施工后的 的英文怎麼說

中文拼音 [shīgōnghòude]
施工后的 英文
post-construction
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 4次方是 The fourth power of 2 is direction
  • 施工 : be in the process of construction; be under construction; build; construction
  1. Abstract : the stimulation treatment of & quot; loosening rock by the dilatancy of explosive waves & quot; is tested in the casing well 4242 for studying its result and its influence on casing. the result of the field test shows that this test is successful in technology, the oil production of the well is 4 times as much as that of it before the test ; the deformation of casing is local, and the result of the strength calculation shows that the deformation will not destroy casing

    文摘:為了研究「壓脹松動」增產技術增產效果和對套管影響,在延長石油管理局子長油礦對4242井進行了現場實驗.該技術採用強動載波在地層深處疊加方法,造成壓脹條件,松動巖石,增大近井帶滲透率,提高油井產量.,該井產量增加為原來4倍多.本次實驗藝上是成功,首先是按設計要求引爆了炸藥,其二是由於採取了保護措,使套管變形局限在段處,不影響下泵,不影響油井生產;套管強度校核分析也證明了套管不會破壞.地質效果明顯
  2. Based on the analysis of problems of previous bridge bearings after installation, for installation of the bearings of lhasa river bridge, the construction method of grouting epoxy resin mortar into anchor bolt holes of a bearing with the aid of potential energy of base plates of the bearing is used

    摘要結合分析以往橋梁支座留下隱患,拉薩河特大橋支座採用錨栓孔灌注環氧樹脂砂漿,底板位能壓漿安裝方法。
  3. In order to achieve the optimized tunneling approach, first, tunneling procedures, shift length, horizontal jet grouting length, bench length and space length between c and d part of crd method are optimized ; on the basis of these results, two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved. as results of the optimized scheme, the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure. the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data

    為得出適合本段最佳路線,利用大型有限元通用軟體ansys對開挖順序、開挖進尺、水平旋噴長度、臺階長度及crdc 、 d部相錯長度進行了有限元數值模擬和優化分析,並利用這些分析結果,進行了兩個方案三維有限元動態模擬,得出了較優方案,並利用施工后的地表沉降槽曲線,對sk3 + 355斷面處隧道上方煤氣管線安全性進行了分析,得出了利用此方案不會造成此處煤氣管線破壞結論。
  4. In the simulation and analysis on culvert construction, the method of foundation - pit excavation layer by layer and step by step was used, i. e. the method that makes the surface of excavation have no stress, when the elements were excavated gradually in period of construction. at this process, the state of soil is unloading, the laws of stress field and displacement field with the depth of excavation were studied. based on the obtained stress field and displacement field after the excavation was completed, by using of the newly increased filling - elements " gravity and the grinding force, the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation

    用有限元法模擬分析涵洞基坑開挖時,採用分層、分步模擬開挖過程方法,即將計算域內單元分層「挖去」 ,使開挖表面成為無應力表面方法,分析土體在卸載狀態時應力場和位移場隨開挖深度變化規律;在洞體,回填土體時,據開挖完成時應力場、位移場,通過逐級增加計算域內單元數目,加每級新增加單元自重荷載,利用有限元法模擬基坑及上覆土體分層填築過程,這不僅反映土體處于再加載應力狀態時,填土受力及變形一般規律,而且這種將地基? ?涵洞? ?土體作為一個統一整體進行模擬方法,量化了三者之間相互作用關系。
  5. By using depth - measurable band drains, the supervision engineer or engineering managerial personnel can measure or spot check the embedded depth of each band drain after construction if they were not at site when band drains were being driven, thus improving the construction efficiency and ensuring the engineering quality

    使用可測深型排水板可提高效率,當監理程師或程管理員不在現場對排水板打設進行直接監督和管理時,可以對每根排水板埋設深度進行測量或抽查,因而可有效控制和杜絕人為造成減料,確保質量。
  6. To investigate the practical stability performance of this bridge, a model test is carried out. the test model actually simulates nan pu bridge based on similarity criterion. the model test reveals that the stability factors is more than 2. 0, so the stability and strength of this bridge have been verified to be met with

    該模型試驗首創了「桿對桿」剛度等效法,應用於鋼管混凝土桁架拱橋模型設計和製作中,其研究成果對南浦大橋實橋以及竣運行有重要應用價值,並對今後鋼管混凝土桁式拱橋試驗研究、設計、具有重要指導意義。
  7. In order to study the practical stability performance of chunan nanpu bridge, a total bridge model test was carried through. the design method of " spar to spar " modeling method was firstly introduced in this test. the test results are significant for construction and management of chunan nanpu bridge ; excessively, the test results are significant for design and construction of large span cfst arch bridge also

