環境影響評估 的英文怎麼說
中文拼音 [huánjìngyǐngxiǎngpínggū]
環境影響評估
英文
environment impact assessment- 環 : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
- 境 : 名詞1 (疆界; 邊界) border; boundary 2 (地方; 區域) place; area; territory 3 (境況; 境地) co...
- 影 : Ⅰ名詞1 (物體擋住光線后映出的形象) shadow 2 (鏡中、水面等反映出來的物體形象) reflection; image...
- 評 : Ⅰ動詞1. (評論; 批評) comment; criticize; review 2. (評判) judge; appraise Ⅱ名詞(姓氏) a surname
- 估 : 估構詞成分。
- 環境 : environment; surroundings; circumstances; ambient; closeness; ambience; ambiance; atmosphere
- 評估 : estimate; assess; appraise
-
More detailed information and environmental impact assessment should be conducted to ascertain its benefices to the environment
為確定纜車對環境的好處,應提供更詳細的資料和進行環境影響評估。Impacts on the locally rare lesser club - footed bat and short - nosed fruit bat have not been fully addressed either. wbased on the above, we find the subject eia report failing to meet the requirements of the eiao tm and respectfully request the director of environmental protection to consider disapproving the captioned eia report
基於以上各點,世界自然基金會認為上水至落馬洲支線隧道高架橋方案環境影響評估報告未能符合環境影響評估程序的技術備忘錄的要求,故懇請環境保護署署長否決該申請。Environmental impact assessment ordinance register office
環境影響評估條例登記冊辦事處Environmental impact assessment appeal board regulation
環境影響評估上訴委員會7 before operation of the temporary bus depot at the project site, the permit holder shall prepare a contamination assessment plan ( cap ) in accordance with section 3 of annex 19, tm on eia process, and the propecc pn3 / 94
在工程項目地點營運臨時巴士車廠之前,許可證持有人須按照《環境影響評估程序的技術備忘錄》附件19第3節及《專業人士環保事務諮詢委員會專業守則3 / 94 》擬備一份污染評估計劃。The project is classified as a designated project by virtue of item c reclamation, hydraulic and marine facilities, dredging and dumping, item c. 10 a marine dumping area and c. 12 a dredging operation exceeding 500, 000 m
運作期間對環境可能造成的影響,並根據這兩項環境影響評估的結果,推薦一項可取的污泥卸置設施Chapters : air pollution, water pollution, contaminated land, solid waste disposal, environmental impact assessments, marine pollution, natural resources, clean renewable energy, sustainable development, environmental due diligence, and environmental enforcement
空氣污染水源污染土地污染固體廢物處理環境影響評估海洋污染天然資源清潔與再生能源持續發展環境盡職調查,及環境執法Assessment of potential environmental impact on fisheries is required for development projects involving foreshore and seabed, fish culture zones and fish ponds, in accordance with the environmental impact assessment ordinance ( cap
列于《環境影響評估條例》附表2的發展工程項目,如涉及海床、淺灘、魚類養殖區或魚塘,該發展工程項目將需要進行漁業影響評估。Wwf hong kong is greatly disappointed by the decision of the environmental protection department to approve the kcrc s sheung shui to lok ma chau spur line environmental impact assessment report. we found the adverse impacts incurred by the spur line project to be environmentally unacceptable, and the eia report failing to meet the requirements of the technical memorandum for the eia process under the eia ordinance because of the following reasons
世界自然香港基金會簡稱世界自然基金會對環保署批準九廣鐵路的上水至落馬洲支線隧道高架橋方案環境影響評估報告下稱環評報告深表失望,認為支線工程會造成不可接受的環境影響,而且環評報告亦未能符合環境影響評估程序的技術備忘錄的要求,因為:Its feasible report, initial design, land and plan proceedings together with water and land conservation program, water supply, hydrogeology argumentation, appraisal on environmental influence etc. have been got through
已完成可研、初步設計、土地及規劃手續、水土保持方案、供水水文地質可行論證,建設項目環境影響評估等。Continuing professional development training courses on environmental impact assessment ordinance and iso 14001, environmental life cycle analysis iso14040 for practicing engineers and scientists
環境影響評估條例的延續教育訓練為建造業提供的環境管理訓練The statutory process under the environmental ordinance
環境影響評估條例訂立的法定程序The path to environmental impact assessment in hong kong
邁向本港環境影響評估之途Hong kong institute of environmental impact assessment
香港環境影響評估學會3 key findings of the environmental impact assessment
3環境影響評估主要結果More on the environmental impact assessment ordinance
《環境影響評估條例》However, this sector remains the territory of anointed domestic institutions, monopolies and those with ties that can only be developed over a long period of time. all services requiring official approval at any point, such as environmental impact assessments eias and engineering services, which must be conducted through an appropriately licenced institution. such licences are usually not available to foreign operators
不過,這個領域仍是內地指定機構、專營企業及已建立長期聯系的公司的天下,例如環境影響評估及工程服務一定要由獲得許可證的合資格機構進行,而這些許可證一般不簽發予外資經營商。However, this sector remains the territory of anointed domestic institutions, monopolies and those with ties that can only be developed over a long period of time. all services requiring official approval at any point, such as environmental impact assessments ( eias ) and engineering services, which must be conducted through an appropriately licenced institution. such licences are usually not available to foreign operators
不過,這個領域仍是內地指定機構、專營企業及已建立長期聯系的公司的天下,例如環境影響評估及工程服務一定要由獲得許可證的合資格機構進行,而這些許可證一般不簽發予外資經營商。Kcrc has discussed the tunnel approach with government departments concerned and is preparing a new environmental impact assessment report for the project
九廣鐵路公司已就該隧道方案與有關政府部門蹉商,並正制訂一份新的環境影響評估報告。On 18 september 2001, the chief executive in council endorsed kcrc s proposal to adopt the bored tunnel approach for the construction of the spur line project. kcrc has discussed the tunnel approach with government departments concerned and is preparing a new environmental impact assessment report for the project
於2001年9月18日,行政長官會同行政會議同意九廣鐵路公司的建議,採用隧道方案建造支線項目工程。九廣鐵路公司已就該隧道方案與有關政府部門蹉商,並正制訂一份新的環境影響評估報告。分享友人