渡瀾 的英文怎麼說

中文拼音 [lán]
渡瀾 英文
dulan
  • : Ⅰ動詞1 (由此岸到彼岸;通過) cross (a river the sea etc ) 2 (渡過) tide over; pull through 3 ...
  • : 名詞(大波浪) billows; waves
  1. Nuozadu hydraulic - power station will be built in lantsang river in yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5, 600, 000 kilowatt

    雲南省滄江糯扎水電站,最大擬建壩高260m ,裝機容量560萬千瓦,屬特大型水電工程。
  2. Visitors can then head north to experience the death - slide over the tongjiang along the bank of the lancang river and continue on to cizhong church, then to yongzhi, nagu, and the ruins of the cemetery of stone coffins, then to the yezhisheng cave, and on to the samagong nature reserve, from which one can easily reach the cultural ruins of the new stone age in geden, the damo ancestor s cave, wujingcongshui solution cave, the ruins of the east twon of tufantieqiao, the stone gate pass, cock s stone, wuzhu dragon pool and the first bend of the yangtze

    再往北游溜筒江古,順滄江南下到茨中教堂、永芝、納古、石底石棺墓遺址、葉枝生生洞、薩馬貢自然保護區、戈登新石器時代文化遺址、達摩祖師洞、五境淙水溶洞、土蕃鐵橋東城遺址、石門關、雞公石、吾竹龍潭、長江第一灣。
  3. Nuozadu hydro - electrical power station, which is 261. 5 m dam height and 5, 850 mw installed capacity, is planned to build on the middle - lower reaches of lancang river near shimao city, yunnan province. it is planned to adopt rockfill dam and underground powerhouses in the left bank. the underground cavities mainly include three large cavities

    滄江糯扎水電站擬建壩高261 . 5m ,裝機容量5850mw ,採用左岸地下發電系統,由主廠房、主變室、尾水調壓室以及尾水洞等構成龐大而復雜的地下洞室群。
分享友人