隧道施工方法 的英文怎麼說

中文拼音 [suìdàoshīgōngfāng]
隧道施工方法 英文
tunnel construction method
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  • 施工 : be in the process of construction; be under construction; build; construction
  • 方法 : method; means; way; technique; process; procedure; plan; device; recipe; fashion; tool; maneuver
  1. Based on newmark ' s step - by - step implicit integration method, the response analyses of a tunnel are performed by using viscous - spring artificial boundary under various earthquake accelerations and multiform conditions of surround rock. the seismic responses of the tunnel are calculated by changing parameters of surround rock within the tunnel some ranges. two kinds of shock absorption measures, which are setting shock layer and reinforcing surround rock are studied and shock absorption effects, applicable to cases and shock mechanism are analyze

    4計算了不同地震動作用下不同的圍巖材料對地震反應的影響,並通過改變襯砌一定范圍內圍巖材料的參數,計算了的地震反應,分析了在中設置減震層和注漿加固一定范圍內圍巖這兩種的減震效果、適用條件及其減震機理。
  2. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地水電站場內環線路黑水河溝進口滑坡體的,包括開挖的以及超前與系統支護對在滑坡體上進洞所發揮的作用。
  3. Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation

    摘要針對深圳地鐵淺埋暗挖中影響地表下降及地層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度排放地下水、根據地層條件選擇、增大左右線開挖面的距離、合理確定開挖進尺、提高效率、加強初期支護、及時作二次襯砌等對策。
  4. With the actual example of luojiang tunnel ' s crossing - over engineering, this paper probes into the design of smooth blasting in tunnel construction and some concrete methods for the tunnel support construction to provide the reference for the similar construction

    通過化州(羅江)穿越程實例,探討了光面爆破設計和支護的具體,為類似程的提供參考。
  5. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山程,首先介紹了支護結構的常用分析計算;然後通過對過程中,洞室穩定性與支護結構相互作用機理的深入分析,建立了過程的空間計算模型,提出了採用三維彈塑性有限元-無限元耦合的數值計算,綜合分析了在不同圍巖特性和圍巖類別條件下,以及不同開挖案等對圍巖整體穩定和安全性的影響,從而解決了通用有限元難以解決的三維無限域問題;其可充分發揮有限元在分析非線性面的有效性和成熟性,以及無限元在分析處理無限域和半無限域面的精確性和簡便性,為過程中圍巖的穩定性分析開辟了一條新的途徑。
  6. Abstract : the application of smoothwall blasting in crushed surrounding rock of no. 2 tunnel with crushed surrounding rock has obtained more satisfactory results through selecting rational blasting parameters, adopting right supporting method and controlling the overbreak or underbreak of the tunnel effectively, etc

    文摘:在周家山2號破碎圍巖中,應用光面爆破技術,通過選擇合理的爆破參數,正確的支護,有效地控制的超欠挖,加快掘進速度,取得了較理想的效果。
  7. The application of smoothwall blasting in crushed surrounding rock of no. 2 tunnel with crushed surrounding rock has obtained more satisfactory results through selecting rational blasting parameters, adopting right supporting method and controlling the overbreak or underbreak of the tunnel effectively, etc

    在周家山2號破碎圍巖中,應用光面爆破技術,通過選擇合理的爆破參數,正確的支護,有效地控制的超欠挖,加快掘進速度,取得了較理想的效果。
  8. The characteristics of stress and displacement in tunnel surrounding rocks are studied. the change feature of the stress in surrounding rocks and the variations of stress and the displacement of prop structure in different excavation step are analyzed with 3 dimensional fem. finally, the construction method is proved to be reasonable and scientific

    通過三維有限元計算研究了圍巖的應力、位移特徵,分析了圍巖不同開挖時步的應力變化特點以及支護結構的應力與位移的變化特徵,進而論證了該的合理性和科學性。
  9. This paper is based on the construction of jiangbei airport station of the chongqing no. 3 light railway, the control demolition applied to shallow covered and large foundation pit excavation under urban complicated condition is introduced

    摘要以重慶輕軌三號線江北機場站為例,介紹了城市復雜環境條件下淺埋、大基坑開挖控制爆破
  10. This article introduced the method of geological investigation of nanling tunnel karst disease, elaborated the tunnel engineering geology conditions, especially the karst water, the karst water power channel and the harm of karst water, and analyzed the cause that produced the karst disease

