焊接要求 的英文怎麼說

中文拼音 [hànjiēyāoqiú]
焊接要求 英文
welding requirements
  • : 動詞(用熔化的金屬修補金屬器物或使金屬工件連接起來) weld; solder
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 要動詞1. (求) demand; ask2. (強迫; 威脅) force; coerceⅡ名詞(姓氏) a surname
  • : Ⅰ動詞1 (請求; 要求) ask; beg; request; entreat; beseech : 求人幫忙 ask sb a favour; ask a favou...
  • 焊接 : weld; welding; soldering; seal; sealing; sealing-in; shutting together
  • 要求 : ask; demand; require; claim; requisition
  1. As one kind of key equipment in piping work of large - scale turbo - generator set in power plant, the machine is especially applicable to various welding bevels, flat end and angle of outer & inner diameter of ascending pipe, elbow pipe, bend, flange and etc., which greatly meets demands in pipe processing of construction site and manufacturers

    本機床是電站大型汽輪發電機組的管道施工的關鍵設備,對直管、彎管、彎頭、法蘭等管體的各種型式坡口,端平面,內外徑過緩斜度及直口,能滿足施工現場和製造廠家對各種管件的加工
  2. Connection between handrail and platform beam shall be welding. it shall be 8mm weld around the base plate of past on side. there shall be gap for water outlet

    立柱與扶手管、橫桿間採用銷釘固定或固定的方式,具體的連方式見後面的的詳細
  3. Offering options of soft / hard arc and arc force for all - position welding

    備有軟/硬電弧及推力電流選擇,實現全位置
  4. Asme boiler pressure vessel code - section 9 : welding and brazing qualifications

    Asme鍋爐和壓力容器規則.第9節:和釬的資格
  5. Tools for solderless electrical connections ; hand crimping tools ; concepts, requirements, testing

    非釬電氣連用工具.手動壓工具.概念
  6. The welding res etter especially for the big - size, complicated and demanding products

    針對面積大而復雜,焊接要求高的產品,效果優越。
  7. Attachment materials for electronic assembly - requirements for electronic grade solder alloys and fluxed and non - fluxed solid solders for electronic soldering applications

    電子組件用的連材料.電子設備用的電子分級料合金和助熔劑和非助熔劑的
  8. Attachment materials for electronic assembly - part 1 - 3 : requirements for electronic grade solder alloys and fluxed and non - fluxed solid solders for electronic soldering applications

    電子組件用連材料.第1 - 3部分:電子用電子級釬合金及有劑和無劑的固體料的
  9. The design process of the proposed method is described as follows : the input of the method is the 3d sketch of a light steelwork, and the geometry and topology information of the members in a steelwork are established automatically. the steel types and function of the linked members are determined by means of interactive scheme according to the design requirements. and the arrangement of the steel members and their orientation are built according to the steel member ' s type, the function of the steel member, the knowledge of the steelwork and welding technology

    在該方法中,首先通過交互手段輸入輕型鋼結構的三維線框簡圖、自動確定結構的幾何和拓樸信息,根據設計輸入各桿件的型鋼類型和在結構中的功能;然後,根據型鋼類型、桿件功能、鋼結構設計知識以及知識自動確定桿件的搭配關系、建立桿件的方位布置確定規則和節點板設計的規則;最後,利用這些規則來決定節點稈件連關系、連位置,確定節點板的類型、布置方位和位置,實現三維鋼結構的結構自動設計。
  10. Water - cooled secondary connection cables for resistance welding - test requirements

    電阻水冷次級線圈連電纜.試驗
  11. Water - cooled secondary connection cables for resistance welding. part 3 : test requirements

    電阻水冷次級線圈連電纜.第3部分:試驗
  12. This new product line also calls for more sophisticated technologies and commands higher gross margins

    由於無鉛機的製造技術先端,故毛利率亦較高。
  13. Welding - test for shop primers in relation to welding and allied processes - part 1 : general requirements

    .與和相關工藝有關的預塗底漆的試驗.第1部分:一般
  14. What ' s more, the application of tc11 two phase alloys to the compress disk of areoengine alredy is relatively mature, and tc11 alloy may work safely for very long time below 500 c. ti3al matrix alloy and ( a + b ) two phase alloy is connected by weld. the request of the temperature and stress can be satisfied by dual alloy disk with isothermal forged ( or hot die forging )

    選用ti _ 3al基合金tac - 1b和tc11兩相鈦合金用工藝連起來,通過熱模鍛或等溫鍛鍛造和不同的變形熱處理制度,製造出雙合金盤可以滿足溫度、應力對盤件的
  15. Technology requirement for infrared hot air reflow soldering

    紅外熱風再流技術
  16. The neutrality flux must be used before soldering

    用中性助劑。
  17. Solderless coreconnections in sleeves for telecommunication cables ; requirements, tests

    通信電纜套管的非釬芯線連.和試驗
  18. This paper discussed the total process of fabrication for big diameter vertical heat exchanger, including mostly tubesheet machining, technics request of tubesheet piecing - up, and weld request of tubesheet - to - shell ; measure of machining for square manhole and measure of square manhole - to - shell weld for preventing distortion ; taking special machining technics arid check up method for request of plane degree and check up method upon tubesheet

    介紹了大直徑立式換熱器的製造過程,主包括管板拼、加工的工藝以及管板與筒體焊接要求;同時對方形人孔的製作及其與筒體的防變形等採取了一定的措施,對管板上端面平面度的採取了特殊的加工工藝及檢驗方法。
  19. Adopted & controlled by the cnc computer with stepping motor and can be accommodated 1000 sequences of parameters for different kind of soldering purpose

    採用微電腦控制器及步進馬達裝置,能給不同焊接要求的產品提供1000個連續不同錫參數設定。
  20. So as to meet the new requirement of free - plumburm jointing of international copper foil coated panel and printing circuit board, our company introduces high quality blue kraft paper to meet the demand of the customers

    針對國際覆銅板、線路板行業的無鉛化焊接要求的新規定,我司特推出此款藍色熱壓層墊紙以滿足客戶的
分享友人