運河型水電站 的英文怎麼說

中文拼音 [yùnxíngshuǐdiànzhàn]
運河型水電站 英文
canal system power station
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 運河 : canal
  • 水電站 : [簡] (水力發電站) hydroelectric (power) station; hydropower station水電站自動化 automation of...
  • 水電 : hydroelectricity; hydropower; water and electricity
  1. Based on the characteristics of the daily regulation wave of hydropower stations, the water surface lines in the rising and falling stages are calculated by using an one - dimensional steady flow model and an unsteady flow sediment model

    摘要根據日調節波的特性,用一維恆定流和非恆定流泥沙數學模,分別計算了道漲落過程的面線。
  2. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡超大地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  3. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    文摘:涪江潼南段防洪整治是一項以防洪為主體的綜合性岸整治工程,在平面二維數值模擬計算的基礎上再進行工模試驗,比較分析各防洪整治方案下潼南流條件的變化,及其對上游防洪、道、大橋、、航勢的影響,提出合理可行的工程方案
  4. According to the established model of decomposition - coordination for group hydropower station, the optimal cooperating operation study is utilized to the hydropower stations of shiquan and xihe river. simulative operation of optimal cooperation in series of runoff data measured of 44 years is performed

    根據建立的群優化調度分解協調模,對石泉、喜進行聯合優化調度研究,以44年實測徑流系列資料進行長系列優化調度模擬行。
  5. In this article, the author study the short - term optimization dispatching of cascaded hydropower in order to get a practicable mathematical model and arithmetic. basing on deep analysis and generalization of yilihe cascaded reservoir, the author set up a short - term dispatching mathematical model and an inner - plant economical operation model to simulate the real operation process. dynamic programming method ( dp ) is effective to solve the several problem and discrete differential dp ( dddp ) is a reduce dimension tool

    本文緊密結合雲南省境內的以禮梯級庫的工程實際,在對其進行深入分析和概化的基礎上,建立了反映實際問題特點的梯級短期調度模和廠內經濟行模,動態規劃方法以其擅長求解多階段決策過程問題而被本文選為優化工具,由於dddp的降維效果顯著,從而使動態規劃在本研究模中得以用。
分享友人