拖欠分期款項 的英文怎麼說
中文拼音 [tuōqiànfēnqīkuǎnxiàng]
拖欠分期款項
英文
delinquent i tallment- 拖 : 動詞1 (拉著物體使移動) pull; drag; draw; haul 2 (用拖把擦洗) mop 3 (在身後耷拉著) trail 4 ...
- 欠 : 動詞1 (睏倦時張口出氣) yawn 2 (身體一部分稍微向上移動) raise slightly (a part of the body) ...
- 分 : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
- 期 : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
- 款 : Ⅰ形容詞1 (誠懇) sincere 2 [書面語] (緩; 慢) leisurely; slow Ⅱ動詞1 (招待; 款待) receive wit...
- 項 : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
- 拖欠 : be behind in payment; be in arrears; be back; tardy; default
- 款項 : 1. (為某種用途而儲存或支出的錢) a sum of money; fund2. (條文的項目) section of an article in a legal document, etc
-
Although solving the problem radically is a long - term, hard and complicated systematic task, we must figure out the status quo of the problem and analyze the causes deeply in order to take pertinent and comprehensive measures
從根本上解決政府投資項目拖欠工程款問題,是一個長期、艱巨、復雜的系統工程,但必須首先搞清問題的現狀,深刻分析其成因,以便採取有針對性的綜合措施。The 4th section was the key section of whole article, and conducted the countermeasure study in the following law fields : engineering payment ensurence surety, legal demand on the available construction project fund, restlessly contradicted right, contract dissolution right, subrogation right, engineering payment compensation priority, the punish rule of engineering payment in arrears, construction industry enterprise law consciousness and law enforcement consciousness and level, so as to solve the problem of engineering payment in arrears in construction field radically
第四章是本文的重點部分,該章節從工程款支付保證擔保、建設項目資金到位的法定要求、不安抗辯權和合同解除權、代位權、工程款優先受償權、拖欠工程款的處罰規則、建築業企業的法律意識及執法意識和執法水平等方面進行對策性研究,以期從根本上解決建設領域的拖欠工程款問題。
分享友人