施工通風 的英文怎麼說

中文拼音 [shīgōngtōngfēng]
施工通風 英文
construction ventilation
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 通量詞(用於動作)
  • : Ⅰ名詞1 (空氣流動) wind 2 (風氣; 風俗) practice; atmosphere; custom 3 (景象) scene; view 4 ...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 通風 : 1 (使空氣流通) ventilate; air 2 (透氣) be well ventilated 3 (透露消息) divulge information;...
  1. The production and operations of the company suction fan and water poon cooling equipment, known as the new generation of wang ventilation cooling, cooling dust removal of the air smell, improve air quality with a good performance, can be widely used in industrial production, plastic injection, automobile maintenance, petrochemical, paint electroplating, logistics, warehousing, horticultural greenhouses, public facilities and other fields

    公司生產經營的負壓式機及水濂降溫設備,號稱新一代的降溫王,對于降溫除塵、去除空氣異味,提高空氣質量具有良好效能,可廣泛應用於業廠房、塑料澆注、汽修保養、石油化、烤漆電鍍、物流倉儲、園藝溫室、公共設等領域。
  2. The production and operations of the company suction fan and water poon cooling equipment known as the new generation of wang ventilation cooling cooling dust removal of the air smell improve air quality with a good performance can be widely used in industrial production plastic injection automobile maintenance petrochemical paint electroplating logistics warehousing horticultural greenhouses public facilities and other fields

    公司生產經營的負壓式機及水濂降溫設備,號稱新一代的降溫王,對于降溫除塵、去除空氣異味,提高空氣質量具有良好效能,可廣泛應用於業廠房、塑料澆注、汽修保養、石油化、烤漆電鍍、物流倉儲、園藝溫室、公共設等領域。
  3. They have raised all kinds of engineering steps on roadbed against frozen disaster, for example, adopting the reasonable height of roadbed, building ventilative embankment, setting up the defense, burying hot metal stick, making use of stone to protect slope and laying thermal insulation and heat insulation material etc, laying eps is one of these special steps

    針對路基凍害問題,人們對路基凍脹、融沉和溫度場特徵進行了廣泛研究,提出了各種路基抗凍害的程措,如選用採用合理的路堤高度,修築路堤,設置護道,埋設熱棒,利用片石護坡和鋪設保溫隔熱材料等特殊程措
  4. The armor plate is a product of no cutting bits, holding the advantages that being high usingrate, firmintensity, slippery proof, easy to fix, durability and breezy, ectc. it can be used as motoway partition, air field runway and used for mine, dock, working platformand so on

    篩網作為一種無切屑產品,其鋼板利用率高,強度牢固,具有防滑、性能好、方便、經久耐用等優點;用於高速公路建築、大型飛機楊跑道、礦井、碼頭、作平臺、隔離等。
  5. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了導流建築物的等級、水布置。過水力學計算、結構設計、導流方案投資比較、進度分析和投資險分析,說明了四湖溝水利樞紐程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為決策提供理論依據。
  6. Engineering controls : use local exhaust ventilation to control dust

    程式控制制:使用當地除塵
  7. A contractor must not under any circumstances, commission any plant, or turn on any service such as electricity, air or water without first obtaining the permission of the construction manager or his nominee

    《承包商》若未首次取得負責管理此事項高級程師的允許,在任何情況下不得使用任何裝置投入試運行,或接諸如:電、、水之類的輔助設
  8. By analyzing risk sources and those uncertain factors affecting the risk, the diversion risk is defined as the probability of the maximum discharge after being adjusted and held higher than the maximum design flood

    過對導流險來源和引起導流險的各種不確定性因素的論述和分析,把導流險定義為天然來(洪)水經過調蓄后,導流泄水建築物的最大泄水流量超過其設計最大泄水能力的概率。
  9. By means of the numerical simulation and considering many factors synthetically such as steel weight of the platform structure, the construction program, investment costs and geotechnical risk, the contrastive analysis has been made to the types of the platform structures with skirt piles and main pile, and finally it is determined in use skirt piles for weizhou 11 - 1 platform

