施工設計洪水 的英文怎麼說

中文拼音 [shīgōngshèhóngshuǐ]
施工設計洪水 英文
design flood for construction period
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  • 洪水 : waterflood; deluge; flood; flowage; torrent; spate; flood water; [義大利] acqua alta洪水泛濫 floo...
  1. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了導流建築物的等級、布置。通過力學算、結構、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝利樞紐程採用圍堰擋汛后時段導流方案的合理性和經濟性,為決策提供理論依據。
  2. By analyzing risk sources and those uncertain factors affecting the risk, the diversion risk is defined as the probability of the maximum discharge after being adjusted and held higher than the maximum design flood

    通過對導流風險來源和引起導流風險的各種不確定性因素的論述和分析,把導流風險定義為天然來(經過調蓄后,導流泄建築物的最大泄流量超過其最大泄能力的概率。
  3. When the water situation of any river or lake approaches the guaranteed water level or the safety flow capacity, or when the water level of any reservoir approaches the level of design flood, or when a great danger occurs to flood control works, the flood control headquarters under the relevant people ' s government at or above the county level may declare an emergency flood season

    當江河、湖泊的情接近保證位或者安全流量,位接近位,或者防發生重大險情時,有關縣級以上人民政府防汛指揮機構可以宣布進入緊急防汛期。
  4. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    初步研究認為,在標準選擇時,應處理好安全、經濟和風險相互之間的關系,以達到三者有機的統一;在梯級開發河流上應實控制到管理的觀念轉移;高壩大庫程的初期、中期、後期三個時段的標準應根據庫容等指標逐步抬高。
  5. Twenty schemes are now in operation, and five more schemes ( at chuk yuen and ha san wai, ma tin, shui pin wai, wang chau, and mai po lo wai and mai po san tsuen ) are under construction. another two schemes, at shui pin tsuen and tai kiu, are at the detailed design stage

    目前,正在運作的鄉村防劃共有20個;在竹園及下新圍、馬田、邊圍、橫洲和米埔老圍及米埔新村的另外五個防程正在,另有兩個於邊村及大橋的防劃正在詳細中。
  6. Design and construction of hydraulic tunnel of hongjiadu hydropower station

    家渡電站隧洞
  7. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽電站泄閘預應力閘墩這一程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力錨索的點位加錨索預張拉力,考慮了可能發生的多種荷載況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的具有一定的指導和參考價值。
  8. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低頭,大單寬流量,低佛氏數特點的低壩樞紐泄消能開辟了一條新途徑,可供有關低壩樞紐與試驗作者借鑒與參考
  9. To prevent flood, adopting non - project measures is feasible and efficient marching measures in recent years in most of counties, adequately utilizing modern science and technology such as computer, information processing, net and communication, system emulation, artificial intelligence and so on to build system that can automatically survey and forecast water information, now plays a important role in grasping the information of rainfall, water and project, in making and selecting preliminary draft of flood control and dispatch, which can greatly raises the efficiency and flexibility of flood control, and has important realistic significance and social economic benefits in minimizing flood disaster

    充分利用現代科學技術,如算機、信息處理、網路和通訊、系統模擬、人智慧等技術,建立情自動測報系統,對雨、情的掌握,防調度預案的制定、選擇和實都有重要的使用價值,可以大大提高防程措的防效能和防汛調度的靈活性,對減少災害具有重要的現實意義和社會經濟效益。鬱江預報與調度系統內容豐富,主要有: 1 、系統; 2 、系統預報模型; 3 、系統實時校正模型; 4 、系統河道演進模型; 5 、系統庫調度模型。
  10. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底利樞紐復雜的文、地質條件以及龐大的程規模.該樞紐有3條排沙洞,擔負著泄、排沙、調節徑流和保證進口不被泥沙淤堵的任務.根據排沙洞的庫運用要求,灌漿帷幕下游排沙洞洞身段為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌程,在國內尚屬首例
  11. Design and construction of deep foundation pit for flood drainage channel of tieguang reservoir

    鐵崗庫排程深基坑
  12. The design of the downstream water supply during the construction of yunlong reservoir is presented, in which the problem from the downstream water supply during the construction period of the flood discharge tunnel, the main dam, the initial impoundment of the reservoir and the locking - up of the diversion tunnel is solved satisfactorily with simple construction method, and then the water supply is guaranteed with better social and economic benefit

    摘要著重介紹雲龍期下游供,根據程特點,較好地解決泄導流隧洞期、大壩期、庫蓄、導流隧洞封堵期等下游供問題,方法簡單,確保了下游供,取得了較好的社會和經濟效益。
  13. Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    文摘:結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低頭,大單寬流量,低佛氏數特點的低壩樞紐泄消能開辟了一條新途徑,可供有關低壩樞紐與試驗作者借鑒與參考
分享友人