施工標樁 的英文怎麼說

中文拼音 [shīgōngbiāozhuāng]
施工標樁 英文
construction stake
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • 施工 : be in the process of construction; be under construction; build; construction
  1. The rule of loads and settlement is concluded from numbers of settlement observation points ’ data. and in actual construction, this rule could be used to prevent immediate settlement under the accelerated load, and also, the serious result of the soil destruction could be avoided. at last, a proper method of settlement computing is derived from the identified rules, which can be used to guide the practical construction work, of course, meeting the compulsory standards of the settlement control well

    採用逆作法,現實地解決了、土與筏板接觸面的變形協調關系;通過對、土受荷過程的實際測試,得出了、土分擔荷載比例和變化過程,從而為、土的荷載計算提供實際依據;從設置的大量沉降觀測點中所得到的沉降資料,得出荷載、沉降變化規律,從而指導在實際中,防止加載過快而導致速沉,避免由此帶來的土體破壞的嚴重後果;通過沉降規律分析,得出了適用於軟土地區的基沉降計算方法,用於指導實際,以滿足沉降控制的強制性準。
  2. The primary purpose of this paper is that gives a particular explanation of the work principle and construction technique for the dynamic consolidation method and ddm. it also provides the evaluating schemes for foundation consolidation. so we can get some useful methods for foundation consolidation in civil engineering

    文章的最終研究目是詳細說明強夯法和深層攪拌加固技術的作機理及藝方法,並提出相應的地基加固評價選用方法,從而為程建設中進行地基處理提供方法和依據。
  3. Abstract : the paper is based on the working particle for sever al bridges in the construction of w8 section of sheng - yan railway project. it sy stematicaly instructs the construction method of bore - hole filling pile in the rock area with under - earth mined - out layer

    文摘:筆者以神延鐵路w8段多座橋梁程實踐為基礎,系統介紹了有地下采空層的巖石地區鉆孔灌注的方法
  4. A good many case of approaching excavation are studied in this article, such as the study of infection of be coal mining to the huayingshan tunnel, technology study of strucked tunnels of metro in shenzhen, countermeasure study of tunnel approaching pile foundation of metro in guangzhou, excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing, etc. on the basic of analysing and concluding relative study production all over the the world by the numbers, classification of approaching excavation, partition of approach zone, formula of partition of approaching zone, approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward. general methods studying and trea

    本文結合作者多年來對華鎣山隧道減少壓煤量研究、深圳地鐵重疊隧道第11頁西南交通大學博士研究主學位論文技術研究、廣州地鐵公紀區間廣紡聯段鄰對策研究和重慶輕軌大坪大斷面車站鄰近基礎淺埋暗挖法優化分析等諸多近接問題案例的研究,在系統分析和歸納總結國內外相關研究成果的基礎上,系統地提出了廣義的地下程近接的分類、分區、分區指表達式、近接度與對策等級概念以及分區、分度準則,給出了研究和解決近接問題的普遍方法,如數值分析先行,模型試驗、現場測試驗證等。
  5. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋鉆孔灌注中,在不同地質條件下,水上鉆機平臺的搭設、成孔設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜巖面上鉆孔嵌巖面上鉆孔孔底高問題作了探討
  6. On the assumption that swc piling works will be carried out by drilling rigs mounted on barges with suitable mitigation such as silt curtains, the construction of the bridge will not cause any non - compliance with water quality objectives for deep bay ; and

    假設深港西部通道的打程將以裝于躉船的挖鉆機進行,並輔以適當的緩解措,如設置淤泥網,興建大橋將不會導致水質不符合后海灣水質指的情況;及
  7. It is stated clearly by researching, the cast - in - place pile must be constructed according to strict technological process on condition that pebble geological structure, and more important that the drilling technology and the reasonable property index of mud are chose correctly on the basis of the condition of pebble geological structure

    研究表明,江漢平原地區卵石地基條件下,鉆孔灌注必須要按嚴格的藝流程,最重要的是根據卵石地基的地質情況,正確選擇鉆孔藝和合理的泥漿性能指
  8. According to the fact that the penetrate mechanism of static sounding penetration and static jacking pile is similar, we obtained the predict formula of the static jacked resistance of the precast piles after comparing several engineerings, and can use it in the construction of the precast piles

    本文主要依據靜力壓與靜力觸探貫入相似的機理提出用靜力觸探指預估壓阻力的計算公式,並用杭州粉砂土地區的幾個程實例作分析和驗證,為靜壓的設計和提供了理論依據。
  9. On the basis of construction technique of large diameter bored hollow pile of prestressing force concrete, through the program of marc, this paper analyses the pile vertical bearing capacity under different lengths, diameters and strength parameters of mediators as well as the inner force and displacement under lateral and combined loads, giving the criterion of rigid pile and flexible pile. with elastic theory, the paper establishes the inner force calculating formula under eccentric load. this research findings will set a firm theoretical foundation for its widely application

    本文在對大直徑鉆埋預應力混凝土空心藝分析研究的基礎上,運用marc軟體,對豎向荷載作用下不同長、徑及周介質強度參數時空心的承載力性狀,以及水平向荷載及其組合荷載作用下空心的內力、位移變化規律進行了模擬分析,提出了大直徑鉆埋預應力混凝土空心的剛性與柔性界定準。
  10. Based on the data of vertical and horizontal displacements from a certain construction site in cixi city of zhejiang province, the validity of controlling earth - extrusion effects in saturated soft clay ground caused by statically piling was quantitatively analyzed and compared with different technical measures, including reduction of piling rate and installation of stress - relax holes

    摘要根據在浙江省慈溪市某靜壓法沈現場所監測的地基土位移數據,定量分析比較了控制進度、設置應力釋放和排水深孔等程技術措對減輕飽和軟粘土地基沈擠土效應的有效性,並初步提出了現場地基土位移及其變化速率的監控準。
  11. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內試驗及原位測試指進行理論計算與現場實測值的對比,筆者引入了藝修正系數k _ ( c1 )和k _ ( c2 )及深度修正系數,使理論計算值與現場實測值具有良好的一致性,進而通過變形協調理論對荷載?沉降曲線進行數值計算,並用不同藝的實例說明了理論計算荷載?沉降曲線與實測荷載?沉降曲線的擬合效果,從而達到可在不做靜載荷試驗或少做靜載荷試驗的情況下通過剪切波速和靜力觸探試驗指以及藝修正系數等預測黃土地基中鉆孔灌注承載性狀,這對于程初步設計中減少設計的盲目性具有十分重要的現實意義。
  12. Taking a certain reinforcing engineering of soft soil foundation as the example, this paper introduces the principles of the pile - forming of the soil cement milling pile, analyzes on some control targets in the optimum design of the soil cement milling pile, expounds the advantages and applicability of the soil cement milling pile, and advances some matters needing attention in the construction

    以某軟土地基加固程為例,介紹了水泥土攪拌的成原理,分析了水泥土攪拌優化設計中的幾個控制指,闡述了水泥土攪拌的優點和適用范圍,並提出了中應注意的事項。
分享友人