starting capacity 中文意思是什麼

starting capacity 解釋
起動功率
  • starting : n. 出發;開始;【機械工程】開動,起動;開車。 at starting 最初,開頭。 starting material 原材料。 starting motor 起動電動機。
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. Accurate load forecasting is helpful to planning generators " starting and stopping in the interior of the electrical networks economically and reasonably, preserving the security and stability of power system, reducing the unnecessary circumvolving repertory capacity, making planning to overhaul the units in reason, ensuring the normal production and life of the society, effectively reducing the cost of generating electricity, increasing the economical and social benefit

    電力負荷預測是供電部門的重要工作之一,準確的負荷預測,可以經濟合理地安排電網內部發電機的啟停,保持電網運行的安全穩定性,減少不必要的旋轉儲備容量,合理安排機組檢修計劃,保證社會的正常生產和生活,有效地降低發電成本,提高經濟效益和社會效益。
  2. By starting with the analysis of generator end structure and overheat sources, it is presented that the technical key required to expand the capacity of the unit is to solve the electromagnetic leakage shielding problem. by proceeding with the analysis of the reasons causing the aging of the stator winding bars insulation, the necessity for stator winding bars to adopt class f insulation and relative fixing technological improvement are pointed out so as to extend the service life of the winding bars insulation

    從分析發電機端部結構及過熱原因入手,提出了增容的技術要點在於解決端部漏磁屏蔽問題;從發電機線棒絕緣老化原因分析入手,指出為延長定子線棒絕緣使用壽命,線棒主絕緣採用f級的必要性以及相關工藝的改進。
  3. In view of this situation this article has conducted research to the design of metallurgy auxiliary biography with the frequency conversion table electrical machinery first multianalysis to the frequency changer and the frequency conversion table electrical machinery movement characteristic is carried out, the voltage waveform harmonious which the frequency changer outputs is big, attacks in a big way, and the voltage climbing rate reaches as high as 6600v / mu s which is 20 times ordinary sine alternating voltage, the rolling mill auxiliary biography table set the extremely strict request to the electrical machinery ; its movement frequency is very low, rate frequency in 8 - 20hz ; the velocity modulation scope is wide, the lowest movement frequency lowers to 1hz, and the starting number of times is quite frequently, each hour reaches as high as 600 - 800 time, the impact shoulders in a big way, the overload capacity request is high

    針對這一情況本文對冶金輔傳用變頻輥道電機的設計進行了系統研究。首先對變頻器和變頻輥道電機的運行特性進行詳細分析,變頻器輸出的電壓波形諧波大,沖擊大,電壓上升率高達6600v / s ,是普通正弦交流電壓的20倍;軋機輔傳輥道對電機提出了十分嚴格的要求:其運行頻率很低,額定頻率在8 - 20hz ;調速范圍寬,最低運行頻率低到0 . 5hz ,起動次數相當頻繁,每小時高達600 - 800次,沖擊負荷大,過載能力要求較高。
  4. Static benefits are generated from peaking and valley - filling, which are further divided into capacity benefits and coal saving benefits. dynamic benefits come from its fast starting and flexible operation, including frequency regulation, synchronous condenser operation, fast coverage of steep load gradient and synchronous spinning reserve. as for the calculation of static benefits of pumped storage plant, the alternative coefficient method is normally adopted at present

    目前在抽水蓄能電站的靜態效益計算中,一般採用替代系數法,即用抽水蓄能電站的裝機容量乘以容量替代系數( 1 . 05 1 . 1 )計算抽水蓄能電站的替代容量;用抽水蓄能電站的發電量乘以電量替代系數( 1 . 05 )計算替代電站的發電量,再根據循環效率的大小計算抽水蓄能電站的燃料消耗。
  5. This thesis aims to construct regional strategic theory and targets qianfeng company as the research object, starting from analyzing its external environment and the internal capacity to gain a insight of the main deficiencies and loopholes blocking the development of the enterprises and finding that all reasons direct to its original region orientation. therefore it is judged that the bottleneck of its developmen t is the regional orientation and its dominant strategy is regional strategy instead of industry strategy

    本文試圖構建區位戰略理論,並以位居成都東郊工業區的前鋒集團公司為研究對象,從分析企業外部環境和內部能力著手,分析制約企業發展的主要缺陷和漏洞的成因,發現其成因均指向企業原有的區位定位,得到企業發展的瓶頸是企業原有的區位定位,進而確定前鋒集團公司發展瓶頸的歸屬是區位定位,於是判斷出企業的主導戰略是區位戰略而不是行業戰略。
  6. At present, comprehensive exploitation and construction of kela no. 2 gas field has been initiated, and tarim oil field will continue to expand gas - containing area and gas reserves of kuche - tabei area of tarim basin, increase total verified geological reserves to 1 trillion m3, and finally form an annual production capacity of 30 billion m3 to guarantee stable gas supply for 30 years starting from the next year for the project to transmit gas from china ' s west to east

    目前,克拉二號氣田已投入全面開發建設,塔里木油田還將繼續擴大庫車塔北地區的含氣面積和儲量規模,使總探明地質儲量達到1萬億立方米,最終形成300億立方米的年產能力,確保從明年起向西氣東輸工程穩定供氣30年。
  7. 3. when table sugar was used as starting materials, it was used and pyrolyzed directly or was first mined with sulphuric acid after surface area of those materials is not larger than that of pas capacity is small in their electric double - layer capacitor, specific surface area has great effect on capacity, the larger specific surface area is, the higher capacity is, . but bulk density will decrease with increase of specific surface area