    過數值模擬計算,綜合考慮平臺結構用鋼量、方案、投資費用和程地質險等多種因素,對平臺採用裙樁結構型式和主樁結構型式兩種方案進行了對比分析,最終確定潿洲11 - 1平臺採用裙樁結構型式。
  10. For a specific project, the construction cost of the project can be reasonably and scientifically analyzed and estimated by means of the reasonable planning for the resources allocation adaptable to the project made through the economic assessment on the conduction process ; by which the cost control indexes can be determined, the relevant internal checking mechanism and the budget system for construction cost control can be established, and then the avoidable measures for possible economic risk can be made as well, so as to obtain the benefit indexes adaptable to all the specific items to realize the management of the construction cost control for the whole construction process and build up the scientific and reasonable system of economic responsibility for making a basis for completing the project with better quality effectively, economically and reasonably

    摘要過項目的過程經濟評佑,制定出適應程項目的合理資源配置計劃,對具體程項目的成本進行合理、科學的分析判斷,確定成本控制指標,建立成本控制內部考核機制和成本預算制度,找出具體子項的經濟險源所在,建立相應的經濟險規避措,獲取適應每個具體項目的利潤指標,實現程項目全過程的成本控制管理並建立科學合理的經濟責任制,以便調動項目部所有人員的創造性和主動性,為最終高效、經濟合理、保質保量地完成任務奠定基礎。
  11. This paper, through the research on the implementing of gaobazhou water conservancy project, demonstrated that the project is technical feasible, economic reasonable, and is conform to the state macro policy in external environment. described the full - aspect management on the design process of gaobazhou water conservancy project, fully demonstrated that the selection of design scheme and the design quality is directly related to the investment, quality and progress control of the project ; described the full - aspect management on the construction process of gaobazhou water conservancy project, discussed the management procedure and manner of supervisor in the construction process, how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract ; described the management on the procurement of gaobazhou water conservancy project, clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract ; described the project acceptance and after - event evaluation of gaobazhou water conservancy project, fully defined the content for the final acceptance of the project ; fully described the comprehensive management carried out on gaobazhou water conservancy project, mainly focused on the study of information management, communication management, conflict management and risk management, which ensured the smooth execution of the project

    本文過對高壩洲水利樞紐程項目實的研究,論證了高壩洲水利樞紐程項目在技術上是可行的,在經濟上是合理的,在外部環境方面符合國家的宏觀政策;闡述了高壩洲水利樞紐程設計過程的全面管理,充分論證了設計方案的選擇及設計質量的高低,直接關繫到程項目的投資、質量和程進度的控制好壞;闡述了高壩洲水利樞紐過程的全面管理,論述了監理在過程中的管理程序和方法,單位遵循一定的監理程序,依據合同科學合理地完成任務;闡述了高壩洲水利樞紐物質設備的采購管理,過對采購合同內容的論述,明確了物質設備采購時應注意的問題;闡述了高壩洲水利樞紐程項目驗收及后評價,明確了高壩洲水利樞紐程項目竣驗收的內容;較全面地闡述了高壩洲水利樞紐程項目實的綜合管理,重點研究了保證高壩洲水利樞紐程項目順利實的信息管理、溝管理、沖突管理和險管理。
  12. No limit for shape : may be used in welding all kinds of ducts. it is extra good for round duct installation. 7

    無形狀限制:在任何形狀的筒上焊,都能保證質量,尤其在圓形筒上時,更能體現出無可比擬的優越性。
  13. Currently, there is still no unified standard on the engine room of telephone offices. in the construction stage, civil designing institutes often only had a rough knowledge of the characteristics of the communications power facility. this has led to an irrational layout of the engine room and air inlets and outlets

    現由於電話局油機房沒有統一的標準,在土建階段因土建設計單位對信電源設備的性能了解得不透徹,造成油機房布局和進、排口安排不合理,在後期對油機房進行消噪音處理時難度加大和投資量增多。
  14. On base of analysis of the main factors of construction risk, interval flood character, operation mode of longyangxia and gongboxia reservoirs, the risk of longyangxia reservoir in different operation mode is estimated

