水下滑塌 的英文怎麼說

中文拼音 [shuǐxià]
水下滑塌 英文
subaqueous slump
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : Ⅰ形容詞1 (光滑; 滑溜) slippery; smooth 2 (油滑; 狡詐) cunning; crafty; slippery Ⅱ動詞(貼著物...
  1. The results show that : 1 ) though the water environment of nanyisan is more muddy than others, algal can still grow ; 2 ) the composition and rock type of the algal limestone are complex, the main rock types include lettuce - like stromatolites, algal reef, digitate stromatolies, wave - like stromatolites and so on ; 3 ) the deposits of algal limestones were formed in low - energy peritidal to subtidal high - energy environment of lakeshore slopes, sliding under the action of gravity and some other factors and become slump mixosedimentite layers ; 4 ) the physical property of algal limestones layers is better than others ; 5 ) the genetic development of the sediment decides that the single deposit is small, distributive and thin - layed

    結果表明,南翼山藻灰巖沉積體環境相對渾濁,但藻類仍能生長;該區藻灰巖巖石組成及類型復雜,主要的藻灰巖巖石類型有包心菜狀疊層石、藻礁、指狀疊層石、平波狀疊層石等;其主要為濱岸斜坡上低能潮上環境至高能潮環境形成的沉積體,在重力等因素的作用產生動或形成的微生物成因的混積巖;巖層物性好於其它巖層;藻灰巖層的成因決定了該地區單個沉積體規模小、分散、層薄。
  2. On the east terrace - fault slope of the depression, the sedimentary mode of fan - shaped delta - slump turbid fan - deep lake facies are developed. on the long axial direction of fula depression, the southeastern groove was filled with a large scale delta which was the main sources, the other little delta limited by the 3 syndepositional fault was distributed down the slope edge of the northern sub - depression. this stage developed a favorable oil sources, reservoir and regional seal which formed the good matching relations of generation, reservoir and seal in the time - space zone

    Abugarbra組的sc和sd層序發育在邊界斷層和同沉積斷層活動劇烈、湖盆擴張期,凹陷中心發育半深湖-深湖相沉積,在凹陷陡坡發育近岸扇,斷階緩坡帶發育扇三角洲?濁積扇?深湖相組合,長軸凹槽和北部次凹的北部緩坡帶發育三角洲體系,此層位是有利生油層和巖性圈閉發育層段。
  3. The research suggests that the failure process of the multi - ribbed composite walls under horizontal seismic loads is : the cracks of the infilled silicate bricks and the cracks of the inner rib beams and rib columns - the cracks of the outer frames ; and that the walls can release energy by stages, showing perfect capacities of energy dissipation and collapse resistance

    研究表明:復合墻板在平地震力作用,其破壞過程按「填充砌塊?肋梁肋柱?外框架」的順序進行,分級釋放能量;試驗中墻板大部分發生剪切移破壞;墻板的平均抗剪承載力、延性指標、耗能及抗倒能力明顯優于組合磚墻。
  4. The types of sedimentary facies were mainly fan - shaped delta, delta, binshore subaqueous fans, slump turbid fan, lake facies, fluvial facies

    該研究區主要發育扇三角洲、三角洲、近岸扇、濁積扇、湖相和河流相沉積。
  5. The most favourable sequences for subtle traps are cycle 3 and cycle 4, and the most favourable oil and gas - pool forming regions are jishan sandstone, fan - delta sandstone of south part of linnan sag, sliding turbidity sandstone of the slope part of shuangfen delta front and turbidity and sub - fan near fault of jiangjia dian

    基山砂體、臨南窪陷南部沙三扇三角洲砂體、雙豐三角洲前緣的斜坡地帶的濁積巖砂體和江家店地區的濁積扇體和近岸扇體是最有利的勘探目標區。
  6. ( 三 ) under the dynamic load of the explosion, the numeric analysis has been done and achieve the rule as follow : ( 1 ) when the frequency of vibration is 0. 3hz, the acceleration of the slopes top gets the maximum ; so 0. 3hz is believed the natural frequency of the slope as a whole ; ( 2 ) the vibration of explosion can been magnified because of the condition of the landform, when the relative altitude is up to 45m, the acceleration of horizon gets the maximum ; when the relative altitude is up to 100m, the absolute value of acceleration and the deformation of horizon is larger than that in the bottom of the slope ; ( 3 ) in the period of forced vibration, at the top of the slope, the acceleration of horizon become larger and larger ; at the middle part of the slope, it becomes smaller ; ( 4 ) when the explosion velocity of is much little, the shallow part destruction is the primary deformation of the slope

