bridge-work 中文意思是什麼

bridge-work 解釋
橋梁工事;(假牙的)齒橋。

  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. 3. as to vehicle - bridge system coupling vibration, this difficulty in engineering industry, it was abstractly summarized in this thesis, and introduce a method to establish and resolve equations about such coupling vibration, bring forward a flow chart to write correlative software ; with the help of ansys, make out some work about preparatory simulation, so as to research basic point of chicle - bridge system coupling vibration

    3 、對車橋耦合振動這一業內的難點進行了理論上的分析,引入了一種建立和求解車橋耦合振動系統方程的較為典型的方法,提出了一份自行編製程序的流程簡圖;借用ansys軟體對該橋做了車橋耦合振動的初步模擬計算,探索車橋共振的基本特點。
  3. Comparing with the same category overseas jointless bridges, the new type bridge has more reasonable structure, more simple and convenient construction, and better use effect etc. the main work in this paper is described as follows : ( 1 ) this paper introduces phylogeny and reseach survey of the joints bridge inland and abroad, and a new jointless bridge structure ? new type semi - integral abutment bridge is based on these, which characteristic of own structure and setting of primary component are expatiated. ( 2 ) this paper analyses influence of temperature effect, creep, shrinkage and circumambient soil of run - on slab on the new type structure, and analyses the forcing performance of beam, abutment and run - on slab of the new type semi - integral abutment bridge, and constrast to the same category joints bridges

    本文主要做了以下工作: ( 1 )介紹了無縫橋梁在國內外的發展歷史、研究概況,並在此基礎上提出了一種新的無縫橋梁結構形式-新型半整體式無縫橋梁,闡述了它特有的結構形式以及主要構件的設置; ( 2 )分析了溫度效應、徐變和收縮以及搭板周圍土體對這種新型結構的影響,對新型半整體式無縫橋主梁、橋臺以及搭板進行了受力性能分析,並和同類無縫橋梁進行了對比分析。
  4. Bridge design is probably the hardest brain work in civil engineering.

    在土木工程中,橋梁設計大概是艱苦的腦力勞動了。
  5. The engineers set to on repair work to the bridge.

    工程師奮力進行修橋工作。
  6. The solicitation, development and rupture of craze in exiguous hierarchy play a connective work in the course of polymer ' s damage and rupture. it is a bridge in distortion mechanism of macroscopical and microcosmic

    大部分高聚物的力學性能依賴于溫度、持荷時間、加載速率和環境等因素,其中,溫度和時間的依賴性尤為顯著。
  7. The solicitation development and rupture of craze in exiguous hierarchy play an connective work in the course of polymer ' s damage and rupture, it is a bridge in distortion mechanism of macroscopical and microcosmic

    細觀層次的銀紋引發、生長和斷裂在聚合物損傷斷裂的整個過程中起著承前啟后的作用,它是溝通宏、微觀變形機制的橋梁。
  8. I understand your needs and i know the posts must be exterminated and the bridge covered while you do your work.

    我懂得你的需要,我知道在你執行任務的時候必須拔掉哨所,掩護橋頭。
  9. Abstract : with the composite process of root - pile and infilling consolidation by cement injection with foraminate - steel - tube ; good effect has been made in the treat of sideslip of one fly - over bridge. the work machanism and technology of cement injection with foraminate - steel - tube are discussed in following article

    文摘:用樹根樁及帶眼鋼管充填壓密灌漿工藝復合處理某立交橋側移的實踐取得很好實效;對帶眼鋼管灌漿的工藝與機理作了討論,認為其具有廣闊的應用前景。
  10. The steel constructions workshop building of bao ji bridge girder plant is typical large workshop, in which the main work procedure of sparge little steel ball and burnish is to eliminate rust and polish the surface of steel bridge workpiecs. during the process of burnishing, it will produce large quantity of dust

    寶雞橋梁廠鋼結構車間噴丸打磨廠房是典型的高大廠房建築,其工序是對橋梁鋼型結構件表面進行噴丸打磨、拋光除銹。
  11. Prospect dtzziii series weight - load controller sensor part adopt bridge - type strain piece sensor, and applies steady installation technology to insure sensors running steady and long - range. we provide multi - kinds of sensor installation method. sensor can be installed under the car bottom, on elevator rope hitch plate, on car top wheel and axle and car top beam to work together with controller

    前景dtzziii系列稱重控制儀的稱重傳感器部分採用橋式應變片傳感器,應用平穩安裝技術確保長期穩定運行稱重傳感器提供多種安裝方式,可以安裝于活轎底電梯的轎廂轎底電梯繩頭板處電梯轎頂輪軸處電梯轎頂橫樑上面等,與控制儀配合使用。
  12. Will have to work very hard to unseat wayne bridge

    將會需要非常地加油才能夠奪去韋恩布里奇的位置。
  13. Our work on the new bridge went ahead like wildfire

    我們的建橋工程如火如荼地開展起來了。
  14. In this thesis, one cycle controlled switching power amplifier is analyzed detailed in theory and researched in simulation and experiment. main work and conclusion are described below. first, the basic structure and operational principle of one cycle controlled half - bridge and bridge circuit are analyzed, and control equation are deduced

    主要工作和結論如下:首先,對單周控制的半橋和全橋開關功率放大器的基本結構和工作原理進行了分析,推導了具體的控制方程,建立了單周控制的全橋開關功率放大器的小信號模型。
  15. Cable stayed bridge - asphalt paving work

    斜拉橋-瀝青鋪設工程
  16. We must work passionately and indefatigably to bridge the gulf between our scientific progress and our moral progress

    我們必須熱情而不知疲倦地努力縮減科學發展與道德發展之間的鴻溝。
  17. The old lo wu railway bridge and the lo wu old pedestrian bridge formed a serious bottleneck for flood flows. upon completion of the bridge work and improvement of the river section at lo wu in early 2004, the bottleneck at lo wu will be removed and the flooding risk upstream of lo wu can be reduced in time for the 2004 wet season

    他指出,現有的羅湖鐵路橋和羅湖舊行人橋形成嚴重的瓶頸地帶,這兩條橋的重建工程以及羅湖河段的改善工程於二四年年初完成後,羅湖的瓶頸地帶將會消失,而羅湖上游在二四年雨季的水浸風險亦將會減少。
  18. After acquiring the land for the hsr chiayi station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, water engineering, foul sewer, public illumination, traditional piping and bridge work

    高鐵嘉義車站特定區區段徵收公共工程施工項目包括:整地工程道路工程雨水下水道工程公共照明工程交通設施工程停車場工程污水下水道工程共同管道工程自來水工程及相關管線埋設工程等。
  19. After acquiring the land for the hsr taoyuan station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, public illumination, transportation facilities, parking lot, foul sewer, irrigation, transplanting, common duct, water engineering, piping and bridge work

    高鐵桃園車站特定區區段徵收公共工程施工項目包括:整地工程道路工程雨水下水道工程公共照明工程交通設施工程停車場工程污水下水道工程灌溉工程植栽移植工程共同管道工程自來水工程相關管線埋設工程及橋梁工程等。
  20. After acquiring the land for the hsr taichung station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, water engineering, foul sewer, public illumination, traditional piping and bridge work

    高鐵臺中車站地區區段徵收公共工程施工項目包括:整地工程道路工程排水工程自來水工程污水工程公共照明工作及傳統管線埋設工程橋梁工程等。
分享友人