardness hb 185 ; add 0. 25 % water into the liquid ammonia as decay eclipse ; enhance checking in operation, repairing equipment in time through regular interior and exterior checking
針對上述原因提出了防止氨冷器類臨氨壓力容器產生應力腐蝕裂紋的對策:選用強度稍低,但抗裂性較好的低碳鋼和低合金鋼,如用20r鋼製造;焊接時應採用嚴格的工藝措施和較低的焊接熱輸入量;焊后應及時進行整體消除應力熱處理;控制焊接接頭各區硬度hb 185 ;在液氨中添加0 . 25 %的水作為緩蝕劑;在運行中加強檢查,及時進行停車檢修時的內外部檢查和定期檢驗。By a lot of trial and error, a new - type lightweight fireproofing board is developed. the test results indicate this production has obvious characteristics such as high temperature resistant, moistproofing, low distortion, and fireproofing limitation of 3h. its safety and toxicity has been examined according to relative national criterion and standard and the results show that no deleterious and poisonous gas is produced after combustion
經過反復多次試驗、篩選,研製出的隧道防火板質輕,具有一定的柔韌性,便於施工;耐溫、耐潮濕;變形小;耐火極限達3h ;安全毒性方面,參照室內空氣質量檢測標準等規范進行了測試,測試結果為:產品不釋放有害氣體,屬環保型材料;按照國家相關的材料規范檢測其毒性,檢測結果表明,產品在燃燒后不產生有毒有害氣體。( 3 ) the weld of pe pipe ca n ' t be proof - test by undestroyed probing. pe pipe must be welded by auto fusion equipment and reduce the man - made factor to the minimum at the same time. the operator must be well skilled and highly responsible, who performs upon weld quality control regulations, and check up the weld strictly after fusion
( 3 )聚乙烯管道連介面由於不能象鋼管焊口那樣通過無損檢測手段來驗證是否合格,所以一定要使用自動化程度高的連接機具,將人為因素降到最低,並要求焊工除了熟練的操作技術外還應具備高度責任心,嚴格執行連接施工工藝質量控制要點和有關操作要領,焊接完后採取必要的檢查驗收手段。The main task of the thesis is to judge availability of corresponding seismic measures after code revise through processing inelastic dynamic analysis with the method of multi - waves import for these framework of grade 1 and 2 intensity - category 8 and of grade 1 intensity - category 9 designed in terms of the revised criterions of gb 50011 - 2001 and gb 50010 - 2002. the results show that over - reinforcement of beam because of detailing is the most important reason disturbing framework from forming effective energy - dissipation mechanism
本文的主要任務是嚴格按修訂后的規范gb50011 - 2001和gb50010 - 2002設計8度一級、二級框架和9度一級框架,通過多波輸入(每個結構輸入5條天然波和一條人工波)對所設計框架做非線性動力反應分析,然後按結構的反應結果檢驗抗震設計措施加強后的結構抗震性能,由此對修訂后規范相應措施的有效性做出一定的評判。Reliability : combined with actual examples of gyratory sprayed piles and complex foundation piles this chapter describes selection of gyratory sprayed pumping, scope, spraying materials, determination of gyratory spraying parameters, quality inspection and detailed construction process. based on the results the article summarizes settlement laws through analysis of ground base settlement observation materials and this shows that after treatment ground base settlement was reduced greatly and the method is effective
本文結合工程實例分析了注漿以後形成的旋噴樁以及復合地基的力學特徵,然後對旋噴注漿方案的選擇、注漿邊界范圍、注漿材料、旋噴參數的確定、旋噴質量檢驗方法等具體施工過程進行了詳細描述,通過對工程處理后地基沉降觀測資料的分析,表明處理后地基沉降量有了明顯降低,說明該方法在控制沉降方面非常有效。This will provide concrete reference for parameters values which mainly depend on the experiences. according to the selected bp model and related water table depth records and other information, the annual and monthly mean water table depth trends in the future planning year ( 2005, 2010 ) are forecasted on condition that water saving reconstruction projects are accomplished in the larger scale experimental zone ( jiefangzha ) of hetao irrigation district
在此基礎上根據黃河河套灌區多年的水文、氣象和地下水信息,對一個大尺度區域的多年年均地下水埋深變化進行了bp模型的模擬與檢驗,預測了灌區節水工程實施后未來規劃水平年( 2005 , 2010年)年平均、月平均地下水位下降的動態。China should take measures as follows : first, inspecting all the principles and rules not conforming to the sps agreement and systems and provisions easy to cause trade disputes ; second, perfecting legislation ; third, raising transparency of legal rules and quarantine management ; forth, contracting more international quarantine treaties and articles ; fifth, taking active part in making and modifying international quarantine legal rules ; sixth, strengthening standardization construction
其一,全面清理與《實施衛生與植物衛生措施協定》不符合的相關原則、規則,入世后容易引起貿易爭端的制度、條文;其二,增強衛生檢疫法律法規和檢疫管理的透明度;其三,從內容到形式作及時調整,完善國內法律、法規,真正建立起一整套科學、統一、有效檢驗檢疫法律制度體系。 ;其四,加強國際檢驗檢疫協議的締結工作;其五,積極參加對國際標準的制定和修改;其六,加強標準化建設。分享友人