襯砌板 的英文怎麼說

中文拼音 [chènbǎn]
襯砌板 英文
liner plate
  • : Ⅰ動詞1 (在裏面托上一層) line; place sth underneath 2 (陪襯; 襯托) set off Ⅱ名詞(襯在裏面的附...
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  1. Such as : the liner of coal bunker of power station, the lining of dust cyclone and classifying cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and low friction vehicle testing surface etc

    玄武巖鑄石主要用於火電廠煤倉,各種規格旋風器,鋪設各類化工廠地面,汽車剎車試驗場地面等,也用於酸洗槽或儲存腐蝕性物品的貯存室。
  2. The cast basalt tiles may be used in all kinds of ways. such as : the liner of coal bunker of power station, the lining of dust cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and lowfriction vehicle testing surface etc

    玄武巖鑄石主要用於火電廠煤倉,各種規格旋風除塵器、旋流器、鋪設各類化工廠地面,汽車剎車試驗場地面等,也可用於酸洗槽或儲存腐蝕性物品的貯存室。
  3. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾渠工程試驗段施工情況,著重從地基處理、墊層料鋪設、混凝土原材料質量、混凝土澆築、成型混凝土割縫及養護幾個方面分析了機械化混凝土裂縫產生的主要原因,並針對性地提出了預防及控制措施。
  4. With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places

    摘要採用鐵路工程抗震設計規范、動三軸試驗及有效應力的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當隧道底坐落在5層且5層較厚時的液化區出現在隧道處;局部地段液化區出現在隧道頂部及拱腰;大部分地段的液化區出現在隧道頂上方。
  5. The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design

    試驗觀測內容包括氣溫、地溫、基土含水量、凍深、凍脹量、凍脹剩餘量、地下水位和體外觀變化等項目。通過系統的觀測,分析各因素對基土凍脹量的影響,評價各種型式的防凍西安理工大學工程碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾渠安全運行、經濟實用、防凍脹效果好的乾渠防滲型式,即混凝土下鋪設聚苯乙烯和砂礫石換填層結構型式,加以優化設計,用於工程實踐。
  6. Key issues including water plugging types, waterproof board spreading methods, drop of external water pressure and lining design for resisting hydraulic pressure, etc. were studied, thus the composite waterproof and drainage system to control drainage were put forward, including grouting sphere for water plugging, primary support, grid sysytem for waterproof and drainage and lining to resist hydraulic pressure

    重點就堵水方式、防水鋪掛形式、外水壓力的折減以及抗水壓設計等技術問題進行了研究,提出了可通過注漿堵水圈、初期支護、防排水網格和抗水壓形成綜合防排水體系,它可以達到控制排放的目的。
  7. At the same time, this paper point out it is a development direction making use of macromolecule material to develop flexible and inflexible mixed canal lining frame or flexible frame with credible technology, simple configuration and rational price

    同時,提出了增加混凝土下鋪設聚苯乙烯厚度並進行優化設計的方案,需進一步試驗研究;指出了利用高分子材料研製技術可靠、結構簡單、經濟合理的剛柔混合結構或純柔性結構作為渠道的結構,是今後渠道發展的方向。
  8. Steel - lined concrete pipe

    混凝土管
  9. Based on continuous porous medium seepage model, it is assumed that if waterproofing board of complex lining is perfect, the secondary lining is leakproof, thus the formula of external water load on secondary lining with a grouting loop is deduced

    以連續孔隙介質滲流模型為基礎,假定復合中防水施工完好二次是封閉阻水情況,推導出了有注漿堵水圈的隧道結構外水荷載計算公式。
  10. Treatment of crack in concrete plate of channel lining at xinyigou reservoir

    信邑溝水庫過壩渠道裂縫的處理
  11. Flexible poly vinyl chloride plastic sheeting for pond, canal and reservoir lining

    水塘水道和水庫用柔性聚氯乙烯塑料薄
  12. The waterproof layer and partial structures of composite linings were simulated by single and double shell concrete test slabs, and the seepage water pressure was applied to the slabs with the manual pump

    通過單層、雙層混凝土試驗對防水層及隧道的局部結構進行了模擬,並通過手動泵進行滲漏水壓加載。
  13. Model board trolley is a non - standard large mechanical equipment for tunnel construction, its main frame is a plate and beam element constructed steel structure

    臺車是隧道施工中二次用的一種大型非標機械設備,其主體結構是梁結合的鋼結構。
  14. Each of such bodies as tunnel lining, road way and road surface floorslab has only one inspection face, and the shock echo method has become a new technique for detecting thickness and defects

    摘要隧道、路道、路面樓等只有一個檢測面,沖擊回波法成為新的厚度及缺陷檢測方法。
  15. Polyethylene and ethylene copolymer plastic sheeting for pond, canal and reservoir lining

    池塘水渠和水庫用聚乙烯和乙烯共聚物塑料薄
  16. The practice shows that it is effective to decrease the cracking of the concrete lining slab through the active adoption of those measures

    實踐證明:通過採取積極的預防及控制措施,對減少混凝土襯砌板裂縫的產生是非常有效的。
  17. By comparing the computing result and the test data, the load feature of the trolley under the tunnel construction is obtained, and it is found that there is something irrational in the trolley design. some suggestions are also given for modifying the structure of the trolley

    根據實際測量數據與計算分析的結果,較全面地了解了模臺車在施工中的受力特徵,發現模臺車在結構設計中存在的不足,對其結構改進提出合理化建議。
分享友人