full load method 中文意思是什麼

full load method 解釋
全負荷法
  • full : adj 1 充滿的,裝滿的。2 充分的,豐富的;擠滿的;(吃、喝等)盡興的,3 (精神)飽滿的。4 完全的,...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. So the topic for farther discussion will be developed on the ground of soil - foundation - structure interactions, and em phasizes particularly on the investigation for dynamic effects on interaction of pile - supported structures subjected to lateral seismic load at layered - soil media. it will provide engineering application with practical and concise computational method, but also provides the aseismatic design for pile - supported structures with proper theory foundations and schemes to some extent on condition that definite codes are absent at present. the full article is divided into six chapters, as follows : 1

    本論文工作將圍繞地基-基礎-上部結構共同作用這一課題作進一步探討,側重於水平地震作用下層狀地基土中的樁基-建築物的動力相互作用的研究,為實踐應用提供了適合於工程目的的、比較簡捷的實用計算方法,亦擬為沒有明確規范指導的樁(土)基礎-結構抗震設計提供一定的理論依據和設計建議。
  2. Full - range of loading to the reinforced concrete columns with reinforced concrete cover during second stage of loading is analyzed by computer - test nonlinear developed in the text, in consideration of the condition that they are not unloaded or partly unloaded. based on the analysis, a simplified method is put forward in the paper to calculate the load capacity of cross - section of axially and eccentrically compressive rc columns with reinforced concrete cover. a theoretical calculation method is given to the practical engineering

    本文針對實際工程中經常採用的外包鋼筋混凝土加固鋼筋混凝土柱的加固方法,考慮到實際加固工程是在不卸載或部分卸載情況下進行,利用計算機對外包鋼筋混凝土加固柱二次受力后進行非線性全過程分析,在此基礎上提出外包鋼筋混凝土加固柱軸心受壓和偏心受壓正截面承載力的簡化計算公式,為實際工程中外包鋼筋混凝土加固柱的結構設計提供了理論計算方法。
  3. A way to avoiding crack or reducing crack width of concrete or reducing distortion of member is using prestressed concrete. the writer tried to make full use of the merit of the prestressed concrete and designed prestressed concrete mandril to control crack of structure. the prestressed concrete mandril, which was firstly applied high pressure on a small concrete bar, and then was made in concrete, so it would act as reinforced bar and resist load. in this thesis the writer designed 24 mmnbers and had experimental study of them, reached the conclusion that the effect of resisting crack of the prestressed concrete mandril was good when the load was not large, it can enhance the capacity of resisting crack and reduce the crack distance and crack width, but when the loads was large, the effect of resisting crack was not good, when we used the prestressed concrete mandril and reinforced bar together in member, the effect of resisting crack was very good. the writer analysed the adherence mechanism and wreck mechanism of the prestressed concrete mandril in anxial tension members, and according to the character of the prestressed concrete mandril, the writer constructed the bond model of it. then the writer introduced the analysis theory of crack including the bond - slip theory, the non - slip theory, the synthesis theory and mathematics stat method. the different theory had different theory base, they considered that the primary affection of crack width was different. in this test, the crack distance and crack width of members which placed reinforced bar were match to the compute value of the code gb 50010 - 2002 very well. to the members which

    本文共進行了24根試件的試驗研究,得出了預應力混凝土芯棒能較大地提高構件抗裂承載力,在荷載小於預應力混凝土芯棒的開裂荷載時有較好的抗裂效果,能較大地減小裂縫間距和裂縫寬度,但是當荷載較大預應力混凝土芯棒開裂時預應力混凝土芯棒的抗裂效果不是很好,若將普通鋼筋和預應力混凝土芯棒一起使用時則有很好的抗裂效果。本文分析了預應力混凝土芯棒在軸拉試件中的粘結機理和破壞機理,根據預應力混凝土芯棒本身的特點,提出了預應力混凝土芯棒與后澆混凝土之間的粘結模型。然後本文詳細介紹了經典的裂縫分析理論粘結滑移理論、無滑移理論、綜合理論和數理統計方法,各理論有著各自不同的理論基礎,認為影響裂縫寬度的主要影響因素也各不相同。
  4. Based on state - vectors load transfer method, this paper presents a new reliability analysis method of bored pile settlement. in the light of the eight full - scale piles, tests of the uncertainty analysis of pile settlement calculating by the new method is given. at last, this paper also analyzes the reliability of one of the eight piles

    根據樁周阻抗三階段理論,提出了用荷載傳遞計算單樁沉降可靠度的方法,根據8根試樁靜載試驗及其原位測試資料,對該方法計算模式的不定性作了分析,並對其中一根樁的沉降進行了可靠度計算。
  5. As a straightforward method, the full search algorithm ( fs ) is widely used because of its high performance. usually, fs is computationally expensive in a video encoder. as a result, in order to reduce the heavy computational load of fs, active research has focused on fast bmas for a long time and several sub - optimal search algorithms for block - based motion estimation have been developed. these include : three step search ( tss ), four step search ( fss ), two - d logarithmic search, orthogonal search, cross search, etc

    目前塊匹配運動估計演算法有很多,如全搜索法、三步法、共軛方向搜索法、二維對數搜索法、交叉搜索法、鉆石搜索法以及四步搜索法等,它們各有優缺點,全搜索法精度高,但計算量大,三步搜索法和交叉搜索法搜索速度較快,但搜索誤差較大,容易陷入局部最小值。
  6. Base on the kinematics relation of ctp, the corresponding reynolds equation or average reynolds equation, fluid film thickness equation under qusi - stable state in polar coordinates, balance equations of load and moments under full - film contact and partial - film contact states were set up respectively. these model equations were calculated by the finite difference method, and the instantaneous 3 - d distribution of fluid pressure and the slurry film was simulated by the matlab software

    根據ctp的運動關系,分別建立了極坐標下,全膜接觸工況時的非穩態牛頓流體在ctp過程中的一般reynolds方程、流體膜厚方程、載荷平衡方程和轉矩平衡方程,以及部分膜接觸工況下的平均reynolds方程、平均膜厚方程、接觸壓力方程、總載荷平衡方程和總轉矩平衡方程。
  7. The assumption about deformation character and constitutional relationship of high strength concrete and reinforcement under elevated temperature is proposed making use of the general regularity of high strength concrete compression - flexure member. the ultimate load capacity and deformation of high strength concrete compression - flexure members under elevated temperature are analyzed by means of full - range and non - linear analysis method. the computing results and test data are in good agreement

    根據高溫時高強混凝土壓彎構件的一般規律,給出了高溫時高強混凝土和鋼筋變形特徵的假設和本構關系,利用全過程非線性分析方法分析了高溫時高強混凝土壓彎構件的極限承載力和變形,計算結果與試驗結果吻合較好。
  8. Full load method

    全負荷法
分享友人