混凝土下水道 的英文怎麼說

中文拼音 [húnníngxiàshuǐdào]
混凝土下水道 英文
concrete sewer
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Widely employed in coal mine, downhole coal bunker, coal washery, cement factory, foundary, thermal power plant, sintering plant coal gas factory, fertilizer plant, chemicals plant, aluminium plant, alkali factory, steel works, coking plant, pharmaceutical factory, mine, dock, foodstuff, and feedings process works, concrete process, etc. with bunker, hopper, transmitting pipeline and drawshaft

    廣泛用於煤礦、及井煤倉、洗煤廠、泥廠、鑄造廠、火力發電廠、燒結廠、煤氣廠、化肥廠、化工廠、鋁廠、制堿廠、鋼鐵廠、焦化廠、制藥廠、礦山、碼頭、糧食、飼料加工廠、加工廠等擁有料倉、料斗、輸送管和礦山溜井的廠礦企業。
  2. To comply with monitor and inspection of the quarterly, half yearly, and yearly inspection and remedy of rooftop, roof space, deck, ground, basement, down pipe, sanitary pipe, air vent, cement & concrete, structural, foundation, beams, ironmongery and all related

    對屋頂,地板,地室,,排管,排氣口,泥和,地基等相關的結構設備進行每季度,每半年,每年的檢查和修理。
  3. In 1928, a concrete slipway was built for seaplanes using kowloon bay

    一九二八年,一條建成,供在九龍灣升降的上飛機使用。
  4. Class 1 - residential / light commercial snow melt : recommended for residential and light commercial walkways, driveways, entrances, and other light traffic ways, ramps and building entries

    冰雪融化系統實際上可安裝在任何地方,如停車場、車、裝卸區、橋梁、人行、戶外階梯、檐槽、屋面天溝、屋頂、,大約地表5厘米中。
  5. The riveting and welding plant of the company has a very strong technical force, the technical personnel makes up more than 1 3 of the total staff, the company can also undertake the manufacture of various metallurgical structural equipment, formwork, gang board, oil tank, water tank, pipeline and dust - collecting and environmental protection equipment of various sizes, the company also undertakes the construction of bridge, concrete building as well as underwater and high - altitude operations from omniberaing etc. no matter what sizes and shapes of the forging and casting spare parts including special - shaped parts, we will never refuse you and promise to satisfy you with best quality and finish the task on schedule

    公司鉚焊廠,技術力量十分雄厚,工程技術人員,佔全體員工的三分之一以上,可以承攬加工各種金屬結構設備模板跳板油罐罐管工程各種型號除塵環保設備,再如橋梁鋼筋建築,高空全方位作業等,除些之外,關于鑄造鍛造等工作不論大,中,小型部件,也能做到來而不拒,保證,保質,保量按期完成任務。
  6. Used to component joint water - proof, building distortion seam, construction seam and metal, concrete etc seam water - proof, for example, tunnel, substructure etc underground seam water - proof construction

    適用於裝配式結構構件砌接縫防,建築物變形縫、施工縫用和金屬、等各類預製件的接縫防,例如:隧、人防、基礎工程等地工程的接縫防
  7. Standard specification for nonreinforced concrete sewer, storm drain, and culvert pipe

    無鋼筋混凝土下水道暴雨和涵管的標準規范
  8. Standard specification for nonreinforced concrete sewer, storm drain, and culvert pipe metric

    無鋼筋的混凝土下水道暴雨和涵管標準規范
  9. Standard practice for installation of precast concrete sewer, storm drain, and culvert pipe using standard installations

    使用標準設備安裝預制混凝土下水道暴雨和涵管的標準實施規程
  10. Chemical admixtures have become the indispensable ingredient of modern concrete and gained wide uses in the fields of civil engineering, water conservancy constructions, road and bridge, underground structures, oil well platforms and marine constructions, etc. as the most important kind of chemical admixture, the fabrication and application technology of superplasticizers, to some extend determine the development of production technology of concrete

    外加劑已經成為現代材料的基本組份,正在建築工程、電、路橋梁、地結構、石油鉆井及海工結構等中獲得越來越廣泛的應用。高效減劑是外加劑中最重要的化學外加劑,其生產和應用技術平很大程度上決定著當今材料生產技術和施工應用平。
  11. Concrete for prefabricated sewage units - manufacture, requirements, testing and quality control

    裝置用.生產要求試驗和質量控制
  12. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期石圍堰基礎處理與施工技術;大江截流上石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸系統及力學、高邊坡穩定、襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  13. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期石圍堰基礎處理與施工技術;大江截流上石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸系統及力學、高邊坡穩定、襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  14. Sewage fittings ; technical specifications for delivery for fittings from cast iron, concrete and concrete in connection with cast iron

    管件.鑄鐵管件管件及與鑄鐵相連的
  15. Standard specification for reinforced concrete culvert, storm drain, and sewer pipe

    鋼筋管和物管的標準規范
  16. This paper main discussed the numerical simulative technique of the crack about reinforced concrete. and in this technique, the crack extending in some typical cases about the steel liner - reinforced concrete penstocks of the three gorges hydroelectric station is analyzed

    本文主要探討了三峽電站鋼襯鋼筋壓力管的裂縫數值模擬技術,並用它分析了管在幾種典型工況的裂縫開展情況。
  17. At the same time, the ever - growing population, the resources shortage, and the daunting environmental pollution have made high rises, skyscrapers a trend. more over, concrete structures have become widely demanded in severe environments such as off - - shore petrol platform, cross strait bridge, under sea tunnels, drainage pipes, nuclear waste containers, nuclear reaction shells, poisonous chemical containers etc. all of the above mentioned buildings and structures require the use of cement based materials

    與此同時,在人口增長和資源短缺、環境污染的威脅,建築物越來越向著超高層化、超大跨化方向發展,各種嚴酷環境使用結構也越來越多,如:海上石油平臺、跨海大橋、海底隧、污、核廢料容器、核反應堆外殼、盛裝有害化學物的容器等,如此眾多的建築物和結構都主要採用了材料。
分享友人