塑性巖層 的英文怎麼說

中文拼音 [xìngyáncéng]
塑性巖層 英文
flowing rock formation
  • : 動詞(塑造) model; mould
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  1. The shale beds in between generally deform plastically.

    夾在其中的頁通常是變形。
  2. The mechanisms summarized are as follows 1 ) compressional normal stress ; 2 ) ductile and / or viscous deformation in bedding fault since incompetent bed is susceptible to plastic flow ; 3 ) higher likelihood of clay / shale smearing ; 4 ) foliation fabric whose sealing capacity is enhanced greatly in direction perpendicular to foliation

    其機理可歸納為四個方面: 1 )壓的正應力; 2 )以韌及粘變形為主,因為非能幹流變; 3 )塗抹效應強; 4 )面理化組構,垂直面理方向的封閉能力大大增強。
  3. Based on the regional structure dynamics analysis of the lithosphere imbricate structure in lanping - weixi area, the middle section of three - rivers area ( n26 - 28 ), the bouguer gravity anomaly of deep structures was completed and the fractal of these faults was calculated. the geology structure model and the elasticoplastic three - dimension finite - element mathematic are described, made and calculated ; and physical simulation was accomplished

    針對三江中段n26 - 28蘭坪-維西地區的石圈正交疊加構造的區域構造動力學分析,進行了深部構造的布格重力異常延拓處理和淺部的斷分維計算,描述、製作計算了地質結構模型、彈三維有限元數學模型和物理模擬。
  4. According to roof safety factor of 1. 2 for the mined - out area, minimum safety roof thickness at different rock in various span mined - out area was calculated by flac software, which transfixion of plastic zone was taken as criteria of roof breakage by using strength reduction technology and dichotomy theory

    摘要利用強度折減技術和二分法原理,以區的貫通作為頂板破壞的標準,當采空區頂板的安全系數等於1 . 2時,利用flac軟體計算得出各種跨度空區在不同中的最小安全頂板厚度。
  5. Simulation analysis of elastoplastic fem for stability of bedding rock cutting slope

    體路塹邊坡穩定的彈有限元模擬分析
  6. Its displacement could reduced to 40 percents at vault and 34 percents at floor in the condition of support, especially in the condition of cable support

    在拱頂和底板以張破壞為主,而在拱腰和墻腳以剪切破壞為主。噴對圍破壞的限製作用顯著。
  7. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    公路沿線廣泛分佈有昔格達地,昔格達地能否用作高速公路路基填料,國內沒有先例,本論文就是結合導師的科研項目,在非典期間,現場長達5個月的工作,完成了從試驗、現場施工工藝到路堤分沉降監測等工作,是面對生產實際,認識昔格達地質和其作為地基、路基和填料應用中面臨的問題進行的研究。主要的研究內容有:對攀西地區地、構造等地質環境和昔格達地的沉積歷史過程作了系統的分析,研究表明西攀高速公路主要受安寧河斷裂和昔格達斷裂影響,通過地區地震活動頻繁,差異沉降較大,對公路建設、安全運行和沿線構築物設計有較大影響;由於昔格達地在有些路段作為地基、有些作為路基,對其基本質進行了研究:包括天然密度、含水量、液限、顆粒級配等指標的試驗研究。研究成果表明:昔格達地為湖相沉積,主要為砂和泥,它以細粒組為主,同時粘粒的存在,使其具有一定粘
  8. A finite element numerical model for arch dam - gravity pier - foundation system was established to evaluate the effect of high gravity piers on the stress, deformation and anti - sliding stability of sizhai arch dam, taking the following factors into account, such as the possible elastoplastic deformation of foundation rocks and the nonlinear interaction between the interfaces of gravity pier - dam foundation, the joint surfaces beneath the right bank, and the interfaces of arch dam - gravity pier

    摘要為評價高重力墩對四寨拱壩的應力變形和抗滑安全的影響,建立了拱壩重力墩地基系統的有限元數值模型,其中考慮重力墩基礎、右岸夾和拱壩重力墩等交界面的非線相互作用,以及基材料的彈變形行為。
  9. In this paper, systematic numerical test have been carried out to study the stability of surrounding rock mass with different distribution of weak interbed, different distance between weak interbed and limit of excavation, different thickness of weak interbed, in the different confining coefficient and representational surrounding rock mass graded ii, iii, iv. all of the numerical modeling is plain - strain type with elastic - plastic constitutive law and mohor - coulomb failure criterion, through the integrated numerical analysis program final. plentiful numerical test results have been drawn via analyse the deformation, tensile stress region, plastic region of surrounding rock and the stress status of shot - crete