    過對渡汛險的主要因素、區間洪水特性、龍羊峽和李家峽水庫的運行方式等方面的分析和計算,得出龍羊峽水庫不同運行方式下的險率。
  15. Forced ventilation should be provided when applying paint in confined spaces or stagnant air

    在狹窄處或空氣不流,必須提供強力
  16. 2. the random nature of load construction is analyzed. according to analyze various factors on change of reliability index, casting girder 、 construction live load 、 concrete intensity 、 wind load 、 construction distribution load deviation and basket falling, which influence on construction reliability of rigid frame bridge with high - pier and large - span, are obtained

    2 .研究了各荷載的隨機性,過分析各種影響因素對可靠指標的變化程度,得到已澆梁段、分佈活載、混凝土強度、載和荷載偏差以及掛籃跌落等對高墩大跨剛構橋期可靠度的影響。
  17. Abstract : the in servie tubular heaters built early in refineries and chemical plans have low thermal load and low heat efficiency, therefore measures for technical reform are offered, including ( 1 ) enlarging the surface area of convection tubes to increase the thermal load of rhe convection section ; ( 2 ) increasign the heat interchanging area of radiant tubes ; ( 3 ) changing the height of the chimney ; ( 4 ) using new burner with forced air supply to increase calorific capacityu ; ( 5 ) adding air preheater between the convection section and chimney to enhence the temperature of the air entering the furnace ; ( 6 ) adopting high temperature radiant coating to improve the effect of radiant heat interchanging

    文摘:針對早期建造的煉油廠和化廠在役管式加熱爐熱負荷和熱效率低的狀況,提出了若干技術改造措包括,增大對流管表面積以增大對流段的熱負荷;增加輻射管的換熱面積;修正煙囪高度;換用新型燃燒器,變自然為強制供,以增大燃燒器的發熱量,減小過剩空氣系數,節省燃料2 % 3 % ;在對流段和煙囪之間增設空氣預熱器以提高空氣入爐溫度;採用高溫輻射塗料增強輻射換熱效果,從而增加熱源對爐壁的輻射傳熱量和爐管的傳熱量等。
  18. The in servie tubular heaters built early in refineries and chemical plans have low thermal load and low heat efficiency, therefore measures for technical reform are offered, including ( 1 ) enlarging the surface area of convection tubes to increase the thermal load of rhe convection section ; ( 2 ) increasign the heat interchanging area of radiant tubes ; ( 3 ) changing the height of the chimney ; ( 4 ) using new burner with forced air supply to increase calorific capacityu ; ( 5 ) adding air preheater between the convection section and chimney to enhence the temperature of the air entering the furnace ; ( 6 ) adopting high temperature radiant coating to improve the effect of radiant heat interchanging

    針對早期建造的煉油廠和化廠在役管式加熱爐熱負荷和熱效率低的狀況,提出了若干技術改造措包括,增大對流管表面積以增大對流段的熱負荷;增加輻射管的換熱面積;修正煙囪高度;換用新型燃燒器,變自然為強制供,以增大燃燒器的發熱量,減小過剩空氣系數,節省燃料2 % 3 % ;在對流段和煙囪之間增設空氣預熱器以提高空氣入爐溫度;採用高溫輻射塗料增強輻射換熱效果,從而增加熱源對爐壁的輻射傳熱量和爐管的傳熱量等。
  19. Dynamic optimization of ventilation system for construction of a group of underground powerhouse caverns in xiaowan hydropower project

    小灣地下廠房洞室群施工通風的動態優化
  20. Characters of ventilation in this situation are studied and ventilation plans and standards are put forward. these measurements, combined with reasonable ventilation design, provide a good construction environment for the project. the ways to minimize the negative effects caused by geology disasters such as rock - bursting, faults, pile solid at opening are discussed in the paper

    本文就大型機械作業的條件下,論證了該隧道的特點,提出了保障環境的方案與控制標準,經過比較確定了施工通風方式,並進行了施工通風設計,經過對效果檢測,達到了預期的標準,為快速提供了良好的環境。
分享友人