water-supply scheme 中文意思是什麼

water-supply scheme 解釋
給水方案
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • supply : vt ( plied) 供給;供應;配給;補充,填補,彌補(不足、損失等)。 Cows supply us (with) milk ...
  • scheme : n 1 計劃;方案;路線;設計。2 系統;配合;組織。3 綱目;表;清單;分類表;大綱。4 謀劃,策劃;詭...
  1. As the valley was situated in a high area, the water supply scheme utilised gravity flow. however, the reservoir had a small capacity of just 27 million gallons, only 38 % the size of its pokfulam counterpart

    由於峽谷位處高地,供水方法仍可以利用水向低流的原理,讓水塘存水順勢流往山下區域,省去興建抽水站的工程。
  2. Dongshen - hong kong water supply scheme to channel dongjiang water to flow southward to shenzhen requires to convert one of the tributaries flowing north to dongjiang - the shima river - into an artificial canal by pumping of water from the shima river from its lower course to its upper course

    東深供水工程,引東江水南流至深圳市,需將其中一條原本由南向北流入東江的支流石馬河變成一條人工運河,河水由下游抽回上游,逆流而上,工程因而相當艱巨。
  3. The tai po water treatment works together with the butterfly valley primary service reservoir in kowloon and the 12km long treated water aqueduct connecting the two waterworks form the tai po water scheme. this is one of the biggest water supply projects that the water supplies department ( wsd ) has undertaken in recent years

    大埔濾水廠連同九龍的蝴蝶穀食水主配水庫,以及連接濾水廠和配水庫的十二公里長食水輸水管道,組成大埔濾水廠供水計劃,是水務署近年來進行的其中一項最龐大的供水工程計劃。
  4. Other types of cooling systems include : fresh water cooling towers, air - cooled system, water - cooled air conditioning system centralized piped supply system for condenser cooling, centralised piped supply system for cooling towers and district cooling scheme

    -其他種類的冷卻系統包括:淡水冷卻塔氣冷式系統水冷式系統集中式管道供應冷凝器冷卻水系統集中式管道供應冷卻塔用水系統及區域性冷卻系統。
  5. To this area precipitation materials for many years, evaporate materials, surface flow materials, hydrometeorological materials, hydrogeological materials carry on exhaustive analysis, have analysed the state of water resource of the sand district, proceed from the heat of the earth ' s surface is balanced, water yield balanced basic theories, combine the amount of regional water resource set up of the materials, such as scene, hydrology, soil of the sand district, etc. and estimate models, have calculated the surface water, groundwater of this area, has carried on models to examine according to the real data, and has predicted to the state of water resource under different climate change scenes of future that analyse. have put forward the scheme that the water resource in this area utilized rationally, use the non - linear motive force model to predict the precipitation, utilize the materials of actual observation, the natural supply amount of calculating out groundwater of sand ground of balanced principle of the amount of water used at the same time, and can exploiting amount predict to groundwater, district of sand,

    本文以寧夏半乾旱地區鹽池縣沙地水資源為研究對象,對該地區多年降水資料、蒸發資料、徑流資料、水文氣象資料、水文地質資料進行了詳盡的分析,分析了沙區的水資源狀況,從地表熱量平衡、水量平衡的基本理論出發,結合沙區的氣象、水文、土壤等資料建立了區域水資源量估算模型,計算了該地區的地表水、地下水,根據實際資料進行了模型檢驗,並對未來不同氣候變化情景下的水資源狀況進行了預測分析,提出了該地區水資源合理利用的方案,運用非線性動力模型對降水量進行預測,同時利用實際觀測資料,運用水量平衡原理計算出沙地地下水的天然補給量,並對沙區地下水可開采量進行預測。
  6. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運河起自廣東省東莞市橋頭縣,流經司馬、旗嶺、馬灘、塘廈、竹塘、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘壩和八級抽水站。
  7. In addition, 2 inter - connected storage tanks - one in bonham road and one in robinson road - were to be built. this water supply scheme also included the building of 30 small sized fountains and 125 fire hydrants

    草擬計劃包括一個水塘(容量達3 , 000萬加侖) 、一條引水管、儲水池,以及連接儲水池的輸水系統,並設立30個供水點和125個滅火龍頭。
  8. The optimal control plays an important role in water supply systems. much operating cost can be saved through a reasonable control scheme