    摘要南嶺巖溶地下水活動造成地表坍陷、洞內泥砂淤塞等病害,其原因在於遺留的導洞長期疏排巖溶水,採用地質測繪、物探、鉆探、水文地質試驗等綜合勘察,查明地下水通位置、地下水流速、流向,針對病害原因,提出攔截、封團、疏排、填充等綜合整治案。
  11. Surface settlement is due to layer losses and the layer losses are due to the changes of stress state and water content. it is necessary to probe into the principle, but to pay more attention to the aftermath of layer losses - surface settlement and its regularity. this paper has focused on discussing about the regularity of surface settlement in tunneling construction

    地表之所以發生沉降,是因為發生了地層損失,而地層損失主要是由於土的應力狀態和土的含水量發生了變化,機理的探討是必要的,但是人們更關心地層損失造成的後果?地表沉降,更關心地表沉降的規律性,本文討論了過程中地表沉降的規律,將隧道施工方法分為盾構和礦山兩種,結合理論分析和實測結果,分別給出了地表沉降曲線和沉降范圍的經驗公式,其結論對北京地鐵的設計與具有重要的參考價值。
  12. Traditional mining method and natm ( new austrian tunneling method ) in mountain tunnel construction are researched in theory system, mechanical concept, designation principle and actually use. according to contrast and analysis of the usage of these two ways in construction slide, the whole process handle slide in the way of natm are deeply discussed to different kind of slide type

    對山嶺中的傳統礦山和新奧在理論體系、力學概念、設計原理、實際應用等面進行了探討,對比和分析了這兩種坍塌中的處理應用,並針對不同塌類型,深入地探討了用新奧的思路處理塌的過程。
  13. Construction methods of large - span railway station tunnels on buried weak surrounding rock

    淺埋軟弱圍巖大跨鐵路車站隧道施工方法
  14. The construction technology of twin - arch tunnel under the condition of large span, low - burying and soft surrounding rock is fully discussed and deeply studied in engineering analogy methed in the paper. with the study subject of huangmeishan tunnel of maanshan - wuhu expressway

    本論文以黃梅山為研究對象,採用程類比,系統對大跨、淺埋、軟弱圍巖條件下的雙連拱技術進行了全面的探討和深入研究。
  15. Based on the practical characteristics of large span and duplex arch of xipuling tunnel, this paper expounds the workings of regression analysis and the analytical method of monitoring and surveying data in the construction of tunnels

    摘要基於西圃嶺大跨度、雙連拱的實際特點,闡述了過程中監控量測數據的回歸分析原理及分析
  16. Finally, the special emphasis is laid upon the construction operation process of leigongshan tunnel. furthermore, analysis of results from monitoring measurement and its guide to construction operation is briefed. in addition, the bad situation in the construction process is commented

    最後扼要介紹了雷公山和過程,重點闡述了監控量測結果的分析及其在中的指導作用,並對中發生的不良現象進行了評述。
  17. Special emphasis is laid upon the construction operation process of flat tunnels with outsized span at even shallow depth, meanwhile, how to build large span flat tunnel is briefed in this article. measures taken to reduce vibrations caused by explosion in driving tunnel and surface subsidence and methods of monitoring and surveying in the course of construction are detailed in this article

    本文扼要介紹了大跨扁平,重點闡述了特大跨超淺埋扁平藝過程,對爆破振動和地表沉降的控制,以及監控量測的過程和,並通過對量測結果的分析,說明監控量測對的指導作用,並對圍巖穩定性進行了一些簡要分析。
  18. 3d fem analysis of shield driven tunnel with super shallow depth

    超淺埋盾構案三維有限元分析
  19. Combining the study characteristic and the current construction method of the bi - arch tunnel in domastic and aboard, the paper deeply study the three heading construction method and the benching tunneling construction method

    結合目前國內外對雙連拱的研究特點以及國內外對雙連拱隧道施工方法的現狀,本文針對三導坑和上下臺階進行了較為深入的研究作。
  20. Abstract : we spoke abundantly during the previous conferences on the underground space of the advantages and the inconveniences to use that almost unknown space for other purposes than only for the public utilities and even more on the construction methods used in the underground as for tunnels

    摘要:我們會經常提到利用地下空間的優點,以及除公共設以外地下空間作為其他用途時的不便,甚至是地下空間的隧道施工方法
分享友人