    當以食糖為熱裂解碳的原料時,採用直接焦化和酸洗焦化兩種方式。所制備的樣品比表面積沒有聚並苯材料的大,在以30 h _ 2so _ 4為電解質的雙電層電容器中,容量相對較小。電極活性物質的比表面積對雙電層電容器的容量有很大的影響。
  8. With the principle of technical cooperation and self - innovation, the company implemented technology development strategy of high starting point, high investment and high quality, researched and developed a series of new products with self knowledge property right. the company also owns one stop production capacity from raw materials to finished products ; for example, annual production capacity of diode can reach to 3. 6 billion pieces

    健隆達秉承「品質第一客戶至上」的理念,不斷拓展led產品市,公司主要產品有:全系列發光二極體數碼管時鐘板全系列點矩陣圖元管背光板
  9. To set up the reciprocal direction ' s style to combine the legal administration of the government and the legal autonomy of communities, the starting point is supposed to develop the administrative capacity of community autonomy, and to promote the function of community autonomy, and so is the final conclusion

    建立政府依法行政與社區依法自治相結合的雙向導向型管理模式,其出發點和落腳點都是培育社會自治管理能力,提升社區自治功能。有效的組織是培育社區自治能力和提升社區自治功能的基礎。
  10. To set up a community administration mode to combine the legal administration of the government and the legal autonomy of communities, the starting point is supposed to develop the administrative capacity of community autonomy, and to promote the function of community autonomy, and so is the final conclusion

    建立政府依法行政與社區依法自治相結合的社區治理模式,出發點和落腳點都是要培育社會自治管理能力,提升社區自治功能。有效的組織是培育社區自治能力和提升社區自治功能的基礎。
  11. At 6 : 00 pm the lecture hall started filling up, and by starting time the hall was full to capacity. more than 1200 people sat silently, while the air was filled with the sweet fragrance of flowers and a highly positive vibration. then she appeared - our much - loved supreme master, dressed in light colors, like an innocent spring flower

    晚間六時起,講經大廳開始湧入貴賓,講經開始之前已座無虛席,一千兩百多個人安靜地坐著,空氣中彌漫著各種花香及高等的振動力,接著,她出現了我們摯愛的無上師,一身素雅,彷如一朵純真的春之花。
  12. The effect of oil filler test that is improved is correspondence to the overspeed test, so it is no use to do overspeed test repeatedly. it can reduces the deterioration of the rotor ' s longevity, and that, it can reduce the starting time of the units, which can reduce the cost of fuel consumption and steam deterioration. especially to large capacity steam units that use the same style device, it will get large economic effectiveness

    對使用同一原理的裝置而言,這種新的技術思路具有指導性意義,改進后的注油試驗使用起來的效果可以與超速試驗相對應,不需要重復做超速試驗,可以減少對因超速對轉子的壽命的損耗,並且還縮短了試驗所需要的時間,相應減少機組的啟動耗時,節約燃料成本及汽水損耗,尤其是對使用同類裝置的大容量機組而言,能夠獲得的經濟效益將是巨大的。
  13. Starting a trial work of innovation and increasing innovation capacity in an all - round way

    開展創新試點工作全面提升創新能力
  14. By means of compensation and input in advance, the mechanism of oriented resettlement development is started, with natural resources exploited reasonably, economy developed, and resettlement environment capacity extended, which provides the high - starting - point resettlement with excellent conditions, so that the living level of relocates reaches or exceeds that of them before resettlement as soon as possible

    本研究認為,開發性移民的實質就是在促進庫區生態環境良性演化的前提下,通過超前補償和投入,啟動開發性移民機制,合理地開發與配置資源,發展經濟,擴展移民環境容量,為高起點安置移民創造條件,以使水庫移民盡快達到或超過遷移前的生活水平。
  15. Starting from a case study on the water environment capacity of the three gorges project reservoir, the authors discussed the relevant issues on quantification of pollutant carrying capacity

    本文從三峽水庫庫區水環境容量研究案例出發,對納污能力的定量評價問題進行了討論。
  16. Ac motor starting current is big, but it can bear usually, if it starts unusually, it could produce heating winding and burn. the large capacity motor must use starting equipment

    交流電動機起動電流大。正常起動時,電動機能夠承受,但非正常起動時,會產生繞組過熱而燒毀;通過分析指出較大容量的電動機必須採用起動設備。
  17. Llpa power push button switch is applicable to the motor of the voltage up to 500v and the capacity up to 3kw for directly starting run and breaking, also for infrequently turning on and off loaded current

    Llpa系列控制按鈕開關是可適用於電壓500v和負載量為3kw的發動機直接運轉和阻斷,同時頻率運轉和電流負載。
  18. Using two different finite element models, compress and shear destroyed states, starting crack load and ultimate bearing capacity are obtained

    通過建立兩組不同的砌塊墻體有限元模型,分析了砌塊墻體受壓和受剪的破壞形態、開裂荷載和極限承載力。
  19. On the basis of observation experiment, class teaching in middle - school physics arouses students " learning interests and exploratory passination. the feedback of teaching information is very instant ; whereas the starting - point of class teaching in senior - middle - school physics is a little high and knowledge - capacity in class teaching is large. in class teaching focuses on teachers " teaching and the feedback of teaching information is not instant

    初中物理課堂教學起點適當且容量小、突出教師的主導和學生的主體作用、以觀察實驗為基礎,激發學生的學習興趣和探索熱情、教學信息反饋即時;高中物理課堂教學起點偏高且容量大、以教師講授為主、教學信息未能得到即時反饋。
  20. Starting with the criteria that are set by paris21 for statistical capacity building indicators, this part introduces two categories of indicators : quantitative indicators and qualitative indicators, and subsequently shows the development of those indicators

    從paris21確定統計能力建設指標的標準入手,介紹了統計能力指標的分類,即定量指標和定性指標兩大類,然後介紹了統計能力指標的發展歷程。
分享友人