    給水管網經濟調度在供水系統中作用重大,合理的調度方案可以節約大量的運行費用。
  9. Discuses doas ' demand to fresh air humidity ratio and model by rotary wheel removing moisture load, and analyses its scheme and energy consumption of dons by rotary wheel removing moisture load based on solar energy regeneration, and result shows a 30 % energy saving comparing to cooling dehumidification, and it can supply cooling capacity freely when using directly underground water or cooling tower supplying cooling capacity during transition season periods

    討論了獨立新風系統對新風送風含濕量的要求和除濕轉輪承擔系統濕負荷的方案,分析了基於太陽能再生的轉輪除濕獨立新風系統空氣處理過程及能耗,結果顯示與直接冷卻除濕的獨立新風系統相比節能30 % ,在直接利用地下水供冷或在過渡季節使用冷卻塔供冷的情況下則可以達到免費供冷的目的。
  10. The proposed 800 mm diameter salt water main is a pumping main to deliver sea water from the existing kowloon south no. 2 salt water pumping station to the existing yau ma tei salt water service reservoir. this serves to provide flushing seawater supply to south kowloon areas including the west kowloon cultural district scheme area

    建議的直徑800毫米的鹹水管是泵水干管,作用是把海水由現有的九龍南二號海水抽水站輸送至現有的油麻地海水配水庫,從而為九龍南部地區,包括西九龍文娛藝術區的計劃區,提供沖廁用的鹹水。
  11. The water could also go through tunnel of the plover cove system and arrived at the lower shing mun reservoir and then to the shatin treatment works to supply water for the urban area. the capacity of the dongshen water supply scheme has been uprated three times

    該輸水管自梧桐河泵房經上水、粉嶺抵達大埔頭后,可經過泵房注入大埔頭,至下城門水塘輸水隧道轉沙田濾水廠,供應市區。
  12. Discussion on development strategy and construction scheme of communication network of water supply system in dalian city

    寧波市白溪水庫引水工程輸水隧洞主要工程地質問題研究
  13. This part of the project began in march 1930 and was completed in december 1931. on 15th december 1931 the governor, sir william peel, officiated at the inauguration of the water supply scheme

    上塘於1931年12月峻工,並於1931年12月15日由港督貝璐( sirwilliampeel )主持揭幕儀式。
  14. Analysis of main points of selecting cofferdam removal scheme for chaozhou water supply junction project

    潮州供水樞紐圍堰拆除方案選擇要點淺析
  15. To effectively prevent the environmental deterioration in the downstream of the tarim, emergency water supply scheme was applied during the comprehensive control on the tarim basin

    摘要為有效緩解塔里木河(以下簡稱「塔河」 )下游生態進一步惡化,在塔河流域綜合治理期間實施向塔河下游生態應急輸水任務。
  16. The engineering works were extremely difficult as river flow had to be reversed. the dongshen - hong kong water supply scheme therefore necessitated the up - lifting of water in 8 stages with a total elevation of 46 metres. the water was then fed to the yantan reservoir (

    工程1963年展開,經八級提水,將水位提高46米后,注入雁田水庫,再由庫尾開挖3公里人工渠道,注水至深圳水庫,再由深圳水庫直接供應香港。
  17. In accordance with the practical situation of ben - gang water supply systems, this thesis find out the problem in the operation. the research contents include three aspects which are short - term load forecasting and decision of optimum operation scheme and the renewal of equipment in water supply systems. the firstly discusses the short - term water consumption problem with three models : grey forecasting model, artificial neural network model and modified artificial neural network model, it is very valuable that the modified artificial neural network model

    本文根據本鋼供水系統的實際狀況,找出了本鋼供水系統運行中存在的不足,進而提出了相應的改進措施。主要內容包括供水系統短期負荷預測,確定系統最優調度方案和設備更新與設備投資問題。在預測部分運用灰色預測方法, bp神經網路方法和改進的神經網路方法進行用水量預測,並進行比較分析,重點提出用遺傳演算法進行神經網路權系優化的改進演算法。
  18. The concept of constructing the shing mun water supply scheme was originally formulated in 1923, and it was finally completed in 1939 when the cross - harbour pipeline from the kowloon peninsula to hong kong island was finished

    城門水塘的興建計劃始於1923年,至1939年第三條連接港島的海底輸水管建成為止,共歷時16年。
  19. Guangdong province through the dongshen water supply scheme officially supplied hong kong with river water from dongjiang. the maximum daily quantity could reach 62 mg. the price was $ 1 for 1, 000 gallons or 1 cu. m for 10 cents rmb

    廣東省政府透過東深供水計劃正式向香港供水,每天供水量最高可達6 , 200萬加侖,售價為每1千加侖1
分享友人