施工起重機 的英文怎麼說

中文拼音 [shīgōngzhòng]
施工起重機 英文
co truction hoist
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 起Ⅰ動詞1 (站起; 坐起) rise; get up; stand up 2 (取出; 取走) draw out; remove; extract; pull 3...
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : machineengine
  • 施工 : be in the process of construction; be under construction; build; construction
  • 起重機 : crane; derrick; crab; freight elevator; hoist; lifter; cranage; hoister
  • 起重 : jack up起重臂 jib loading boom; cargo boom; erector arm; jibboom; 起重車 carriage hoist; crane ca...
  1. Brief description of the luffing cable - crane used for the construction of yangtze three gorges project

    三峽用擺塔式纜索簡介
  2. Circuitry construction tools produced by our company are more than eight hundred of kinds in 18 series, which are suitable for foundation construction, tower group sets up the pole 、 a thread constructs 、 cable construction, optical cable construction, such as entangle and rub flexibly 、 insulating aerial cable and cable skinning device 、 aluminiam alloy cherishes the pole 、 and lead 、 card thread device of ground wire 、 high strength shackle 、 ratchet wheel board hands with sharp board hands 、 tight line device of double hook 、 lifting block 、 nylon wheel and aluminium wheel is pat the thread coaster, and etc, with full series and more kinds. as high technology and reliable quality, we have a good reputation among sane fields at home and abroad

    公司生產的線路具包括用於基礎,桿塔組立、架線、電纜,光纜序的18大類800餘種產品,如動絞磨、絕緣架空電纜及高壓電纜剝皮器,各類鋁合金抱桿,以及導、地線卡線器、高強度卸扣、棘輪扳手與尖扳手、雙鉤緊線器、滑車、尼龍輪或鋁輪放線滑車等,系列全、品種多,產品具有藝精湛,質量可靠等特點,在國內外同行業中有較高的信譽。
  3. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞理、承載力特性,進行了富有成果的現場測試作;試驗數據表明樁側摩阻和支盤端阻要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  4. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮吊,完成了水上運輸、水上等作業,如鋼管樁的運輸、插打、水上平臺的搭設、鉆吊車的水上轉移、承臺吊箱的吊、鋼管樁的拔除等作業。
  5. The total area of the corporation covers about 200 chinese acres and the length of coastline is about 1, 140 meters, the auxiliary facilities have taken shape the main facility and the equipment include the 30, 000 dwt dry dock which is 192 meters long by 40 meters wide the gate width 32 meters and 10 meters deep, is to date the biggest dry dock in fujian province ; one fitting wharf length 65 meters, width 17 meters ; 16 tons portal crane 1 set, 16 tons gantry crane 1 set, mobile cranes 50t1 25t1 12t2 8t4 and other necessary transportation, coatings, the precision work equipment supplying air 120 m min, spraying grit more than 4, 000 m day, renews the steel plate 12 15 t day we can finish repairing all kinds of ships under 40, 000 dwt within 7 to 10 days our corporation obtains the first - class dockyard to repair and build steel - made ships lisence in 2001, passed the national environmental protection appraisal in august 2002, was designated shipbuilding in fujian for maintaining foreign ships in octobet 2002, the dry dock, passage channel, the turning area, fitting wharf are passed by passage safety appraisal in march, 2003

    主要設和設備有: 3萬噸級干船塢一座長192米寬40米塢門凈寬32米深10米是福建省目前最大的干船塢舾裝碼頭一座長65米寬17米16噸門座1臺10噸門吊1臺汽車吊8臺50噸1臺25噸1臺12噸2臺8噸4臺以及與其相配套的運輸噴塗精加設備。每分種供氣120立方米,日噴砂面積4000多平方米,日換鋼板15 20噸。一般修船期為7 10天。
  6. Design optimization and application of large span cable crane

    大跨度纜索的設計優化與應用
  7. Using crane to hoist and construct bridge is characteristic of simple in constructional machines, easy in operation, low in cost, short in construction time, safety and good quality

    摘要採用吊裝預制梁,具有具簡單、易於操作、成本低、期短、質量安全易於保證等優點。
  8. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大跨度鋼桁架胎架整體滑移中的吊裝具的選擇與布置、平面布置、桁架結構拼裝單元及滑移單元劃分、滑移方案及藝流程、桁架的連接、拼裝運輸、及堆放、滑移軌道布置、滑移滾輪構造、延伸平臺布置以及滑移牽引系統等諸多藝問題。
  9. Improvements such as upgrading the sailing information display system, replacing the baggage handling cranes and refurbishing public toilet facilities are being made to the terminals

    兩個客運碼頭現正進行改善程,包括改進航班資料顯示系統、更換行李卸吊,以及翻新公廁設
  10. It also has the real estate construction general contracting grade b qualification, machinery equipment installation project specialized contracting grade 1 qualification, crane equipment installation project t specialized contracting grade a qualification, steel structure project specialized contracting grade b qualification, electric power debugging second class certificate, first - class metal lab, civil engineering lab and welding training center and china imports & exports enterprise qualification certificate

    同時具有房屋建築總承包貳級、電設備安裝程專業承包一級、設備安裝程專業承包一級、鋼結構程專業承包二級、電力程調試乙級、一級金屬試驗室、一級土建試驗室、一級焊考核培訓中心和中國進出口企業資格證。
  11. Through improving and optimization the existing type, design a construction hoist that have big lift capacity, high lift height and good comprehensive operational perform, which type use the steel wire. its rate lift capacity is 4 tons, lift height is 100 meters. it is say about the overall performance, the applied prospect of this construction hoists would be well