    該模型試驗首創了「桿對桿」剛度等效法,應用於鋼管混凝土桁架拱橋模型設計和製作中,其研究成果對南浦大橋實橋以及竣運行有重要應用價值,並對今後鋼管混凝土桁式拱橋試驗研究(特別是模型製作) 、設計、具有重要指導意義。
  8. Prestressing force post tensioning type application in bridge construction

    預應力張法在橋梁應用
  9. On monday, the public got its first look at the building after a little more than three years of construction

    經過三年多一點, 「水立方」星期一首次對公眾亮相。
  10. Application of inserted reinforcing bar cage after completion of bored pile with long helix in beijing subway construction

    長螺旋成孔壓灌混凝土成樁插鋼筋籠藝在北京地鐵應用
  11. On december 1, 2002, the first day that the revised chinese trademark law was implemented, wan hui da, representing several clients, submitted the application for registration of 3d trademark, which was newly introduced by the law

    新商標法規定立體商標可以在中國注冊,萬慧達商標代理部及時與客戶聯系,代理客戶將其重要立體商標在新法第一個作日即申請注冊。
  12. Through lab tests on melted and common dark green silty soil of the passway in shanghai fuxing east road tunnel by using the typical triaxial test machine - ckc, their dynamic stress and stress - strain relations with different frequencies were studied

    摘要以上海復興東路越江隧道江底旁通道凍結原狀和凍融作用暗綠色粉質粘土為研究對象,運用ckc循環三軸儀,採用不同頻率來摸擬行車荷載進行室內動三軸試驗。
  13. The author reviewed the operational experience and the basic technical indexes of the prime coat and slurry seal of a highway, briefly analyzed the common failing after constructing the prime coat and slurry seal, in addition to the key measure to ensure the construction quality

    總結了高速公路透層、稀漿封層經驗,對透層、稀漿封層主要技術指標進行了分析,並指出了透層、稀漿封層施工后的質量通病以及確保質量所採取關鍵措
  14. A model with some parameters is used to forecasting the beam camber in the construction. based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed and so on working condition, the model parameters are identified by ann, and the beam camber of different sections are given

    建立預拱度數學模型,根據預應力張拉況橋面實測標高與設計值差異,用bp神經網路識別預拱度模型參數,確定有關各截面預拱值。
  15. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰全結構模型,相對準確地模擬灌注封底混凝土、抽除吊箱內河水、承臺破冰體等三種受力況,並用模型進行了應力和變形計算,計算各況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊頂梁、底梁等應力和變形,並對比吊箱圍堰板面計算變形和實測變形,結果是吻合;對大遼河特大橋高樁承臺輕型吊箱穩定性進行了計算分析;論文研究作表明,應用組合有限元方法計算大型結構問題具有現實意義。
  16. Paints should be allowed to dry in accordance with the manufacture ' s recommendation before over coating

    施工后的塗料在覆塗前應經過一定乾燥時間。這一時間由塗料製造商推薦。
  17. We care about the ideas and preferences of our clients. for us, it would be an important source for the interior design. we would help you to make your dream house come true. by selecting the low pollution materials to reduce the harmful smell after the construction, we would strive to maintain the healthy interior environment

    我們在乎業主想法與美感,對我們而言,您機能需求是最重要設計構想來源.我們想幫你完成你夢想住宅或空間.在室內建材選擇上,我們為業主挑選低污染室內建材,以避免施工后的刺鼻味道
  18. Based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed long span bridge, the model parameters are identified by the genetic algorithm, and the pre - stress loss values of different sections are given

    建立附加損失數學模型,根據預應力張拉橋面實測標高與設計值差異,用遺傳演算法識別損失模型參數,確定有關各截面損失值。
  19. The tallest free - standing structure in the southern hemisphere, sky tower in downtown auckland, new zealand, opens after two - and - a - half years of construction

    1997年今天,南半球最高自支撐式建築,修建於紐西蘭奧克蘭市區中心「天空塔」 ,在2年半對外開放。
  20. Meanwhile, the key research topics are focused on how to reduce the differential settlement between the main tall building and the anex on soft ground, where to set the post - cast strip, and what cause the smart change of the internal force of plate under the core canister of tall building. an experiential equation for estimating the maximum moment of plate is advanced. a method for calculating the range and the thickness of the local enganced plate and another experiential equatio n for estimating the increment of maximum moment of the local plate are also suggested

    同時著重就軟弱地基中減小高層建築主裙房之間沉降差異澆帶設置位置,以及高層建築核心簡體下筏板內力變化劇烈等問題展開了分析,提出了筏板最大彎矩估算值經驗公式,獲得了簡體下局部筏板加厚處加厚范圍及加厚厚度取值方法及加厚處最大彎距增幅估算值經驗公式,為今後設計同一類型高層建築提供一些借鑒。
分享友人