    (三)採用模態疊加法針對爆破動力作用,進行邊坡的動力響應分析,得出了以結論: ( 1 )振動頻率為0 . 3hz時,坡面頂部平向加速度峰值最大;綜合考慮,可認為該邊坡的自振頻率為0 . 3hz左右; ( 2 )地形對爆破地振動存在放大作用,研究剖面的坡面,平向加速度及位移在地形相對高差45米左右最大,而後隨相對高差的增高而減小,相對高差為100米時,平向位移及加速度絕對值均大於坡腳; ( 3 )強迫振動段,平向加速度值隨時間變化的規律為:坡頂節點總的變化趨勢是越來越大,而坡體中部節點的變化趨勢是越來越小; ( 4 )當爆破振速較小時,變形破壞的形式表現為坡頂表面型。
  7. The results demonstrate that the method mentioned in this paper is correct, reliable and rational. on the basis of the conclusions, the reinforcing structure ' s internal forces of 2 landslide body of hongjiadu hydraulic power plant are analyzed with this method and the service behavior of the joint structures of anchor caverns and piles in the 2 # landslide body is studied. at the same time, the

    在此基礎上,文中用該方法對洪家渡電站2 #體的加固結構進行了內力分析,研究了洞樁聯合結構在洪家渡電站2 #體加固中的工作性態,計算了每個抗樁和錨固洞樁承受的力,為實際工程加固設計提供了合理、可靠的依據。
  8. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對坡進行治理; ( 4 )根據坡推力計算結果和本坡屬牽引式坡的特點,坡體上部相對較穩定,中部處于基本穩定或不穩定狀態,因此建議此坡治理採用上部削坡減載與錨拉抗樁、擋墻進行支擋結合的處理方法,同時結合截排等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和底界層及分佈特點和分析,將本工程危巖體失穩崩的方式歸納為墜落式、傾倒式和式三種類型並分別提出相應的穩定性計算方法; ( 6 )分別對本工程中的危巖體進行了穩定性計算,並且發現其都處于不穩定狀態,因此根據實際情況分別提出相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核計算,滿足要求。
  9. On the basis of these conclusions, the stability of natural 2 # landslide body of hongjiadu hydraulic power plant is analyzed with this finite element iteration method and the uniform value off on the sliding surface of the landslide body is inversed. meanwhile, the stability of scaled 2 # landslide body of hongjiadu hydraulic power plant is analyzed and downslide force of scaled 2 # landslide body and normal stress and shear stress on the sliding surface are obtained. in addition, the results provide a reference for reinforcing structure ' s layout

    在此基礎上,文中用該方法對天然狀態的洪家渡電站2 #體進行了穩定分析,反演了動面上均化的f值,對部分削坡后的洪家渡電站2 #體進行了穩定分析,獲得了部分削坡后體的力和動面上的正、剪應力分佈,為加固結構布置提供了依據。
  10. ( 4 ) a veries of depositional system of early cretaceous have been identified firstly : basin floor fan, slope fan, leveed channel, subparallel facies, slump facies, lowstand wedge, tst, hst. combining with seismic reflection and log response, this paper discusses distribution of above facies, microfacies and reservoir characteristics

    ( 4 )首次確定了白堊統的各種沉積體系:盆底扇、斜坡扇、有堤道、亞平行相、相、低位楔、 tst 、 hst ,結合地震反射和測井響應,討論了它們的分佈,微相和儲層特徵,對今後勘探開發上作無疑有重要價值。
  11. Hongjiadu hydraulic power plant is the only leading water storage reservoir of wujiang cascade hydraulic stations, which is a full - time storage reservoir. 2 * landslide body is distributed at the right side of downstream, which is just located in the region of energy dissipation. erosion gully may cut the bottom of the landslide body. there are roads on the top of the landslide body during the construction period and operating period

    洪家渡電站是烏江梯級電站中唯一具有多年調節性能的「龍頭」庫, 2 #體分佈於壩址游右岸,恰好位於泄洪消能防沖區內,沖坑將部切腳,而且施工期和運行期在其上都布置有公路,因此2 #體失穩將影響整個電站的正常運行。
分享友人