    本課題所設計的新型升降是在現有型的基礎上通過優化和改進設計出的一臺量大、提升高度高、綜合使用性能好的升降,其提升形式採用鋼絲繩式,額定量為4噸,提升高度為100米,綜合性能上遠優于原有產品。
  12. Secondly, the producing mechanism of crack in reinforced structure and factors which affect crack have been discussed, in the emphasis, the method is expounded, which applies first releasing then resisting, combination of releasing and resisting. in the method, flexible slit is applied firstly, which can make deformation of structure distributed, and decrease deformation energy, then the tiny expansion concrete and prestressed concrete with unbonded tendons are applied. and in the different phase, the compressive prestress is put on the concrete structure

    其次,分析並論述了鋼筋混凝土結構裂縫產生的理和影響因素,著闡述了「利用先放后抗,抗放結合,綜合控制」的方法:即首先利用后澆帶,使混凝土結構分段變形,減小超長變形的影響;並採用微膨脹混凝土技術及無粘結預應力混凝土技術,分階段對混凝土結構加一定的預壓應力,從而減小或完全抵消混凝土結構因混凝土硬化收縮引的拉應力;再結合一些其他措,成功實現鋼筋混凝土結構的超長無縫設計與
  13. Reinforced concrete and prestressed concrete craneways ; design and construction

    加筋混凝土和預應力混凝土軌道.設計和
  14. Part three describes the successful application of technical innovation strategy to each period of 15000 oxygenerator engineering management including design, erection and operation / maintenance. some of the technical innovations had been put into effect, which all have solved the actual vital problems of 15000 oxygenerator engineering. some of them even can avoid serious problem from happening a second time, which not only have shortened the time - limit of erection and commissioning, but also played an important role in ensuring the smooth and safely operation of 15000 oxygenerator

    第三部分論述了科技創新戰略在安陽鋼鐵公司15000制氧程管理的設計階段、安裝階段和運行維護階段的成功應用,許多科技創新,都已經付諸實踐,都是有針對性地解決了安鋼15000制氧程中的大的實際問題,許多創新還可以避免一些大問題的再次發生,不但縮短了安裝和調試期並都已在確保安鋼公司15000制氧安全穩定運行方面到了要作用。
  15. Specification for construction quality checkout and evaluation of electric equipment installation part 14 : crane

    電氣裝置安裝程質量檢驗及評定規程第14部分:電氣裝置質量檢驗
  16. To conduct engineering by putting any part of lifting machinery into the overhead power line protection zones

    (二)械的任何部位進入架空電力線路保護區進行
  17. Transmission supermarket lies in 82 xinhua road, hankou district, wuhan, our main products are transmission equipments in common use : line needle wheel decelerating machine, chemical mixing complete set decelerating machine, worm wheel and worm gear decelerating machine, gear decelerating machine and various fittings, electrodeless variable - speed motor, speed - adjust electrical machinery, and anti - blast electrical machinery, and there are a large number of stock, whichis operated in supermarket model. show centre lies in room b1106, xingcheng mansion, interest of which controlled by zhejiang jie brand. zhejiang jie brand wuhan show sales centre is totally responsible for the service work of before - selling, selling, and after - selling in hubei area, and its main products include : high - accuracy gear wheel decelerating machine jrtsk jrts jrtf jrtk series, jrst series aluminiumalloy muti - setting worm decelerating machine, scd series construction lift, jie brand qtz series tower crane, qbt intelligence tower jack - up cloth dual - purpose machine and so on

    傳動超市位於漢口新華路82號,主要營銷:系列擺線針輪減速,化攪拌全套減速,蝸輪蝸桿減速,輪減速及各種配件,無極變速,調速電,防爆電等通用傳動設備,且備有大量現貨,以超市模式經營展示中心位於興城大廈b1106室,為浙江傑牌控股jie傑牌產品武漢展示銷售中心,全權負責jie傑牌產品在湖北地區的售前售中售後的服務作,主要產品有高精度輪減速jrtr jrts jrtf jrtk系列, jrst系列鋁合金多置式蝸桿減速scd系列升降傑牌qtz系列塔式, qbt智能塔式布料兩用等產品。
  18. After the analyzing many existing construction accidents, we get to know that the major injury modes include the falling from high place, machine injury, crane injury, object beating, electric shock and collapse

    本文主要採用的是事故樹分析方法。通過分析大量以往建築安全事故,得出高層建築的主要傷害類型:高處墜落、械傷害、傷害、物體打擊、觸電、坍塌。
  19. Tower crane originated from western europe. it is indispensable in modern construction, and it is the primary special heavy equipment in all of construction machines

    塔式簡稱塔,亦稱塔吊,源於西歐,是現代建築中不可缺少的吊裝械,是所有建築械中的主要特種設備。
  20. 3 days prior before any heavy ( 75 % of the max. allowed working load ), duel, or long radius lift or a lift in close proximity to power lines a detailed job safety analysis ( jsa ) must be submitted to the construction manager or his nominee

    在進行物(最大提升負荷的75 % ) 、採用2臺同時進行提升,或在距離貨物較遠,或距離動力線較近的地方進行提升時,必須提前3天向現場經理或其指定人遞交一份詳細作業安全分析報告。
分享友人