    大量的工程實踐表明,軟弱夾對地下洞室圍穩定的影響有著決定的作用,本文以大型數值模擬分析系統final為平臺,採用彈應力應變關系和m - c屈服準則建立平面應變問題有限元模型,對軟弱夾的分佈部位、分佈距離、軟弱夾的厚度對圍穩定的影響以及在具有不同側壓力系數的地應力場中和、 、類代表中軟弱夾對圍穩定的影響進行了系統的數值試驗,研究得出了軟弱夾對圍位移、拉應力區、區以及噴射混凝土內力等影響豐富的量化成果,以便直接為工程設計人員提供參考。
  10. In this paper, based on simulation modeling laws of geometry, constitutive relations, stress conditions and construction, a simulative calculation model has been proposed by considering the mechanical problems during the underground tunnel ' s construction and adopting constitutive models of enveloping type which can consider elasto - plastic materials and their cracking. the model can describe rock multi - media characteristic consider the interrelation of shoring structure and stratum reflect some influencing factors, for example : faultage interlayer joints, construction process and so on

    本文結合地下隧洞工程施工過程中的力學問題,基於幾何、本構、應力狀態和施工過程等四方面模擬建模的原則,採用可以考慮材料彈和開裂的包絡型本構模型,建立能描述體多介質的特點和能考慮隧洞支護結構與地的相互作用,同時能反映斷、夾、節理裂隙以及施工全過程等影響的體結構模擬計算模型。
  11. In this paper, based on simulation modeling laws of geometry, constitutive relations, stress conditions and construction, a simulative calculation model has been proposed by considering the mechanical problems during the underground chamber construction and adopting constitutive models of enveloping type which can consider elasto - plastic materials and their cracking. the model can describe rock multi - media characteristic consider the interrelation of shoring structure and stratum reflect some influencing factors, for example : faultage interlayer joints, construction process and so on

    本文結合地下洞室工程施工過程中的力學問題,基於幾何、本構、應力狀態和施工過程等四方面模擬建模的原則,採用可以考慮材料彈和開裂的包絡型本構模型,建立能描述體多介質的特點和能考慮隧洞支護結構與地的相互作用,同時能反映斷、夾、節理裂隙以及施工全過程等影響的體結構模擬計算模型。
  12. The " kun ", or the immobile bottom of the structure, has on its outside sixteen circular tiers of steps paved with light - tan granite slabs, and in its interior e - metre - wide circular galleries totaling 140 metres in length and housing bronze statues of forty most outstanding figures in chinese history

    其外側共17臺階,由淡黃色花崗石塊砌成。 「坤」的內部是兩條寬6米高4米長140米的環型迴廊,設有中國歷史上最具代表的40位中華文化名人的青銅像。
  13. After the engineering slope was dug, several small plastic zone the designed rock - fill dam will coming in the temporary slope, because rock - fill dam change the stress field on a small degree. but a gravity dam will arouse a great area of plastic zone in the permanent slope, which will bring a stability problem. after detail and depth study, the rock - fill dam project is more compatible of the engineering geology condition in nuozadu hydraulic - power station ' s dam site

    工程邊坡開挖后,擬定的堆石壩方案由於嵌入淺,應力的調整有限,區主要分佈在壩頂高程附近的較小范圍內;而擬定的重力壩方案,由於嵌入深,引起了一定程度的應力調整,邊坡體表產生了鬆弛變形,區主要分佈在壩頂高程到坡頂前緣(永久邊坡)的v ivb類體分佈區。
  14. As we know, when meeting these soils, many breakdown and danger will occur, such as the blockings, which has attracted attention of many construction personal on site. however, at present, there exist many unknown fields in blocking. firstly, the definition of blocking is not interpretative

    但是,如果地是粘粒含量較少的卵石、砂土地、風化,進入壓力艙的土體就很難形成這種「流動狀態」 ,從而嚴重阻礙施工進程甚至造成施工事故,閉塞就是常見的一種施工障礙,已經引相關方面的重視。
分享友人